{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,23]],"date-time":"2025-11-23T13:31:11Z","timestamp":1763904671872,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319452425"},{"type":"electronic","value":"9783319452432"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-45243-2_37","type":"book-chapter","created":{"date-parts":[[2016,9,19]],"date-time":"2016-09-19T09:41:42Z","timestamp":1474278102000},"page":"402-411","source":"Crossref","is-referenced-by-count":9,"title":["GRASP Applied to Multi\u2013Skill Resource\u2013Constrained Project Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Pawe\u0142 B.","family":"Myszkowski","sequence":"first","affiliation":[]},{"given":"J\u0229drzej J.","family":"Siemie\u0144ski","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,9,20]]},"reference":[{"key":"37_CR1","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.4236\/jsea.2010.312131","volume":"3","author":"F Al-Anzi","year":"2010","unstructured":"Al-Anzi, F., Al-Zamel, K., Allahverdi, A.: Weighted multi-skill resources project scheduling. J. Sof. Eng. App. 3, 1125\u20131130 (2010)","journal-title":"J. Sof. Eng. App."},{"issue":"4","key":"37_CR2","doi-asserted-by":"crossref","first-page":"459","DOI":"10.1111\/j.1937-5956.2009.01023.x","volume":"18","author":"F Ballestin","year":"2009","unstructured":"Ballestin, F., Leus, R.: Resource-constrained project scheduling for timely project completion with stochastic activity durations. Prod. Oper. Manage. 18(4), 459\u2013474 (2009)","journal-title":"Prod. Oper. Manage."},{"issue":"1","key":"37_CR3","doi-asserted-by":"crossref","first-page":"2547","DOI":"10.1080\/00207549308956882","volume":"31","author":"F Boctor","year":"1993","unstructured":"Boctor, F.: Heuristics for scheduling projects with resource restrictions and several resource-duration modes. Inter. J. Prod. Res. 31(1), 2547\u20132558 (1993)","journal-title":"Inter. J. Prod. Res."},{"key":"37_CR4","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K Bouleimen","year":"2003","unstructured":"Bouleimen, K., Lecoc, H.: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. Eur. J. Oper. Res. 149, 268\u2013281 (2003)","journal-title":"Eur. J. Oper. Res."},{"key":"37_CR5","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants, extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1\u201314 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"37_CR6","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1007\/s10951-008-0079-3","volume":"12","author":"H Li","year":"2009","unstructured":"Li, H., Womer, K.: Scheduling projects with multi-skilled personnel by a hybrid milp\/cp benders decomposition algorithm. J. Sched. 12, 281\u2013298 (2009)","journal-title":"J. Sched."},{"key":"37_CR7","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/j.asoc.2013.10.015","volume":"15","author":"F Luna","year":"2014","unstructured":"Luna, F., Gonzalez-Alvarez, D., Chicano, F., Vega-Rodriguez, M.: A scalability analysis of multi-objective metaheuristics. Appl. Soft Comput. 15, 136\u2013148 (2014)","journal-title":"Appl. Soft Comput."},{"key":"37_CR8","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/j.cor.2007.07.001","volume":"36","author":"J Mendes","year":"2009","unstructured":"Mendes, J., Goncalves, J., Resende, M.: A radom key based genetic algorithm for the resource constrained project scheduling problem. Comp. Oper. Res. 36, 92\u2013109 (2009)","journal-title":"Comp. Oper. Res."},{"issue":"12","key":"37_CR9","doi-asserted-by":"publisher","first-page":"3599","DOI":"10.1007\/s00500-014-1455-x","volume":"19","author":"P Myszkowski","year":"2015","unstructured":"Myszkowski, P., Skowro\u0144ski, M., Olech, \u0141., O\u015bliz\u0142o, K.: Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem. Soft Comput. 19(12), 3599\u20133619 (2015). doi: 10.1007\/s00500-014-1455-x","journal-title":"Soft Comput."},{"key":"37_CR10","unstructured":"Myszkowski, P., Skowro\u0144ski, M., and Podlodowski, \u0141.: Novel heuristic solutions for multi-skill resource-constrained project scheduling problem. In: Federated Conference on Computer Science and Information Systems, pp. 159\u2013166 (2013)"},{"key":"37_CR11","doi-asserted-by":"crossref","unstructured":"Myszkowski, P., Skowro\u0144ski, M., Sikora, M.: A new benchmark dataset for multi-skill resource-constrained project scheduling problem. In: Federated Conference on Computer Science and Information Systems, ACSIS, vol. 5, pp. 129\u2013138 (2015)","DOI":"10.15439\/2015F273"},{"key":"37_CR12","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-015-0402-2","author":"J Poppenborg","year":"2015","unstructured":"Poppenborg, J., Knust, S.: A flow-based tabu search algorithm for the rcpsp with transfer times. OR Spectrum (2015). doi: 10.1007\/s00291-015-0402-2","journal-title":"OR Spectrum"},{"issue":"3","key":"37_CR13","first-page":"231","volume":"23","author":"M Ranjbar","year":"2012","unstructured":"Ranjbar, M.: A hybrid grasp algorithm for minimizing total weighted resource tardiness penalty costs in scheduling of project networks. Inter. J. Indust. Eng. Prod. Res. 23(3), 231\u2013234 (2012)","journal-title":"Inter. J. Indust. Eng. Prod. Res."},{"issue":"20","key":"37_CR14","first-page":"87","volume":"10","author":"J Rivera","year":"2013","unstructured":"Rivera, J., Moreno, L., Diaz, F., Pena, G.: A hybrid heuristic algorithm for solving the resource constrained project scheduling problem (rcpsp). Revista EIA 10(20), 87\u2013100 (2013)","journal-title":"Revista EIA"},{"key":"37_CR15","doi-asserted-by":"crossref","unstructured":"Santos, M., Tereso, A.: On the multi-mode, multi-skill resource constrained project scheduling problem-computational results. In: ICOPEV 2011, pp. 93\u201399 (2011)","DOI":"10.1007\/978-3-642-20505-7_21"},{"key":"37_CR16","unstructured":"Skowro\u0144ski, M., Myszkowski, P., Adamski, M., Kwiatek, P.: Tabu search approach for multi-skill resource-constrained project scheduling problem. In: Federated Conference on Computer Science and Information Systems, pp. 153\u2013158 (2013)"},{"key":"37_CR17","doi-asserted-by":"crossref","first-page":"2421","DOI":"10.1016\/j.eswa.2012.10.058","volume":"40","author":"V Yannibelli","year":"2013","unstructured":"Yannibelli, V., Amandi, A.: Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem. Expert Syst. App. 40, 2421\u20132434 (2013)","journal-title":"Expert Syst. App."},{"key":"37_CR18","doi-asserted-by":"crossref","unstructured":"Zhang, K., Zhao, G., Jiang, J.: Particle swarm optimization method for resource-constrained project scheduling problem. In: Conference on ICEMI 2009, pp. 792\u2013796 (2009)","DOI":"10.1109\/ICEMI.2009.5274706"}],"container-title":["Lecture Notes in Computer Science","Computational Collective Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-45243-2_37","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,13]],"date-time":"2019-09-13T15:00:50Z","timestamp":1568386850000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-45243-2_37"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319452425","9783319452432"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-45243-2_37","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2016]]}}}