{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T03:50:12Z","timestamp":1725853812906},"publisher-location":"Cham","reference-count":9,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319336237"},{"type":"electronic","value":"9783319336251"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-33625-1_45","type":"book-chapter","created":{"date-parts":[[2016,4,20]],"date-time":"2016-04-20T14:42:39Z","timestamp":1461163359000},"page":"501-510","source":"Crossref","is-referenced-by-count":0,"title":["An Alternative Solution to the Software Project Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Broderick","family":"Crawford","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ricardo","family":"Soto","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Gino","family":"Astorga","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Eduardo","family":"Olgu\u00edn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,4,21]]},"reference":[{"issue":"15","key":"45_CR1","doi-asserted-by":"publisher","first-page":"6634","DOI":"10.1016\/j.eswa.2014.05.003","volume":"41","author":"B Crawford","year":"2014","unstructured":"Crawford, B., Soto, R., Johnson, F., Monfroy, E., Paredes, F.: A maxmin ant system algorithm to solve the software project scheduling problem. Expert Syst. Appl. 41(15), 6634\u20136645 (2014)","journal-title":"Expert Syst. Appl."},{"issue":"6","key":"45_CR2","doi-asserted-by":"publisher","first-page":"7102","DOI":"10.1016\/j.eswa.2010.12.059","volume":"38","author":"RM Chen","year":"2011","unstructured":"Chen, R.M.: Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem. Expert Syst. Appl. 38(6), 7102\u20137111 (2011)","journal-title":"Expert Syst. Appl."},{"issue":"1","key":"45_CR3","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/j.cor.2012.05.007","volume":"40","author":"J Xiao","year":"2013","unstructured":"Xiao, J., Ao, X.T., Tang, Y.: Solving software project scheduling problems with ant colony optimization. Comput. Oper. Res. 40(1), 33\u201346 (2013)","journal-title":"Comput. Oper. Res."},{"key":"45_CR4","doi-asserted-by":"crossref","unstructured":"Biju, A.C., Victoire, T.A.A., Mohanasundaram, K.: An improved differential evolution solution for software project scheduling problem. Sci. World J. (2015)","DOI":"10.1155\/2015\/232193"},{"issue":"11","key":"45_CR5","doi-asserted-by":"publisher","first-page":"2380","DOI":"10.1016\/j.ins.2006.12.020","volume":"177","author":"E Alba","year":"2007","unstructured":"Alba, E., Chicano, J.F.: Software project management with GAs. Inf. Sci. 177(11), 2380\u20132401 (2007)","journal-title":"Inf. Sci."},{"issue":"11","key":"45_CR6","doi-asserted-by":"crossref","first-page":"1142","DOI":"10.1016\/j.infsof.2008.03.002","volume":"50","author":"Carl K. Chang","year":"2008","unstructured":"Chang, C.K.,\u00a0Jiang, H., Di, Y., Zhu, D., Ge, Y.: Time-line based model for software project scheduling with genetic algorithms. Inf. Softw. Technol. 50(11), 1142\u20131154 (2008)","journal-title":"Information and Software Technology"},{"key":"45_CR7","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/j.asoc.2013.10.015","volume":"15","author":"Francisco Luna","year":"2014","unstructured":"Luna, F., Gonzlez-lvarez, D.L., Chicano, F., Vega-Rodrguez, M.A.: The software project scheduling problem: a scalability analysis of multi-objective metaheuristics. Appl. Soft Comput. 15, 136\u2013148 (2014)","journal-title":"Applied Soft Computing"},{"issue":"15","key":"45_CR8","doi-asserted-by":"publisher","first-page":"6555","DOI":"10.1016\/j.eswa.2014.05.010","volume":"41","author":"BO Alijla","year":"2014","unstructured":"Alijla, B.O., Wong, L.P., Lim, C.P., Khader, A.T., Al-Betar, M.A.: A modified intelligent water drops algorithm and its application to optimization problems. Expert Syst. Appl. 41(15), 6555\u20136569 (2014)","journal-title":"Expert Syst. Appl."},{"key":"45_CR9","doi-asserted-by":"crossref","unstructured":"Shah-Hosseini, H.: An approach to continuous optimization by the intelligent water drops algorithm. Procedia\u2014Soc. Behav. Sci. 32(0), 224\u2013229 (2012). In: The 4th International Conference of Cognitive Science","DOI":"10.1016\/j.sbspro.2012.01.033"}],"container-title":["Advances in Intelligent Systems and Computing","Artificial Intelligence Perspectives in Intelligent Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-33625-1_45","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T01:19:31Z","timestamp":1559438371000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-33625-1_45"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319336237","9783319336251"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-33625-1_45","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2016]]}}}