{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T06:32:33Z","timestamp":1743057153374,"version":"3.40.3"},"publisher-location":"Cham","reference-count":17,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319303352"},{"type":"electronic","value":"9783319303376"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-30337-6_2","type":"book-chapter","created":{"date-parts":[[2016,3,23]],"date-time":"2016-03-23T13:54:52Z","timestamp":1458741292000},"page":"21-29","source":"Crossref","is-referenced-by-count":1,"title":["Improving the Delivery of a Building"],"prefix":"10.1007","author":[{"given":"Vince","family":"Thomson","sequence":"first","affiliation":[]},{"given":"Xiaoqi","family":"Zhang","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,3,24]]},"reference":[{"key":"2_CR1","doi-asserted-by":"crossref","unstructured":"Ahmed, S., Ahmad, I., Azhar, S., Mallikarjuna, S.: Implementation of enterprise resource planning (ERP) systems in the construction industry. In: ASCE Construction Research Congress\u2014Wind of Change: Integration and Innovation, Honolulu, 1\u20138 Mar 2003","DOI":"10.1061\/40671(2003)125"},{"key":"2_CR2","unstructured":"Aliaari, M., Najarian, E.: Sutter Health Eden Medical Center: structural engineer\u2019s active role in an IPD project with lean and BIM components. Struct. Mag., 32\u201334 (2013, Aug)"},{"key":"2_CR3","doi-asserted-by":"crossref","unstructured":"Anaconda, D., Cladwell, D.: Improving the performance of productivty teams. Res. Technol. Manag., 37\u201343 (2007, Sept\u2013Oct)","DOI":"10.1080\/08956308.2007.11657460"},{"key":"2_CR4","first-page":"36","volume":"21","author":"C Connell","year":"2013","unstructured":"Connell, C.: What\u2019s new in real-time location systems? Wirel. Des. Dev. 21, 36\u201337 (2013)","journal-title":"Wirel. Des. Dev."},{"issue":"7","key":"2_CR5","doi-asserted-by":"publisher","first-page":"595","DOI":"10.1080\/09511920701501753","volume":"22","author":"HB Jun","year":"2009","unstructured":"Jun, H.B., Shin, J.H., Kim, Y.S., Kiritsis, D., Xirouchakis, P.: A framework for RFID applications in product lifecycle management. Int. J. Comput. Integr. Manuf. 22(7), 595\u2013615 (2009)","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"2_CR6","unstructured":"Khemlani, L.: Sutter Medical Center Castro Valley: case study of an IPD project. AECbytes, 1\u201311, 06 Mar 2009. http:\/\/www.aecbytes.com\/buildingthefuture\/2009\/Sut-ter_IPDCaseStudy.html . Accessed 27 Aug 15"},{"key":"2_CR7","unstructured":"National BIM Standard: Frequently asked questions about the National BIM Standard. National BIM Standard (United States). Nationalbimstandard.org. Accessed 24 Aug 2015"},{"key":"2_CR8","unstructured":"National Research Council Canada: GPS reduces construction cost. Dimensions (6) (2011)"},{"key":"2_CR9","unstructured":"Palmer, W.D.: Tracking precast pieces: technology that works. Concr. Construction (2011, Oct)"},{"issue":"2","key":"2_CR10","doi-asserted-by":"publisher","first-page":"196","DOI":"10.1016\/j.aei.2009.09.001","volume":"24","author":"W Shen","year":"2010","unstructured":"Shen, W., Hao, Q., Mak, H., Neelamkavil, J., Xie, H., Dickinson, J., Thomas, R., Pardasani, A., Xue, H.: Systems integration and collaboration in architecture, engineering, construction, and facilities management: a review. Adv. Eng. Inf. 24(2), 196\u2013207 (2010)","journal-title":"Adv. Eng. Inf."},{"key":"2_CR11","doi-asserted-by":"crossref","unstructured":"Soleimanifar, M., Beard, D., Sissons, P., Lu, M., Carnduff, M.: The autonomous real-time system for ubiquitous construction resource tracking. In: Proceedings of the 30th ISARC, Montreal, Canada (2013)","DOI":"10.22260\/ISARC2013\/0162"},{"key":"2_CR12","unstructured":"Staub-French, S., Forques, D., Iordanova, I., Kassalan, A., Abdulall, B., Samilski, M., Cavka, H., Nepal, M.: Building information modeling (BIM) \u2018best practices\u2019 project report. University of British Colombia (2011). http:\/\/bim-civil.sites.olt.ubc.ca\/files\/2014\/06\/BIMBestPractices2011.pdf . Accessed 27 Aug 2015"},{"key":"2_CR13","unstructured":"Swedberg, C.: RFID, GPS bring visibility to construction of BP oil platform. RFID J. (2013, May 08). http:\/\/www.rfidjournal.com\/articles\/view?10659 . Accessed 27 Aug 2015"},{"key":"2_CR14","doi-asserted-by":"crossref","unstructured":"Thomson, J., Thomson, V.: Using boundary management for more effective product development. Technol. Innov. Manag. Rev., 23\u201327 (2013, Oct)","DOI":"10.1109\/IDAM.2014.6912659"},{"key":"2_CR15","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1007\/978-3-642-35852-4_9","volume-title":"Service Orientation in Holonic and Multi Agent Manufacturing and Robotics","author":"Damien Trentesaux","year":"2013","unstructured":"Trentesaux, D., Thomas, A.: Product-driven control: concept, literature review and future trends. In: Borangiu, T., Thomas, A., Trentesaux, D. (eds.) Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, vol. 472, pp. 135\u2013150. Springer, Heidelberg (2013)"},{"key":"2_CR16","unstructured":"Wharton: How apple made \u2018vertical integration\u2019 hot again\u2014too hot, maybe (2012). http:\/\/business.time.com\/2012\/03\/16\/how-apple-made-vertical-integration-hot-again-too-hot-maybe\/ . Accessed 1 Oct 2015"},{"issue":"8","key":"2_CR17","doi-asserted-by":"crossref","first-page":"081009","DOI":"10.1115\/1.4027495","volume":"136","author":"David C. Wynn","year":"2014","unstructured":"Wynn, D., Caldwell, H., Clarkson, J.: Predicting change propagation in complex design workflows. ASME J. Mech. Des. 136(8) (2014)","journal-title":"Journal of Mechanical Design"}],"container-title":["Studies in Computational Intelligence","Service Orientation in Holonic and Multi-Agent Manufacturing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-30337-6_2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,16]],"date-time":"2022-06-16T01:51:14Z","timestamp":1655344274000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-30337-6_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319303352","9783319303376"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-30337-6_2","relation":{},"ISSN":["1860-949X","1860-9503"],"issn-type":[{"type":"print","value":"1860-949X"},{"type":"electronic","value":"1860-9503"}],"subject":[],"published":{"date-parts":[[2016]]}}}