{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T06:54:43Z","timestamp":1725864883870},"publisher-location":"Cham","reference-count":21,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319465913"},{"type":"electronic","value":"9783319465920"}],"license":[{"start":{"date-parts":[[2016,9,16]],"date-time":"2016-09-16T00:00:00Z","timestamp":1473984000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-46592-0_2","type":"book-chapter","created":{"date-parts":[[2016,9,15]],"date-time":"2016-09-15T08:02:44Z","timestamp":1473926564000},"page":"21-31","source":"Crossref","is-referenced-by-count":3,"title":["Joint Treatment of Imprecision and Randomness in the Appraisal of the Effectiveness and Risk of Investment Projects"],"prefix":"10.1007","author":[{"given":"Bogdan","family":"R\u0119biasz","sequence":"first","affiliation":[]},{"given":"Bart\u0142omiej","family":"Gawe\u0142","sequence":"additional","affiliation":[]},{"given":"Iwona","family":"Skalna","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,9,16]]},"reference":[{"key":"2_CR1","doi-asserted-by":"crossref","unstructured":"Baraldi, P., et al.: Monte Carlo and fuzzy interval propagation of hybrid uncertainties on a risk model for the design of a flood protection dike. Advances in Safety, Reliability and Risk Management: ESREL (2011)","DOI":"10.1201\/b11433-305"},{"key":"2_CR2","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1109\/TFUZZ.2006.876720","volume":"14","author":"C Baudrit","year":"2006","unstructured":"Baudrit, C., Dubois, D., Guyonet, D.: Joint propagation and exploitation of probabilistic and possibilistic information in risk assessment. IEEE Trans. Fuzzy Syst. 14, 593\u2013607 (2006)","journal-title":"IEEE Trans. Fuzzy Syst."},{"key":"2_CR3","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/0165-0114(87)90128-X","volume":"21","author":"J Buckley","year":"1987","unstructured":"Buckley, J.: The fuzzy mathematics of finance. Fuzzy Sets Syst. 21, 257\u2013273 (1987)","journal-title":"Fuzzy Sets Syst."},{"issue":"2","key":"2_CR4","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1080\/0013791X.2011.573616","volume":"56","author":"D Carmichael","year":"2011","unstructured":"Carmichael, D.: An alternative approach to capital investment appraisal. Eng. Econ. 56(2), 123\u2013139 (2011)","journal-title":"Eng. Econ."},{"issue":"1","key":"2_CR5","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1080\/00137910701864809","volume":"53","author":"D Carmichael","year":"2008","unstructured":"Carmichael, D., Balatbat, M.: Probabilistic DCF analysis and capital budgeting and investment\u2014a survey. Eng. Econ. 53(1), 84\u2013102 (2008)","journal-title":"Eng. Econ."},{"key":"2_CR6","doi-asserted-by":"crossref","first-page":"907","DOI":"10.1057\/jors.1992.129","volume":"43","author":"F Choobineh","year":"1992","unstructured":"Choobineh, F., Behrens, A.: Use of intervals and possibility distribution in economic analysis. J. Oper. Res. Soc. 43, 907\u2013918 (1992)","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"2_CR7","doi-asserted-by":"crossref","first-page":"34","DOI":"10.25102\/fer.2000.01.05","volume":"5","author":"L Dimova","year":"2000","unstructured":"Dimova, L., Sevastiyanov, D., Sevastiyanov, P.: Application of fuzzy sets theory, methods for the evaluation of investment efficiency parameters. Fuzzy Econ. Rev. 5(1), 34\u201348 (2000)","journal-title":"Fuzzy Econ. Rev."},{"issue":"02","key":"2_CR8","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1080\/03081079.2010.506179","volume":"40","author":"D Dubois","year":"2011","unstructured":"Dubois, D., Guyonnet, D.: Risk-informed decision-making in the presence of epistemic uncertainty. Int. J. Gen Syst 40(02), 145\u2013167 (2011)","journal-title":"Int. J. Gen Syst"},{"key":"2_CR9","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/S0951-8320(96)00071-3","volume":"54","author":"S Ferson","year":"1996","unstructured":"Ferson, S., Ginzburg, L.: Difference method are needed to propagate ignorance and variability. Reliab. Eng. Syst. Saf. 54, 133\u2013144 (1996)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"2_CR10","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1061\/(ASCE)0733-9372(2003)129:1(68)","volume":"126","author":"D Guyonnet","year":"2003","unstructured":"Guyonnet, D., et al.: Hybrid approach for addressing uncertainty in risk assessment. J. Environ. Eng. 126, 68\u201376 (2003)","journal-title":"J. Environ. Eng."},{"issue":"2","key":"2_CR11","doi-asserted-by":"crossref","first-page":"725","DOI":"10.3233\/IFS-141462","volume":"28","author":"L Hiu","year":"2015","unstructured":"Hiu, L., Peng, J., Shengguo, L.: Uncertain programming models for capital budgeting subject to experts\u2019 estimations. J. Intell. & Fuzzy Syst. 28(2), 725\u2013736 (2015)","journal-title":"J. Intell. & Fuzzy Syst."},{"key":"2_CR12","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.fss.2011.07.009","volume":"193","author":"M Hlad\u00edk","year":"2012","unstructured":"Hlad\u00edk, M., \u010cern\u00fd, M.: Interval regression by tolerance analysis approach. Fuzzy Sets Syst. 193, 85\u2013107 (2012)","journal-title":"Fuzzy Sets Syst."},{"key":"2_CR13","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/S0020-0255(02)00157-3","volume":"142","author":"C Kahraman","year":"2002","unstructured":"Kahraman, C., Ruan, D., Tolga, E.: Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows. Inf. Sci. 142, 57\u201376 (2002)","journal-title":"Inf. Sci."},{"issue":"1","key":"2_CR14","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/S0925-5273(99)00103-6","volume":"66","author":"C Kahraman","year":"2000","unstructured":"Kahraman, C., Tolga, E., Ulukan, Z.: Justification of manufacturing technologies using fuzzy benefit\/cost ratio analysis. Int. J. Prod. Econ. 66(1), 45\u201352 (2000)","journal-title":"Int. J. Prod. Econ."},{"key":"2_CR15","volume-title":"Introduction to Fuzzy Arithmetic: Theory and application","author":"C Kaufmann","year":"1985","unstructured":"Kaufmann, C., Gupta, M.: Introduction to Fuzzy Arithmetic: Theory and application. Van Nostrand Reinhold, New York (1985)"},{"key":"2_CR16","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1016\/S0165-0114(98)00088-8","volume":"111","author":"D Kuchta","year":"2000","unstructured":"Kuchta, D.: Fuzzy capital budgeting. Fuzzy Sets Syst. 111, 367\u2013385 (2000)","journal-title":"Fuzzy Sets Syst."},{"key":"2_CR17","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s10700-006-0016-x","volume":"5","author":"B Liu","year":"2006","unstructured":"Liu, B.: A survey of credibility theory. Fuzzy Optim. Decis. Mak. 5, 387\u2013408 (2006)","journal-title":"Fuzzy Optim. Decis. Mak."},{"key":"2_CR18","doi-asserted-by":"crossref","unstructured":"R\u0119biasz, B., Gawe\u0142, B., Skalna, I.: Hybrid framework for investment project portfolio selection, In: 2014 Federated Conference on Computer Science and Information Systems (FedCSIS), pp. 1117\u20131122. IEEE (2014)","DOI":"10.15439\/2014F347"},{"key":"2_CR19","doi-asserted-by":"crossref","unstructured":"Skalna, I. et al.: Advances in Fuzzy Decision Making, pp. 75\u201377. Springer (2015)","DOI":"10.1007\/978-3-319-26494-3"},{"key":"2_CR20","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/j.fss.2013.06.002","volume":"243","author":"S Song","year":"2014","unstructured":"Song, S., et al.: The uncertainty importance measures of the structural system in view of mixed uncertain variables. Fuzzy Sets Syst. 243, 25\u201335 (2014)","journal-title":"Fuzzy Sets Syst."},{"key":"2_CR21","unstructured":"Ward, T:, Discounted fuzzy cash flows analysis, In: Proceedings of the 1985 Fall Industrial Engineering Conference, pp. 476\u2013481 (1985)"}],"container-title":["Advances in Intelligent Systems and Computing","Information Systems Architecture and Technology: Proceedings of 37th International Conference on Information Systems Architecture and Technology \u2013 ISAT 2016 \u2013 Part IV"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-46592-0_2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,13]],"date-time":"2019-09-13T14:25:48Z","timestamp":1568384748000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-46592-0_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,16]]},"ISBN":["9783319465913","9783319465920"],"references-count":21,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-46592-0_2","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2016,9,16]]}}}