{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T10:22:50Z","timestamp":1725877370225},"publisher-location":"Cham","reference-count":22,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319508795"},{"type":"electronic","value":"9783319508801"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-50880-1_18","type":"book-chapter","created":{"date-parts":[[2017,1,2]],"date-time":"2017-01-02T13:42:18Z","timestamp":1483364538000},"page":"201-211","source":"Crossref","is-referenced-by-count":0,"title":["A Dynamic Model of Logistic Management for Obtaining Activated Carbon"],"prefix":"10.1007","author":[{"given":"Germ\u00e1n Andr\u00e9s","family":"M\u00e9ndez-Giraldo","sequence":"first","affiliation":[]},{"given":"Julio","family":"Estevez","sequence":"additional","affiliation":[]},{"given":"Cristhian","family":"Pinto-Anaya","sequence":"additional","affiliation":[]},{"given":"Jorge","family":"Ruiz-Vaca","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,1,3]]},"reference":[{"key":"18_CR1","first-page":"687","volume":"135","author":"A Gunasekaran","year":"2011","unstructured":"Gunasekaran, A., Ngai, E.: The future of operations management: an outlook and analysis. Int. J. Prod. Econ. 135, 687\u2013701 (2011)","journal-title":"Int. J. Prod. Econ."},{"key":"18_CR2","first-page":"368","volume":"6","author":"A Oko","year":"2016","unstructured":"Oko, A., Singh Kang, P.: Lean six sigma approach to improve the admissions process for a Nigerian HE Institute. Int. J. Sci. Eng. Res. 6, 368\u2013378 (2016)","journal-title":"Int. J. Sci. Eng. Res."},{"key":"18_CR3","volume-title":"Agent-Based Manufacturing and Control Systems","author":"M Paolucci","year":"2005","unstructured":"Paolucci, M., Sacile, R.: Agent-Based Manufacturing and Control Systems. CRC Press, Boca Raton (2005)"},{"key":"18_CR4","unstructured":"Centro de Desarrollo Industrial TECSOL: Identificaci\u00f3n de alternativas para producci\u00f3n de carb\u00f3n activado a partir de carb\u00f3n del Cerrej\u00f3n y su an\u00e1lisis de mercado nacional e internacional. Bogot\u00e1 (2013)"},{"key":"18_CR5","volume-title":"Pirolisis de biomasa","author":"A G\u00f3mez","year":"2008","unstructured":"G\u00f3mez, A., Klose, W., Rinc\u00f3n, S.: Pirolisis de biomasa. Kassel Univ. Press, Kassel (2008)"},{"key":"18_CR6","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4471-6272-8","volume-title":"Manufacturing Scheduling Systems","author":"J Framinan","year":"2014","unstructured":"Framinan, J., Leisten, R., Ruiz, R.: Manufacturing Scheduling Systems. Springer, London (2014)"},{"key":"18_CR7","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4613-1187-4","volume-title":"Cellular Manufacturing Systems","author":"N Singh","year":"1996","unstructured":"Singh, N., Rajamani, D.: Cellular Manufacturing Systems. Chapman & Hall, London (1996)"},{"key":"18_CR8","unstructured":"\u00c7elikbilek, C., S\u00fcer, G.: Joint optimization model for manufacturing scheduling and transportation mode selection. In: Asian Conference of Management Science and Applications (2013)"},{"key":"18_CR9","unstructured":"Cable, A., Melone, P.: Method for improving the utilization of manufacturing machines. Manufacturing processes, US20150142548 A1 (2015)"},{"key":"18_CR10","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-5237-6","volume-title":"Multiobjective Scheduling by Genetic Algorithms","author":"T Bagchi","year":"1999","unstructured":"Bagchi, T.: Multiobjective Scheduling by Genetic Algorithms. Kluwer Academic Publishers, Boston (1999)"},{"key":"18_CR11","volume-title":"Operations Management for Competitive Advantage","author":"R Chase","year":"2004","unstructured":"Chase, R., Aquilano, N., Jacobs, F.: Operations Management for Competitive Advantage. McGraw-Hill, Boston (2004)"},{"key":"18_CR12","volume-title":"Design and Analysis of Lean Production Systems","author":"R Askin","year":"2002","unstructured":"Askin, R., Goldberg, J.: Design and Analysis of Lean Production Systems. Wiley, New York (2002)"},{"key":"18_CR13","doi-asserted-by":"crossref","unstructured":"Chaudhari, S., Yawale, V., Dalu, R.: Low cost approach to manufacturing problem solving. Int. J. Mater. Sci. Eng. (2014)","DOI":"10.12720\/ijmse.2.1.33-38"},{"key":"18_CR14","unstructured":"Buffa, E., Sarin, R.: Administraci\u00f3n de la producci\u00f3n y de las operaciones. Ed. Limusa, Mexico (1992)"},{"key":"18_CR15","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4899-7578-2","volume-title":"Procurement and Supplier Management. Distribution Planning and Control","author":"D Ross","year":"2015","unstructured":"Ross, D.: Procurement and Supplier Management. Distribution Planning and Control. Springer Science, Business Media, New York (2015)"},{"key":"18_CR16","volume-title":"Analysis and Control of Production Systems","author":"E Elsayed","year":"1994","unstructured":"Elsayed, E., Boucher, T.: Analysis and Control of Production Systems. Prentice-Hall, Englewood Cliffs (1994)"},{"key":"18_CR17","volume-title":"Principles of Systems","author":"F Forrester","year":"1968","unstructured":"Forrester, F.: Principles of Systems. Wright-Allen Press, Cambridge (1968)"},{"key":"18_CR18","volume-title":"Industrial Dynamics","author":"F Forrester","year":"1961","unstructured":"Forrester, F.: Industrial Dynamics. M.I.T. Press, Cambridge (1961)"},{"key":"18_CR19","volume-title":"Business Dynamics","author":"J Sterman","year":"2000","unstructured":"Sterman, J.: Business Dynamics. McGraw-Hill, Boston (2000)"},{"key":"18_CR20","doi-asserted-by":"crossref","unstructured":"Umeda, S.: Supply-chain simulation integrated discrete-event modeling with system-dynamics modeling. In: Olhager, J., Persson, F. (eds.) Advances in Production Management Systems, vol. 246, pp. 329\u2013336. Springer, New York (2007)","DOI":"10.1007\/978-0-387-74157-4_39"},{"key":"18_CR21","doi-asserted-by":"crossref","first-page":"207","DOI":"10.1007\/s11134-011-9272-8","volume":"70","author":"V Kulkarni","year":"2011","unstructured":"Kulkarni, V., Yan, K.: Production-inventory systems in stochastic environment and stochastic lead times. Queueing Syst. 70, 207\u2013231 (2011)","journal-title":"Queueing Syst."},{"key":"18_CR22","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1007\/s10951-013-0330-4","volume":"17","author":"T Ng","year":"2013","unstructured":"Ng, T., Sy, C.: A resilience optimization approach for workforce-inventory control dynamics under uncertainty. J. Sched. 17, 427\u2013444 (2013)","journal-title":"J. Sched."}],"container-title":["Communications in Computer and Information Science","Applied Computer Sciences in Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-50880-1_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,17]],"date-time":"2019-09-17T03:21:12Z","timestamp":1568690472000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-50880-1_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319508795","9783319508801"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-50880-1_18","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2016]]}}}