{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,10]],"date-time":"2025-06-10T22:40:01Z","timestamp":1749595201893,"version":"3.41.0"},"publisher-location":"Cham","reference-count":28,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319473635"},{"type":"electronic","value":"9783319473642"}],"license":[{"start":{"date-parts":[[2016,10,1]],"date-time":"2016-10-01T00:00:00Z","timestamp":1475280000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-47364-2_41","type":"book-chapter","created":{"date-parts":[[2016,9,30]],"date-time":"2016-09-30T12:41:56Z","timestamp":1475239316000},"page":"426-434","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Robustness of Schedules Obtained Using the Tabu Search Algorithm Based on the Average Slack Method"],"prefix":"10.1007","author":[{"given":"Iwona","family":"Paprocka","sequence":"first","affiliation":[]},{"given":"Aleksander","family":"Gwiazda","sequence":"additional","affiliation":[]},{"given":"Magdalena","family":"B\u0105czkowicz","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,10,1]]},"reference":[{"key":"41_CR1","doi-asserted-by":"publisher","first-page":"2065","DOI":"10.1080\/002075497195074","volume":"35","author":"RJ Abumaizar","year":"1997","unstructured":"Abumaizar, R.J., Svestka, J.A.: Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35, 2065\u20132082 (1997)","journal-title":"Int. J. Prod. Res."},{"key":"41_CR2","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/j.ijpe.2011.04.020","volume":"132","author":"N Al-Hinai","year":"2011","unstructured":"Al-Hinai, N., ElMekkawy, T.Y.: Robust and flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm. Int. J. Prod. Econ. 132, 279\u2013291 (2011)","journal-title":"Int. J. Prod. Econ."},{"key":"41_CR3","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1016\/j.cie.2015.11.005","volume":"91","author":"A Hamzadayi","year":"2016","unstructured":"Hamzadayi, A., Yildiz, G.: Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server. Comput. Ind. Eng. 91, 66\u201384 (2016)","journal-title":"Comput. Ind. Eng."},{"key":"41_CR4","doi-asserted-by":"crossref","unstructured":"Bana\u015b, W., S\u0119kala, A., Foit, K., Gwiazda, A., Hryniewicz, P., Kost, G.: The modular design of robotic workcells in a flexible production line. In: IOP Conference Series: Materials Science and Engineering, vol. 95, p. 012099 (2015)","DOI":"10.1088\/1757-899X\/95\/1\/012099"},{"key":"41_CR5","doi-asserted-by":"crossref","unstructured":"Bana\u015b, W., S\u0119kala, A., Gwiazda, A., Foit, K., Hryniewicz, P., Kost, G.: Determination of the robot location in a workcell of a flexible production line. In: IOP Conference Series: Materials Science and Engineering, vol. 95, p. 012105 (2015)","DOI":"10.1088\/1757-899X\/95\/1\/012105"},{"key":"41_CR6","doi-asserted-by":"publisher","first-page":"379","DOI":"10.1080\/00207549608904909","volume":"34","author":"J Chen","year":"1996","unstructured":"Chen, J., Chung, C.-H.: An examination of flexibility measurements and performance of flexible manufacturing systems. Int. J. Prod. Res. 34, 379\u2013394 (1996)","journal-title":"Int. J. Prod. Res."},{"key":"41_CR7","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1016\/S0360-8352(99)00136-9","volume":"36","author":"R Cheng","year":"1999","unstructured":"Cheng, R., Gen, M., Tsujimura, Y.: A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies. Comput. Ind. Eng. 36, 343\u2013346 (1999)","journal-title":"Comput. Ind. Eng."},{"key":"41_CR8","doi-asserted-by":"crossref","unstructured":"Chong, C.S., Sivakumar, A.I., Gay, R.: Simulation-based scheduling for dynamic discrete manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1465\u20131473 (2003)","DOI":"10.1109\/WSC.2003.1261590"},{"key":"41_CR9","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1080\/09511929208944524","volume":"5","author":"LK Church","year":"1992","unstructured":"Church, L.K., Uzsoy, R.: Analysis of periodic and event-driven rescheduling policies in dynamic shops. Int. J. Comput. Integr. Manuf. 5, 153\u2013163 (1992)","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"41_CR10","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1007\/s10479-007-0280-3","volume":"159","author":"A Duenas","year":"2008","unstructured":"Duenas, A., Petrovic, D.: An approach to predictive-reactive scheduling of parallel machines subject to disruptions. Ann. Oper. Res. 159, 65\u201382 (2008)","journal-title":"Ann. Oper. Res."},{"key":"41_CR11","doi-asserted-by":"publisher","first-page":"1049","DOI":"10.1007\/s00170-011-3652-4","volume":"60","author":"E Pan","year":"2012","unstructured":"Pan, E., Liao, W., Xi, L.: A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int. J. Adv. Manuf. Technol. 60, 1049\u20131061 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"41_CR12","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1080\/07408170701283198","volume":"40","author":"S Goren","year":"2008","unstructured":"Goren, S., Sabuncuoglu, I.: Robustness and stability measures for scheduling: single-machine environment. IIE Trans. 40, 66\u201383 (2008)","journal-title":"IIE Trans."},{"issue":"1","key":"41_CR13","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1023\/A:1022235519958","volume":"6","author":"GV Vieira","year":"2003","unstructured":"Vieira, G.V., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6(1), 35\u201358 (2003)","journal-title":"J. Sched."},{"key":"41_CR14","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1016\/S0377-2217(99)00381-1","volume":"124","author":"L Heng","year":"2000","unstructured":"Heng, L., Zhicheng, L., Ling, X.L., Bin, H.: A production rescheduling expert simulation system. Eur. J. Oper. Res. 124, 283\u2013293 (2000)","journal-title":"Eur. J. Oper. Res."},{"key":"41_CR15","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1080\/002075497196082","volume":"35","author":"AK Jain","year":"1997","unstructured":"Jain, A.K., Elmaraghy, H.A.: Production scheduling\/rescheduling in flexible manufacturing. Int. J. Prod. Res. 35, 28\u2013309 (1997)","journal-title":"Int. J. Prod. Res."},{"issue":"16","key":"41_CR16","doi-asserted-by":"publisher","first-page":"4999","DOI":"10.1080\/00207543.2010.495088","volume":"49","author":"SMK Hasan","year":"2011","unstructured":"Hasan, S.M.K., Sarker, R., Essam, D.: Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns. Int. J. Prod. Res. 49(16), 4999\u20135015 (2011)","journal-title":"Int. J. Prod. Res."},{"issue":"12","key":"41_CR17","doi-asserted-by":"publisher","first-page":"3516","DOI":"10.1080\/00207543.2012.751509","volume":"51","author":"L Zhang","year":"2013","unstructured":"Zhang, L., Gao, L., Li, X.: A hybrid genetic algorithm and tabu search for multi-objective dynamic job shop scheduling problem. Int. J. Prod. Res. 51(12), 3516\u20133531 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"41_CR18","doi-asserted-by":"publisher","first-page":"645","DOI":"10.1007\/s00170-005-0237-0","volume":"31","author":"L Liu","year":"2007","unstructured":"Liu, L., Han-yu, G., Yu-geng, X.: Robust and stable scheduling of a single machine with random machine breakdowns. Int. J. Adv. Manuf. Technol. 31, 645\u2013656 (2007)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"41_CR19","doi-asserted-by":"publisher","first-page":"616","DOI":"10.1016\/S0377-2217(03)00016-X","volume":"155","author":"DC Mattfeld","year":"2004","unstructured":"Mattfeld, D.C., Bierwirth, C.: An efficient genetic algorithm for job shop scheduling with tardiness objectives. Eur. J. Oper. Res. 155, 616\u2013630 (2004)","journal-title":"Eur. J. Oper. Res."},{"issue":"7","key":"41_CR20","doi-asserted-by":"publisher","first-page":"1671","DOI":"10.1080\/00207549308956816","volume":"37","author":"H Matsuura","year":"1993","unstructured":"Matsuura, H., Tsubone, H., Kanezashi, M.: Sequencing, dispatching and switching in a dynamic manufacturing environment. Int. J. Prod. Res. 37(7), 1671\u20131688 (1993)","journal-title":"Int. J. Prod. Res."},{"key":"41_CR21","doi-asserted-by":"crossref","unstructured":"Monica, Z.: Optimization of the production process using virtual model of a workspace. In: IOP Conference Series: Materials Science and Engineering, vol. 95, p. 012102 (2015)","DOI":"10.1088\/1757-899X\/95\/1\/012102"},{"key":"41_CR22","doi-asserted-by":"publisher","first-page":"885","DOI":"10.4028\/www.scientific.net\/AMR.1036.885","volume":"1036","author":"I Paprocka","year":"2014","unstructured":"Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: A production scheduling model with maintenance. Adv. Mater. Res. 1036, 885\u2013890 (2014)","journal-title":"Adv. Mater. Res."},{"key":"41_CR23","doi-asserted-by":"crossref","unstructured":"Paprocka, I., Kempa, W., Kalinowski, K., et al.: Estimation of overall equipment effectiveness using simulation programme. Mater. Sci. Eng. 95 (2015). Article Number: 012155","DOI":"10.1088\/1757-899X\/95\/1\/012155"},{"key":"41_CR24","first-page":"921","volume":"2014","author":"I Paprocka","year":"1036","unstructured":"Paprocka, I., Kempa, W.M., Grabowik, C., Kalinowski, K.: Sensitivity analysis of predictive scheduling algorithms. Adv. Mater. Res. 2014, 921\u2013926 (1036)","journal-title":"Adv. Mater. Res."},{"issue":"20","key":"41_CR25","doi-asserted-by":"publisher","first-page":"5657","DOI":"10.1080\/00207540802112652","volume":"47","author":"SA Fahmy","year":"2009","unstructured":"Fahmy, S.A., Balakrishnan, S., ElMekkawy, T.Y.: A generic deadlock-free reactive scheduling approach. Int. J. Prod. Res. 47(20), 5657\u20135676 (2009)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"41_CR26","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/0925-5273(93)90007-8","volume":"32","author":"V Suresh","year":"1993","unstructured":"Suresh, V., Chudhari, D.: Dynamic scheduling - a survey of research. Int. J. Prod. Econ. 32(1), 53\u201363 (1993)","journal-title":"Int. J. Prod. Econ."},{"key":"41_CR27","doi-asserted-by":"publisher","first-page":"1080","DOI":"10.1080\/07408170902905995","volume":"41","author":"A Turkcan","year":"2009","unstructured":"Turkcan, A., Akturk, M.S., Storer, R.H.: Predictive\/reactive scheduling with controllable processing times and earliness-tardiness penalties. IIE Trans. 41, 1080\u20131095 (2009)","journal-title":"IIE Trans."},{"issue":"4","key":"41_CR28","doi-asserted-by":"publisher","first-page":"256","DOI":"10.1016\/S0278-6125(01)80005-4","volume":"19","author":"GE Vieira","year":"2000","unstructured":"Vieira, G.E., Herrmann, J.W., Lin, E.: Predicting the performance of rescheduling strategies for parallel machine systems. J. Manuf. Syst. 19(4), 256\u2013266 (2000)","journal-title":"J. Manuf. Syst."}],"container-title":["Advances in Intelligent Systems and Computing","International Joint Conference SOCO\u201916-CISIS\u201916-ICEUTE\u201916"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-47364-2_41","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,10]],"date-time":"2025-06-10T22:08:46Z","timestamp":1749593326000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-47364-2_41"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,10,1]]},"ISBN":["9783319473635","9783319473642"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-47364-2_41","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2016,10,1]]},"assertion":[{"value":"1 October 2016","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICEUTE","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on EUropean Transnational Education","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"San Sebasti\u00e1n","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Spain","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2016","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"19 October 2016","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"21 October 2016","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"iceute2016","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}