{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T07:47:44Z","timestamp":1725868064415},"publisher-location":"Cham","reference-count":25,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319480237"},{"type":"electronic","value":"9783319480244"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-48024-4_11","type":"book-chapter","created":{"date-parts":[[2016,10,19]],"date-time":"2016-10-19T13:26:11Z","timestamp":1476883571000},"page":"131-142","source":"Crossref","is-referenced-by-count":0,"title":["Analysis of Risk Factors of ERP (Enterprise Resource Planning) Systems Information Technologies"],"prefix":"10.1007","author":[{"given":"William","family":"Baz\u00e1n","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Teresa","family":"Samaniego","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abel","family":"Alarc\u00f3n","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ana","family":"Rodr\u00edguez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,10,20]]},"reference":[{"issue":"2","key":"11_CR1","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1108\/14637150310468416","volume":"9","author":"KS Metaxiotis","year":"2003","unstructured":"Metaxiotis, K.S., Psarras, J.E., Ergazakis, K.A.: Production scheduling in ERP systems: an AI based approach to face the gap. Bus. Process Manag. J. 9(2), 221\u2013247 (2003)","journal-title":"Bus. Process Manag. J."},{"key":"11_CR2","volume-title":"Material Requirements Planning\u2014The New Way of Life in Production and Inventory Management","author":"JA Orlicky","year":"1975","unstructured":"Orlicky, J.A.: Material Requirements Planning\u2014The New Way of Life in Production and Inventory Management. McGraw-Hill, New York (1975)"},{"unstructured":"Tejerina, W.C.: Product dimensions for the software. Jujuy National University of Jujuy (2014)","key":"11_CR3"},{"key":"11_CR4","volume-title":"Software Engineering","author":"R Pressman","year":"2010","unstructured":"Pressman, R.: Software Engineering, 5th edn. McGraw Hill, New York (2010)","edition":"5"},{"key":"11_CR5","volume-title":"Good Practices","author":"R Pressman","year":"1998","unstructured":"Pressman, R.: Good Practices. McGraw Hill, New York (1998)"},{"unstructured":"Scalone, F.: Estudio Comparativo de los Modelos y Est\u00e1ndares de Calidad de Software. Buenos Aires, pp. 22\u201323 (2006)","key":"11_CR6"},{"key":"11_CR7","doi-asserted-by":"crossref","first-page":"2118","DOI":"10.1016\/j.jss.2008.03.059","volume":"81","author":"P Bannerman","year":"2008","unstructured":"Bannerman, P.: Risk and risk management in software projects: a reassessment. J. Syst. Softw. 81, 2118\u20132133 (2008)","journal-title":"J. Syst. Softw."},{"unstructured":"Dolado, J.J., Aguirregoitta, A., Presedo, C.: Study metrics for project control software. In: Proceedings of the Conference on Software Engineering and Database, SISTEDES, Barcelona pp. 65\u201372 (2010)","key":"11_CR8"},{"unstructured":"IEEE: Standard Dictionary of Measures to produce reliable software. IEEE (1998)","key":"11_CR9"},{"key":"11_CR10","volume-title":"Software engineering project management","author":"RH Thayer","year":"2001","unstructured":"Thayer, R.H.: Software engineering project management, 2nd edn. Wiley - IEEE Computer Society Press, New York (2001)","edition":"2"},{"key":"11_CR11","first-page":"198","volume":"8","author":"L Mendoza","year":"2005","unstructured":"Mendoza, L., Perez, M., Griman, A.: Prototype systemic quality model (MOSCA) software. Comput. Syst. 8, 198\u2013199 (2005)","journal-title":"Comput. Syst."},{"unstructured":"Serrano, M., Piattini, M., Calero, C., Genero, M., Miranda, D.: A method for defining software metrics. ALARCOS Group, University of Castilla (2010)","key":"11_CR12"},{"unstructured":"Gorga, G., Madoz, M., Heavy, P.: Towards a proposal of metrics for evaluating educational software. Laboratory Research and Development in Informatics, pp. 16\u201318","key":"11_CR13"},{"key":"11_CR14","first-page":"50","volume":"6","author":"SE Duran Rubio","year":"2003","unstructured":"Duran Rubio, S.E.: Points for function. Metric standard to set the size of the software. Comput. Policy Bull. 6, 50\u201363 (2003)","journal-title":"Comput. Policy Bull."},{"unstructured":"Duran Rubio, S.E.: Puntos por funci\u00f3n. M\u00e9tricas est\u00e1ndar para establecer el tama\u00f1o del software. Bolet\u00edn de Pol\u00edtica Inform\u00e1tica, No. 6, pp. 50\u201363 (2003)","key":"11_CR15"},{"unstructured":"PMI: A Guide to the Project Management of Body (2013)","key":"11_CR16"},{"unstructured":"Spector, A., Gifford, D.: A computer science perspective of bridge design (2010)","key":"11_CR17"},{"unstructured":"Alba, C.: Prediction and classification of the risk level in systems projects. Oviedo University (2008)","key":"11_CR18"},{"key":"11_CR19","doi-asserted-by":"crossref","DOI":"10.1002\/9780470405697","volume-title":"Managing and Leading Software Projects","author":"R Fairley","year":"2009","unstructured":"Fairley, R.: Managing and Leading Software Projects. Wiley - IEEE Computer Society Press, New York (2009)"},{"issue":"4","key":"11_CR20","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1057\/palgrave.ejis.3000406","volume":"10","author":"A Al-Mudimigh","year":"2001","unstructured":"Al-Mudimigh, A., Zairi, M., Al-Mashari, M.: ERP software implementation: an integrative framework. Eur. J. Inf. Syst. 10(4), 216\u2013226 (2001)","journal-title":"Eur. J. Inf. Syst."},{"unstructured":"Tomala, C., Jazmin, S.: Quality metrics information systems, application quality certification of a company in the oil and gas sector. Guayaquil-ESPOL (2009)","key":"11_CR21"},{"issue":"3","key":"11_CR22","first-page":"55","volume":"6","author":"J Garz\u00e1s","year":"2010","unstructured":"Garz\u00e1s, J., Irrazabal, E.: Basic metrics and analysis of open source tools to measure maintainability. REICIS Rev. Esp. Innovaci\u00f3n 6(3), 55\u201365 (2010)","journal-title":"REICIS Rev. Esp. Innovaci\u00f3n"},{"unstructured":"Scalone, F.: Comparative study of models and software quality standards (2006)","key":"11_CR23"},{"key":"11_CR24","volume-title":"Analysis and Design of Systems","author":"K Kendall","year":"2005","unstructured":"Kendall, K., Kendall, J.: Analysis and Design of Systems. Ed. Pearson Education, Essex (2005)"},{"unstructured":"Lafuente, G. J.: Conceptual framework for the definition and exploitation of quality metrics. Malaga University, Malaga (2014)","key":"11_CR25"}],"container-title":["Communications in Computer and Information Science","Technologies and Innovation"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-48024-4_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,25]],"date-time":"2017-06-25T01:33:21Z","timestamp":1498354401000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-48024-4_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319480237","9783319480244"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-48024-4_11","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2016]]}}}