{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,23]],"date-time":"2025-10-23T11:11:11Z","timestamp":1761217871763},"publisher-location":"Cham","reference-count":17,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319331102"},{"type":"electronic","value":"9783319331119"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-33111-9_18","type":"book-chapter","created":{"date-parts":[[2016,4,20]],"date-time":"2016-04-20T13:17:12Z","timestamp":1461158232000},"page":"193-202","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Comparing BIM in Construction with 3D Modeling in Shipbuilding Industries: Is the Grass Greener on the Other Side?"],"prefix":"10.1007","author":[{"given":"Ran","family":"Luming","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vishal","family":"Singh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,4,21]]},"reference":[{"issue":"3","key":"18_CR2","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127","volume":"11","author":"S Azhar","year":"2011","unstructured":"Azhar, S.: Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership. Manage. Eng. 11(3), 241\u2013252 (2011)","journal-title":"Leadership. Manage. Eng."},{"issue":"6","key":"18_CR3","doi-asserted-by":"publisher","first-page":"643","DOI":"10.1016\/S0048-7333(97)00040-1","volume":"26","author":"Y Baba","year":"1998","unstructured":"Baba, Y., Nobeoka, K.: Towards knowledge-based product development: the 3-D CAD model of knowledge creation. Res. Policy 26(6), 643\u2013659 (1998)","journal-title":"Res. Policy"},{"key":"18_CR4","first-page":"149","volume":"24","author":"K Barlish","year":"2012","unstructured":"Barlish, K., Sullivan, K.: How to measure the benefits of BIM\u2014A case study approach. Autom. AEC 24, 149\u2013159 (2012)","journal-title":"Autom. AEC"},{"issue":"2","key":"18_CR5","first-page":"185","volume":"15","author":"B Becerik-Gerber","year":"2010","unstructured":"Becerik-Gerber, B., Rice, S.: The perceived value of building information modeling in the US building industry. J. Inf. Technol. Constr. 15(2), 185\u2013201 (2010)","journal-title":"J. Inf. Technol. Constr."},{"key":"18_CR7","volume-title":"Adopting BIM for Facilities Management: Solutions for Managing the Sydney Opera House","author":"CRC AEC Innovation","year":"2007","unstructured":"CRC AEC Innovation: Adopting BIM for Facilities Management: Solutions for Managing the Sydney Opera House. Cooperative Research Center for AEC Innovation, Brisbane (2007)"},{"issue":"5","key":"18_CR8","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1108\/09576060210429748","volume":"13","author":"H Kim","year":"2002","unstructured":"Kim, H., et al.: Applying digital manufacturing technology to ship production and the maritime environment. Integr. Manuf. Syst. 13(5), 295\u2013305 (2002)","journal-title":"Integr. Manuf. Syst."},{"key":"18_CR9","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.cad.2014.09.001","volume":"59","author":"M Kim","year":"2015","unstructured":"Kim, M., et al.: A vision-based system for monitoring block assembly in shipbuilding. Comput. Aided Des. 59, 98\u2013108 (2015)","journal-title":"Comput. Aided Des."},{"issue":"2","key":"18_CR10","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.autcon.2010.09.006","volume":"20","author":"WWS Lu","year":"2011","unstructured":"Lu, W.W.S., Li, H.: Building information modeling and changing construction practices. Autom. Constr. 20(2), 99\u2013100 (2011)","journal-title":"Autom. Constr."},{"issue":"1","key":"18_CR11","first-page":"1","volume":"6","author":"Y Okumoto","year":"2009","unstructured":"Okumoto, Y., Hiyoku, K., Uesugi, N.: Simulation based production using 3-D CAD in shipbuilding. Int. J. CAD\/CAM 6(1), 1\u201310 (2009)","journal-title":"Int. J. CAD\/CAM"},{"issue":"20","key":"18_CR12","doi-asserted-by":"publisher","first-page":"4653","DOI":"10.1080\/00207540600609214","volume":"45","author":"M-I Roh","year":"2007","unstructured":"Roh, M.-I., Lee, K.-Y.: Generation of production material information for a building block and simulation of block erection for process planning and scheduling in shipbuilding. Int. J. Prod. Res. 45(20), 4653\u20134683 (2007a)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"18_CR13","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1016\/j.compind.2006.12.003","volume":"58","author":"M-I Roh","year":"2007","unstructured":"Roh, M.-I., Lee, K.-Y.: Generation of the 3D CAD model of the hull structure at the initial ship design stage and its application. Comput. Ind. 58(6), 539\u2013557 (2007b)","journal-title":"Comput. Ind."},{"key":"18_CR14","volume-title":"Computer aided design and manufacturing","author":"MMM Sarcar","year":"2008","unstructured":"Sarcar, M.M.M., Rao, K.M., Narayn, K.L.: Computer aided design and manufacturing. PHI Learning Pvt. Ltd., New Delhi (2008)"},{"issue":"2","key":"18_CR15","first-page":"134","volume":"20","author":"V Singh","year":"2011","unstructured":"Singh, V., Ning, G., Wang, X.: A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Autom. AEC 20(2), 134\u2013144 (2011)","journal-title":"Autom. AEC"},{"key":"18_CR16","doi-asserted-by":"crossref","unstructured":"Solesvik, M.Z.: A collaborative design in shipbuilding: two case studies. In: 2007 5th IEEE International Conference on Industrial Informatics, vol. 1. IEEE (2007)","DOI":"10.1109\/INDIN.2007.4384773"},{"issue":"3","key":"18_CR18","first-page":"357","volume":"18","author":"B Succar","year":"2009","unstructured":"Succar, B.: Building information modelling framework: A research and delivery foundation for industry stakeholders. Autom. AEC 18(3), 357\u2013375 (2009)","journal-title":"Autom. AEC"},{"key":"18_CR19","unstructured":"Tholen, J., Ludwig. T.: Shipbuilding in Europe. Structure, Employment, Perspectives. University of Bremen, Institute Labour and Economy (2006)"},{"issue":"4","key":"18_CR20","doi-asserted-by":"crossref","first-page":"230","DOI":"10.5957\/jsp.2003.19.4.230","volume":"19","author":"RI Whitfield","year":"2003","unstructured":"Whitfield, R.I., Duffy, A.H.B., Meehan, J.: Ship product modeling. J. Ship Prod. 19(4), 230\u2013245 (2003)","journal-title":"J. Ship Prod."}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management in the Era of Internet of Things"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-33111-9_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,18]],"date-time":"2022-06-18T05:20:12Z","timestamp":1655529612000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-33111-9_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319331102","9783319331119"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-33111-9_18","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2016]]},"assertion":[{"value":"21 April 2016","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}