{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T06:50:05Z","timestamp":1725864605008},"publisher-location":"Cham","reference-count":17,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319451169"},{"type":"electronic","value":"9783319451176"}],"license":[{"start":{"date-parts":[[2016,9,15]],"date-time":"2016-09-15T00:00:00Z","timestamp":1473897600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-45117-6_3","type":"book-chapter","created":{"date-parts":[[2016,9,14]],"date-time":"2016-09-14T03:51:25Z","timestamp":1473825085000},"page":"29-40","source":"Crossref","is-referenced-by-count":1,"title":["The Influence of Manufacturing System Characteristics on the Emergence of Logistics Synchronization: A Simulation Study"],"prefix":"10.1007","author":[{"given":"Stanislav M.","family":"Chankov","sequence":"first","affiliation":[]},{"given":"Giovanni","family":"Malloy","sequence":"additional","affiliation":[]},{"given":"Julia","family":"Bendul","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,9,15]]},"reference":[{"issue":"3","key":"3_CR1","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1016\/j.ejor.2004.07.023","volume":"168","author":"C Becker","year":"2006","unstructured":"Becker C, Scholl A (2006) A survey on problems and methods in generalized assembly line balancing. Eur J Oper Res 168(3):694\u2013715","journal-title":"Eur J Oper Res"},{"issue":"4","key":"3_CR2","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/j.cirpj.2012.09.004","volume":"5","author":"T Becker","year":"2012","unstructured":"Becker T et al (2012) The impact of network connectivity on performance in production logistic networks. CIRP J Manuf Sci Technol 5(4):309\u2013318","journal-title":"CIRP J Manuf Sci Technol"},{"key":"3_CR3","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/j.procir.2013.05.027","volume":"7","author":"T Becker","year":"2013","unstructured":"Becker T, Chankov SM, Windt K (2013) Synchronization measures in job shop manufacturing environments. Procedia CIRP 7:157\u2013162","journal-title":"Procedia CIRP"},{"issue":"3","key":"3_CR4","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/0166-5316(86)90019-2","volume":"6","author":"A Bondi","year":"1986","unstructured":"Bondi A, Whitt W (1986) The influence of service-time variability in a closed network of queues. Perform Eval 6(3):219\u2013234","journal-title":"Perform Eval"},{"key":"3_CR5","doi-asserted-by":"crossref","first-page":"594","DOI":"10.1016\/j.procir.2014.02.034","volume":"17","author":"SM Chankov","year":"2014","unstructured":"Chankov SM, Becker T, Windt K (2014) Towards definition of synchronization in logistics systems. Procedia CIRP 17:594\u2013599","journal-title":"Procedia CIRP"},{"key":"3_CR6","doi-asserted-by":"crossref","unstructured":"Chankov SM, Huett M-T, Bendul J (2015) Synchronization in manufacturing systems: quantification and relation to logistics performance. Submitted to International Journal of Production Research","DOI":"10.1080\/00207543.2016.1165876"},{"key":"3_CR7","unstructured":"Chryssolouris G (2006) Manufacturing systems: theory and practice, 2nd ed. Springer, New York"},{"key":"3_CR8","doi-asserted-by":"crossref","first-page":"290","DOI":"10.5486\/PMD.1959.6.3-4.12","volume":"6","author":"P Erd\u0151s","year":"1959","unstructured":"Erd\u0151s P, R\u00e9nyi A (1959) On random graphs I. Publ. Math. Debrecen 6:290\u2013297","journal-title":"Publ. Math. Debrecen"},{"key":"3_CR9","volume-title":"Discovering statistics using ibm spss statistics","author":"A Field","year":"2013","unstructured":"Field A (2013) Discovering statistics using ibm spss statistics, 4th edn. SAGE Publications, London","edition":"4"},{"issue":"2","key":"3_CR10","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1115\/1.1688372","volume":"126","author":"T Freiheit","year":"2004","unstructured":"Freiheit T, Shpitalni M, Hu SJ (2004) Productivity of paced parallel-serial manufacturing lines with and without crossover. J Manuf Sci Eng 126(2):361","journal-title":"J Manuf Sci Eng"},{"issue":"2","key":"3_CR11","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1140\/epjb\/e2010-00234-y","volume":"77","author":"C Fretter","year":"2010","unstructured":"Fretter C et al (2010) Phase synchronization in railway timetables. Eur Phys J B 77(2):281\u2013289","journal-title":"Eur Phys J B"},{"key":"3_CR12","volume-title":"Simulation modeling and analysis","author":"WD Kelton","year":"2000","unstructured":"Kelton WD, Law AM (2000) Simulation modeling and analysis. McGraw Hill, Boston"},{"issue":"3","key":"3_CR13","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/S0167-5419(89)80015-8","volume":"5","author":"WA Miller","year":"1989","unstructured":"Miller WA, Davis RP (1989) Synchronization of material flow to aid production planning in a job shop. Eng Manage Int 5(3):179\u2013184","journal-title":"Eng Manage Int"},{"key":"3_CR14","volume-title":"Introduction to the theory of statistics","author":"AMF Mood","year":"1974","unstructured":"Mood AMF, Graybill FA, Boes DC (1974) Introduction to the theory of statistics, 3rd edn. McGraw-Hill, New York","edition":"3"},{"key":"3_CR15","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-010-0217-2","volume-title":"Synchronization: a universal concept in nonlinear sciences","author":"A Pikovsky","year":"2003","unstructured":"Pikovsky A, Rosenblum M, Kurths J (2003) Synchronization: a universal concept in nonlinear sciences. Cambridge University Press, Cambridge"},{"key":"3_CR16","first-page":"79","volume-title":"Auftrags- und Informationsmanagement in Produktionsnetzwerken\u2014Konzepte und Erfahrungsberichte","author":"H-H Wiendahl","year":"1998","unstructured":"Wiendahl H-H (1998) Zentralistische Planung in dezentralen Strukturen?\u2014Orientierungshilfen f\u00fcr die Praxis. In: Westk\u00e4mper E, Schraft RD (eds) Auftrags- und Informationsmanagement in Produktionsnetzwerken\u2014Konzepte und Erfahrungsberichte. Fraunhofer IPA, Stuttgart, pp 79\u2013107"},{"issue":"4","key":"3_CR17","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/00207548008919686","volume":"18","author":"J De Witte","year":"1980","unstructured":"Witte J De (1980) The use of similarity coefficients in production flow analysis. Int J Prod Res 18(4):503\u2013514","journal-title":"Int J Prod Res"}],"container-title":["Lecture Notes in Logistics","Dynamics in Logistics"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-45117-6_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,20]],"date-time":"2023-08-20T02:59:37Z","timestamp":1692500377000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-45117-6_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,15]]},"ISBN":["9783319451169","9783319451176"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-45117-6_3","relation":{},"ISSN":["2194-8917","2194-8925"],"issn-type":[{"type":"print","value":"2194-8917"},{"type":"electronic","value":"2194-8925"}],"subject":[],"published":{"date-parts":[[2016,9,15]]}}}