{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T02:41:02Z","timestamp":1725849662849},"publisher-location":"Cham","reference-count":26,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319301419"},{"type":"electronic","value":"9783319301426"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-30142-6_13","type":"book-chapter","created":{"date-parts":[[2016,2,24]],"date-time":"2016-02-24T11:36:41Z","timestamp":1456313801000},"page":"228-249","source":"Crossref","is-referenced-by-count":3,"title":["GQM-Based Definition and Evaluation of Software Project Success Indicators"],"prefix":"10.1007","author":[{"given":"Luigi","family":"Lavazza","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Enrico","family":"Frumento","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Riccardo","family":"Mazza","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,2,25]]},"reference":[{"key":"13_CR1","unstructured":"MUSES project. https:\/\/www.musesproject.eu\/"},{"issue":"6","key":"13_CR2","doi-asserted-by":"publisher","first-page":"728","DOI":"10.1109\/TSE.1984.5010301","volume":"10","author":"V Basili","year":"1984","unstructured":"Basili, V., Weiss, D.: A methodology for collecting valid software engineering data. IEEE Trans. Softw. Eng. 10(6), 728\u2013738 (1984)","journal-title":"IEEE Trans. Softw. Eng."},{"issue":"6","key":"13_CR3","doi-asserted-by":"publisher","first-page":"758","DOI":"10.1109\/32.6156","volume":"14","author":"V Basili","year":"1988","unstructured":"Basili, V., Rombach, H.D.: The TAME project: towards improvement-oriented software environments. IEEE Trans. Softw. Eng. 14(6), 758\u2013773 (1988)","journal-title":"IEEE Trans. Softw. Eng."},{"key":"13_CR4","volume-title":"Encyclopedia of Software Engineering","author":"V Basili","year":"1994","unstructured":"Basili, V., Caldiera, G., Rombach, H.D.: Goal\/Question\/Metric paradigm. In: Marciniak, J.J. (ed.) Encyclopedia of Software Engineering, vol. 1. Wiley, New York (1994)"},{"issue":"4","key":"13_CR5","doi-asserted-by":"publisher","first-page":"411","DOI":"10.1145\/292182.292197","volume":"7","author":"A Fuggetta","year":"1998","unstructured":"Fuggetta, A., Lavazza, L., Morasca, S., Cinti, S., Oldano, G., Orazi, E.: Applying G\/Q\/M in an industrial software factory. ACM Trans. Softw. Eng. Methodol. 7(4), 411\u2013448 (1998)","journal-title":"ACM Trans. Softw. Eng. Methodol."},{"key":"13_CR6","doi-asserted-by":"crossref","unstructured":"Birk, A., van Solingen, R., Jarvinen, J.: Business impact, benefit, and cost of applying gqm in industry: an in-depth, long-term investigation at Schlumberger RPS. In: 5th International Symposium on Software Metrics (1998)","DOI":"10.1109\/METRIC.1998.731231"},{"key":"13_CR7","unstructured":"Birk, A., Hamann, D., Pfahl, D., Jrvinen, J., Oivo, M., Vierimaa, M., van Solingen, R.: The Role of GQM in the PROFES Improvement Methodology (1999)"},{"key":"13_CR8","unstructured":"van Solingen, R., Berghout, E.: Integrating goal-oriented measurement in industrial software engineering: industrial experiences with and additions to the Goal\/Question\/Metric method (GQM). In: 7th International Software Metrics Symposium (2001)"},{"key":"13_CR9","unstructured":"Lavazza, L.: Multi-scope evaluation of public administration initiatives in process automation. In: 5th European Conference on Information Management and Evaluation (2011)"},{"key":"13_CR10","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1007\/11754305_9","volume-title":"Software Process Change","author":"L Lavazza","year":"2006","unstructured":"Lavazza, L., Mauri, M.: Software process measurement in the real world: dealing with operating constraints. In: Wang, Q., Pfahl, D., Raffo, D.M., Wernick, P. (eds.) SPW\/ProSim 2006. LNCS, vol. 3966, pp. 80\u201387. Springer, Heidelberg (2006)"},{"key":"13_CR11","doi-asserted-by":"crossref","unstructured":"Lavazza, L., Barresi, G.: Automated support for process-aware definition and execution of measurement plans. In: International Conference on Software Engineering (2005)","DOI":"10.1145\/1062455.1062507"},{"issue":"140","key":"13_CR12","first-page":"1","volume":"22","author":"R Likert","year":"1932","unstructured":"Likert, R.: Technique for the measure of attitudes. Arch. Psychol. 22(140), 1\u201355 (1932)","journal-title":"Arch. Psychol."},{"key":"13_CR13","volume-title":"Usability Evaluation in Industry","author":"J Brooke","year":"1996","unstructured":"Brooke, J.: SUS: a \u201cquick and dirty\u201d usability scale. In: Jordan, P., Thomas, B., Weerdemeester, B. (eds.) Usability Evaluation in Industry. Taylor and Francis, London (1996)"},{"key":"13_CR14","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1007\/978-3-642-02806-9_12","volume-title":"Human Centered Design","author":"JR Lewis","year":"2009","unstructured":"Lewis, J.R., Sauro, J.: The factor structure of the system usability scale. In: Kurosu, M. (ed.) HCD 2009. LNCS, vol. 5619, pp. 94\u2013103. Springer, Heidelberg (2009)"},{"issue":"2","key":"13_CR15","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1111\/j.1540-5915.2008.00192.x","volume":"39","author":"V Venkatesh","year":"2008","unstructured":"Venkatesh, V., Bala, H.: Technology acceptance model 3 and a research agenda on interventions. Decis. Sci. 39(2), 273\u2013312 (2008)","journal-title":"Decis. Sci."},{"key":"13_CR16","unstructured":"Ripley, B., Lapsley, M.: Package RODBC - ODBC Database Access (2014)"},{"key":"13_CR17","unstructured":"Basili, V.: Applying the Goal\/Question\/Metric paradigm in the experience factory. In: 10th Annual CSR Workshop, Application of Software Metrics and Quality Assurance in Industry (1993)"},{"issue":"1","key":"13_CR18","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0164-1212(02)00138-3","volume":"70","author":"J Muench","year":"2004","unstructured":"Muench, J., Heidrich, J.: Software project control centers: concepts and approaches. J. Syst. Softw. 70(1), 3\u201319 (2004)","journal-title":"J. Syst. Softw."},{"key":"13_CR19","doi-asserted-by":"crossref","unstructured":"Nicho, M., Cusack, B.: A metrics generation model for measuring the control objectives of information systems audit. In: 40th Annual Hawaii International Conference on System Sciences (2007)","DOI":"10.1109\/HICSS.2007.21"},{"key":"13_CR20","volume-title":"Goal-Driven Software Measurement. A Guidebook","author":"RE Park","year":"1996","unstructured":"Park, R.E., Goethert, W.B., Florac, W.A.: Goal-Driven Software Measurement. A Guidebook. Software Engineering Inst., Carnegie-Mellon Univ. (1996)"},{"key":"13_CR21","unstructured":"ISACA: COBIT 5: A Business Framework for the Governance and Management of Enterprise IT (2012)"},{"key":"13_CR22","doi-asserted-by":"crossref","unstructured":"Tsunoda, M., Matsumura, T., Matsumoto, K.I.: Modeling software project monitoring with stakeholders. In: 9th International Conference on Computer & Information Science (2010)","DOI":"10.1109\/ICIS.2010.84"},{"issue":"4","key":"13_CR23","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1109\/MC.2010.108","volume":"43","author":"V Basili","year":"2010","unstructured":"Basili, V., Lindvall, M., Regardie, M., Seaman, C., Heidrich, J., Munch, J., Rombach, D., Trendowicz, A.: Linking software development and business strategy through measurement. Computer 43(4), 57\u201365 (2010)","journal-title":"Computer"},{"key":"13_CR24","doi-asserted-by":"crossref","unstructured":"Souza Cardoso, E.C.: Towards a methodology for goal-oriented enterprise management. In: Enterprise Distributed Object Computing Conference Workshops (2013)","DOI":"10.1109\/EDOCW.2013.17"},{"issue":"3","key":"13_CR25","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1080\/10618600.1996.10474713","volume":"5","author":"R Ihaka","year":"1996","unstructured":"Ihaka, R., Gentleman, R.: R: a language for data analysis and graphics. J. Comput. Graphical Stat. 5(3), 299\u2013314 (1996)","journal-title":"J. Comput. Graphical Stat."},{"key":"13_CR26","unstructured":"The R Project for Statistical Computing. http:\/\/www.r-project.org"}],"container-title":["Communications in Computer and Information Science","Software Technologies"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-30142-6_13","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,14]],"date-time":"2024-06-14T15:35:51Z","timestamp":1718379351000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-30142-6_13"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319301419","9783319301426"],"references-count":26,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-30142-6_13","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2016]]}}}