{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T23:03:03Z","timestamp":1777417383212,"version":"3.51.4"},"publisher-location":"Cham","reference-count":16,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319293561","type":"print"},{"value":"9783319293578","type":"electronic"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-29357-8_11","type":"book-chapter","created":{"date-parts":[[2016,2,3]],"date-time":"2016-02-03T11:24:57Z","timestamp":1454498697000},"page":"115-126","source":"Crossref","is-referenced-by-count":2,"title":["Robust Scheduling Subject to Multi-project Environment Constraints"],"prefix":"10.1007","author":[{"given":"Grzegorz","family":"Bocewicz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Krzysztof","family":"Bzdyra","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zbigniew","family":"Banaszak","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,2,4]]},"reference":[{"issue":"2","key":"11_CR1","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K Bouleimen","year":"2003","unstructured":"Bouleimen, K., Lecocq, H.: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. Eur. J. Oper. Res. 149(2), 268\u2013281 (2003)","journal-title":"Eur. J. Oper. Res."},{"key":"11_CR2","doi-asserted-by":"publisher","first-page":"4804","DOI":"10.1016\/j.ins.2011.06.014","volume":"181","author":"L Wang","year":"2011","unstructured":"Wang, L., Fang, C.: An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem. Inf. Sci. 181, 4804\u20134822 (2011)","journal-title":"Inf. Sci."},{"issue":"6","key":"11_CR3","doi-asserted-by":"crossref","first-page":"1271","DOI":"10.1007\/s10845-013-0729-y","volume":"25","author":"Quang-Vinh Dang","year":"2013","unstructured":"Dang, Q.-V., Nielsen, I., Steger-Jensen, K., Madsen, O.: Scheduling a single mobile robot for part-feeding tasks of production lines. J. Intell. Manuf. 25(6), 1271\u20131287","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"11_CR4","doi-asserted-by":"publisher","first-page":"1818","DOI":"10.1016\/j.ejor.2005.02.077","volume":"175","author":"GE Khayat","year":"2006","unstructured":"Khayat, G.E., Langevin, A., Riope, D.: Integrated production and material handling scheduling using mathematical programming and constraint programming. Eur. J. Oper. Res. 175(3), 1818\u20131832 (2006)","journal-title":"Eur. J. Oper. Res."},{"key":"11_CR5","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1287\/ijoc.11.2.173","volume":"11","author":"JT Linderoth","year":"1999","unstructured":"Linderoth, J.T., Savelsbergh, M.W.P.: A computational study of branch and bound search strategies for mixed integer programming. INFORMS J. Comput. 11, 173\u2013187 (1999)","journal-title":"INFORMS J. Comput."},{"key":"11_CR6","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1016\/S0167-5060(08)70351-0","volume":"5","author":"EML Beale","year":"1979","unstructured":"Beale, E.M.L.: Branch and bound methods for mathematical programming systems. Ann. Discret. Math. 5, 201\u2013219 (1979)","journal-title":"Ann. Discret. Math."},{"key":"11_CR7","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1007\/978-3-319-05353-0_25","volume":"267","author":"P Sitek","year":"2014","unstructured":"Sitek, P.: A hybrid approach to the two-echelon capacitated vehicle routing problem (2E-CVRP). Adv. Intell. Syst. Comput. 267, 251\u2013263 (2014)","journal-title":"Adv. Intell. Syst. Comput."},{"key":"11_CR8","unstructured":"Kanagasabapathi, B., Ananthanarayanan, K.: A simulation model for resource constrained scheduling of multiple projects. In: 21st Annual ARCOM Conference, SOAS, vol. 2, pp. 823\u2013831. University of London. Association of Researchers in Construction Management (2005)"},{"issue":"2","key":"11_CR9","doi-asserted-by":"publisher","first-page":"212","DOI":"10.1016\/j.ijpe.2010.03.009","volume":"126","author":"TR Browning","year":"2010","unstructured":"Browning, T.R., Yassine, A.A.: Resource-constrained multi-project scheduling: priority rule performance revisited. Int. J. Prod. Econ. 126(2), 212\u2013228 (2010)","journal-title":"Int. J. Prod. Econ."},{"key":"11_CR10","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1007\/s10601-011-9115-6","volume":"17","author":"M Lombardi","year":"2012","unstructured":"Lombardi, M., Milano, M.: Optimal methods for resource allocation and scheduling: a cross-disciplinary survey. Constraints 17, 51\u201385 (2012)","journal-title":"Constraints"},{"key":"11_CR11","doi-asserted-by":"crossref","unstructured":"Schwindt, C., Zimmermann, J.: Handbook on Project Management and Scheduling (2015)","DOI":"10.1007\/978-3-319-05915-0"},{"key":"11_CR12","unstructured":"Leung, J.Y-T., Anderson J.H.: Handbook of Scheduling: Algorithms, Models, and Performance Analysis. Chapman & Hall\/CRC (2004)"},{"key":"11_CR13","doi-asserted-by":"crossref","unstructured":"Bzdyra, K., Banaszak, Z., Bocewicz, G.: Multiple project portfolio scheduling subject to mass customized service. Progress in Automation, Robotics and Measuring Techniques. Series: Advances in Intelligent Systems and Computing, vol. 350, pp. 11\u201321. Springer (2015)","DOI":"10.1007\/978-3-319-15796-2_2"},{"key":"11_CR14","doi-asserted-by":"publisher","first-page":"70","DOI":"10.4028\/www.scientific.net\/AMM.791.70","volume":"791","author":"K Bzdyra","year":"2015","unstructured":"Bzdyra, K., Bocewicz, G., Banaszak, Z.: Mass customized projects portfolio scheduling\u2014imprecise operations time approach. Appl. Mech. Mater. 791, 70\u201380 (2015)","journal-title":"Appl. Mech. Mater."},{"issue":"3","key":"11_CR15","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1515\/fman-2015-0014","volume":"6","author":"Z Banaszak","year":"2014","unstructured":"Banaszak, Z., Bocewicz, G.: Declarative modeling for production orders portfolio scheduling. Found. Manag. 6(3), 7\u201324 (2014)","journal-title":"Found. Manag."},{"issue":"3","key":"11_CR16","first-page":"636","volume":"63","author":"G Bocewicz","year":"2015","unstructured":"Bocewicz, G., Muszy\u0144ski, W., Banaszak, Z.: Models of multimodal networks and transport processes. Bull. Pol. Acad. Sci. Tech. Sci. 63(3), 636\u2013650 (2015)","journal-title":"Bull. Pol. Acad. Sci. Tech. Sci."}],"container-title":["Advances in Intelligent Systems and Computing","Challenges in Automation, Robotics and Measurement Techniques"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-29357-8_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T09:05:55Z","timestamp":1559379955000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-29357-8_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319293561","9783319293578"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-29357-8_11","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"value":"2194-5357","type":"print"},{"value":"2194-5365","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016]]}}}