{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,6]],"date-time":"2025-10-06T18:55:37Z","timestamp":1759776937809},"publisher-location":"Cham","reference-count":35,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319396385"},{"type":"electronic","value":"9783319396392"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-39639-2_21","type":"book-chapter","created":{"date-parts":[[2016,6,17]],"date-time":"2016-06-17T07:25:00Z","timestamp":1466148300000},"page":"239-256","source":"Crossref","is-referenced-by-count":5,"title":["Influence of Data Uncertainty on the Optimum Inspection Period in a Multi-unit System Maintained According to the Block Inspection Policy"],"prefix":"10.1007","author":[{"given":"Anna","family":"Jodejko-Pietruczuk","sequence":"first","affiliation":[]},{"given":"Sylwia","family":"Werbi\u0144ska-Wojciechowska","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,6,18]]},"reference":[{"issue":"4","key":"21_CR1","doi-asserted-by":"crossref","first-page":"1031","DOI":"10.1080\/00207540600960708","volume":"46","author":"A Akbarov","year":"2008","unstructured":"Akbarov, A., Christer, A.H., Wang, W.: Problem identification in maintenance modeling: a case study. Int. J. Prod. Res. 46(4), 1031\u20131046 (2008)","journal-title":"Int. J. Prod. Res."},{"key":"21_CR2","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1016\/j.engfailanal.2014.12.017","volume":"56","author":"B Babiarz","year":"2015","unstructured":"Babiarz, B., Chudy-Laskowska, K.: Forecasting of failures in district heating systems. Eng. Fail. Anal. 56, 384\u2013395 (2015)","journal-title":"Eng. Fail. Anal."},{"key":"21_CR3","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1057\/jors.1982.161","volume":"33","author":"AH Christer","year":"1982","unstructured":"Christer, A.H.: Modelling inspection policies for building maintenance. J. Opl. Res. Soc. 33, 723\u2013732 (1982)","journal-title":"J. Opl. Res. Soc."},{"key":"21_CR4","doi-asserted-by":"crossref","first-page":"1120","DOI":"10.1057\/palgrave.jors.2600837","volume":"50","author":"AH Christer","year":"1999","unstructured":"Christer, A.H.: Developments in delay time analysis for modelling plant maintenance. J. Opl. Res. Soc. 50, 1120\u20131137 (1999)","journal-title":"J. Opl. Res. Soc."},{"key":"21_CR5","doi-asserted-by":"crossref","unstructured":"Christer, A.H.: A review of delay time analysis for modelling plant maintenance. In: Osaki, S. (ed.) Stochastic Models in Reliability and Maintenance. Springer (2002)","DOI":"10.1007\/978-3-540-24808-8_4"},{"key":"21_CR6","first-page":"97","volume":"2","author":"AH Christer","year":"1990","unstructured":"Christer, A.H., Redmond, D.F.: A recent mathematical development in maintenance theory. IMA J. Math. Appl. Bus. Ind. 2, 97\u2013108 (1990)","journal-title":"IMA J. Math. Appl. Bus. Ind."},{"key":"21_CR7","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/0925-5273(92)90134-S","volume":"24","author":"AH Christer","year":"1992","unstructured":"Christer, A.H., Redmond, D.F.: Revising models of maintenance and inspection. Int. J. Prod. Econ. 24, 227\u2013234 (1992)","journal-title":"Int. J. Prod. Econ."},{"key":"21_CR8","doi-asserted-by":"crossref","unstructured":"Christer, A.H., Waller, W.M.: An operational research approach to planned maintenance: modelling P.M. for a vehicle fleet. J. Opl. Res. Soc. 35(11), 967\u2013984 (1984)","DOI":"10.1057\/jors.1984.193"},{"issue":"6","key":"21_CR9","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1057\/jors.1984.103","volume":"35","author":"AH Christer","year":"1984","unstructured":"Christer, A.H., Waller, W.M.: Reducing production downtime using delay-time analysis. J. Opl. Res. Soc. 35(6), 499\u2013512 (1984)","journal-title":"J. Opl. Res. Soc."},{"issue":"5","key":"21_CR10","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1057\/jors.1984.80","volume":"35","author":"AH Christer","year":"1984","unstructured":"Christer, A.H., Waller, W.M.: Delay time models of industrial inspection maintenance problems. J. Opl. Res. Soc. 35(5), 401\u2013406 (1984)","journal-title":"J. Opl. Res. Soc."},{"issue":"11","key":"21_CR11","doi-asserted-by":"crossref","first-page":"1041","DOI":"10.1057\/jors.1983.235","volume":"34","author":"AH Christer","year":"1983","unstructured":"Christer, A.H., Whitelaw, J.: An operational research approach to breakdown maintenance: problem recognition. J. Opl. Res. Soc. 34(11), 1041\u20131052 (1983)","journal-title":"J. Opl. Res. Soc."},{"key":"21_CR12","doi-asserted-by":"crossref","first-page":"210","DOI":"10.1057\/palgrave.jors.2600518","volume":"49","author":"AH Christer","year":"1998","unstructured":"Christer, A.H., Wang, W., Sharp, J., Baker, R.: A case study of modelling preventive maintenance of production plant using subjective data. J. Opl. Res. Soc. 49, 210\u2013219 (1998)","journal-title":"J. Opl. Res. Soc."},{"key":"21_CR13","unstructured":"Giel, R., M\u0142y\u0144czak, M., Plewa, M.: Logistic support model for the sorting process of selectively collected municipal waste. In: Theory and Engineering of Complex Systems and Dependability: Proceedings of the Tenth International Conference on Dependability and Complex Systems DepCoS-RELCOMEX, June 29\u2013July 3, 2015, Brun\u00f3w, Poland, pp. 369\u2013380. Springer (2015)"},{"key":"21_CR14","unstructured":"Jodejko-Pietruczuk, A., Werbi\u0144ska-Wojciechowska, S.: Expected maintenance costs model for time-delayed technical systems in various reliability structures. In: Proceedings of Probabilistic Safety Assessment and Management, PSAM 12: Honolulu, Hawaii, USA, 22\u201327 June 2014 (IAPSAM), pp. 1\u20138 (2014)"},{"key":"21_CR15","unstructured":"Jodejko-Pietruczuk, A., Werbi\u0144ska-Wojciechowska, S.: Model of expected maintenance costs for multi-unit technical objects with time delay (in Polish). In: Siergiejczyk, M. (ed.) Maintenance Problems of Technical Systems, pp. 79\u201392. Publ. House of Warsaw University of Technology, Warsaw (2014)"},{"key":"21_CR16","unstructured":"Jodejko-Pietruczuk, A., M\u0142y\u0144czak, M., Zaj\u0105c, M.: Assessment of economical lifetime of heavy-duty machines: case study. In: Bri\u0161, R., Guedes Soares, C., Martorell, S. (eds.) Reliability, Risk and Safety: Theory and Applications, vol. 1, pp. 531\u2013534. Taylor & Francis, London (2010)"},{"key":"21_CR17","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.ress.2007.12.005","volume":"94","author":"B Jones","year":"2009","unstructured":"Jones, B., Jenkinson, I., Wang, J.: Methodology of using delay-time analysis for a manufacturing industry. Rel. Eng. & Sys. Safety 94, 111\u2013124 (2009)","journal-title":"Rel. Eng. & Sys. Safety"},{"key":"21_CR18","doi-asserted-by":"publisher","unstructured":"Kierzkowski, A., Kisiel, T.: Functional readiness of the check-in desk system at an airport. Theory and Engineering of Complex Systems and Dependability: Proceedings of the Tenth International Conference on Dependability and Complex Systems DepCoS-RELCOMEX, June 29\u2013July 3, 2015, Brun\u00f3w, Poland, pp. 223\u2013233. Springer (2015). DOI: 10.1007\/978-3-319-19216-1_21","DOI":"10.1007\/978-3-319-19216-1_21"},{"key":"21_CR19","doi-asserted-by":"publisher","unstructured":"Kierzkowski, A., Kisiel, T.: Functional readiness of the security control system at an airport with single-report streams. In: Theory and Engineering of Complex Systems and Dependability: Proceedings of the Tenth International Conference on Dependability and Complex Systems DepCoS-RELCOMEX, June 29\u2013July 3, 2015, Brun\u00f3w, Poland, pp. 211\u2013221. Springer (2015). DOI: 10.1007\/978-3-319-19216-1_20","DOI":"10.1007\/978-3-319-19216-1_20"},{"key":"21_CR20","doi-asserted-by":"crossref","unstructured":"Lubkowski, P., Laskowski, D.: Selected issues of reliable identification of object in transport systems using video monitoring services. In: Mikulski, J. (ed.) Telematics\u2014support for transport. Book Series: Communications in Computer and Information Science, vol. 471, pp. 59\u201368 (2014)","DOI":"10.1007\/978-3-662-45317-9_7"},{"key":"21_CR21","doi-asserted-by":"crossref","unstructured":"Nowakowski, T., Werbi\u0144ska-Wojciechowska, S.: Developments of time dependencies modeling concepts. Advances in safety, reliability and risk management. In: Proceedings of the European Safety and Reliability Conference, ESREL 2011, Troyes, France, 18\u201322 September 2011, pp. 832\u2013838. CRC Press\/Balkema, Leiden (2011)","DOI":"10.1201\/b11433-118"},{"key":"21_CR22","doi-asserted-by":"crossref","first-page":"436","DOI":"10.1016\/j.jlp.2014.09.017","volume":"32","author":"L Pokoradi","year":"2014","unstructured":"Pokoradi, L.: Sensitivity analysis of reliability of systems with complex interconnections. J. Loss Prev. Process Ind. 32, 436\u2013442 (2014)","journal-title":"J. Loss Prev. Process Ind."},{"key":"21_CR23","doi-asserted-by":"crossref","unstructured":"Restel, F.J.: Measures of reliability and safety of rail transportation system. In: Advances in Safety, Reliability and Risk Management\u2014Proceedings of the European Safety and Reliability Conference, ESREL 2011, pp. 2714\u20132719 (2012)","DOI":"10.1201\/b11433-386"},{"key":"21_CR24","first-page":"1","volume":"Article ID 4192","author":"Y Tang","year":"2015","unstructured":"Tang, Y., Jing, J.J., Yang, Y., Xie, C.: Parameter estimation of a delay time model of wearing parts based on objective data. Math. Probl. Eng. Article ID 419280, 1\u20138 (2015)","journal-title":"Math. Probl. Eng."},{"key":"21_CR25","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1109\/24.159813","volume":"41","author":"TM Noortwijk Van","year":"1992","unstructured":"Van Noortwijk, T.M., Dekker, R., Cooke, R.M., Mazzuchi, T.A.: Expert judgement in maintenance optimization. IEEE Trans. Reliab. 41, 427\u2013432 (1992)","journal-title":"IEEE Trans. Reliab."},{"key":"21_CR26","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1016\/S0377-2217(96)00318-9","volume":"99","author":"W Wang","year":"1997","unstructured":"Wang, W.: Subjective estimation of delay-time distribution in maintenance modelling. Eur. J. Oper. Res. 99, 511\u2013529 (1997)","journal-title":"Eur. J. Oper. Res."},{"key":"21_CR27","first-page":"73","volume":"2","author":"W Wang","year":"2010","unstructured":"Wang, W.: Modeling planned maintenance with non-homogeneous defect arrivals and variable probability of defect identification. Ekspl Niez - Maint Reliab 2, 73\u201378 (2010)","journal-title":"Ekspl Niez - Maint Reliab"},{"key":"21_CR28","doi-asserted-by":"crossref","first-page":"838","DOI":"10.1016\/j.ress.2011.03.003","volume":"96","author":"W Wang","year":"2011","unstructured":"Wang, W.: An inspection model based on a three-stage failure process. Reliab. Eng. Syst. Safety 96, 838\u2013848 (2011)","journal-title":"Reliab. Eng. Syst. Safety"},{"key":"21_CR29","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.ress.2012.04.004","volume":"106","author":"W Wang","year":"2012","unstructured":"Wang, W.: An overview of the recent advances in delay-time-based maintenance modelling. Reliab. Eng. Syst. Safety 106, 165\u2013178 (2012)","journal-title":"Reliab. Eng. Syst. Safety"},{"key":"21_CR30","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1002\/qre.815","volume":"23","author":"W Wang","year":"2007","unstructured":"Wang, W., Jia, X.: An empirical Bayesian based approach to delay time inspection model parameters estimation using both subjective and objective data. Qual. Reliab. Eng. Int. 23, 95\u2013105 (2007)","journal-title":"Qual. Reliab. Eng. Int."},{"issue":"3","key":"21_CR31","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1108\/13552510810899445","volume":"14","author":"W Wang","year":"2008","unstructured":"Wang, W., Zhang, W.: Early defect identification: application of statistical process control methods. J. Qual. Mainten. Eng. 14(3), 225\u2013236 (2008)","journal-title":"J. Qual. Mainten. Eng."},{"key":"21_CR32","doi-asserted-by":"crossref","first-page":"2855","DOI":"10.1016\/j.apm.2010.11.070","volume":"35","author":"L Wang","year":"2011","unstructured":"Wang, L., Hu, H., Wang, Y., Wu, W., He, P.: The availability model and parameters estimation method for the delay time model with imperfect maintenance at inspection. Appl. Math. Model. 35, 2855\u20132863 (2011)","journal-title":"Appl. Math. Model."},{"key":"21_CR33","doi-asserted-by":"crossref","unstructured":"Wen-yuan, L.V., Wang, W.: Modelling preventive maintenance of production plant given estimated PM data and actual failure times. In: Proceedings of International Conference on Management Science and Engineering ICMSE\u201906, Lille (2006)","DOI":"10.1109\/ICMSE.2006.313857"},{"key":"21_CR34","first-page":"5","volume":"3","author":"LV Wen-yuan","year":"2011","unstructured":"Wen-yuan, L.V., Wang, W.: Modelling preventive maintenance based on the delay time concept in the context of a case study. Ekspl Niez - Maint Reliab 3, 5\u201311 (2011)","journal-title":"Ekspl Niez - Maint Reliab"},{"key":"21_CR35","doi-asserted-by":"crossref","unstructured":"Zajac, M., Swieboda, J.: Process hazard analysis of the selected process in intermodal transport. In: 2015 International Conference on Military Technologies (ICMT), pp. 1\u20137. IEEE (2015)","DOI":"10.1109\/MILTECHS.2015.7153698"}],"container-title":["Advances in Intelligent Systems and Computing","Dependability Engineering and Complex Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-39639-2_21","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,9]],"date-time":"2019-09-09T21:37:55Z","timestamp":1568065075000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-39639-2_21"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319396385","9783319396392"],"references-count":35,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-39639-2_21","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2016]]}}}