{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T11:19:52Z","timestamp":1725880792849},"publisher-location":"Cham","reference-count":28,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319539812"},{"type":"electronic","value":"9783319539829"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-53982-9_12","type":"book-chapter","created":{"date-parts":[[2017,2,14]],"date-time":"2017-02-14T15:14:02Z","timestamp":1487085242000},"page":"201-222","source":"Crossref","is-referenced-by-count":0,"title":["Assessment of Risks in Manufacturing Using Discrete-Event Simulation"],"prefix":"10.1007","author":[{"given":"Renaud","family":"De Landtsheer","sequence":"first","affiliation":[]},{"given":"Gustavo","family":"Ospina","sequence":"additional","affiliation":[]},{"given":"Philippe","family":"Massonet","sequence":"additional","affiliation":[]},{"given":"Christophe","family":"Ponsard","sequence":"additional","affiliation":[]},{"given":"Stephan","family":"Printz","sequence":"additional","affiliation":[]},{"given":"Sabina","family":"Jeschke","sequence":"additional","affiliation":[]},{"given":"Lasse","family":"H\u00e4rtel","sequence":"additional","affiliation":[]},{"given":"Johann Philipp","family":"von Cube","sequence":"additional","affiliation":[]},{"given":"Robert","family":"Schmitt","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,2,15]]},"reference":[{"key":"12_CR1","doi-asserted-by":"crossref","unstructured":"Deleris, L., Erhun, F.: Risk management in supply networks using Monte-Carlo simulation. In: 2005 Winter Simulation Conference, Orlando, USA (2005)","DOI":"10.1109\/WSC.2005.1574434"},{"key":"12_CR2","unstructured":"Printz, S., von Cube, J.P., Ponsard, C.: Management of procurement risks on manufacturing processes - survey results (2015). http:\/\/simqri.com\/uploads\/media\/Survey_Results.pdf"},{"key":"12_CR3","unstructured":"von Cube, J.P., Abbas, B., Schmitt, R., Jeschke, S.: A monetary approach of risk management in procurement. In: 7th International Conference on Production Research Americas\u2019 2014, Lima, Peru, pp. 35\u201340 (2014)"},{"key":"12_CR4","unstructured":"OscaR: OscaR: Scala in OR (2012). https:\/\/bitbucket.org\/oscarlib\/oscar"},{"key":"12_CR5","first-page":"236","volume-title":"Erfolgsfaktor Risiko-Management","author":"F Romeike","year":"2004","unstructured":"Romeike, F.: Der prozess der risikosteuerung und kontrolle. In: Romeike, F. (ed.) Erfolgsfaktor Risiko-Management, pp. 236\u2013243. Gabler, Wiesbaden (2004)"},{"key":"12_CR6","doi-asserted-by":"crossref","unstructured":"Zsidisin, G.A., Ritchie, B.: Supply Chain Risk: A Handbook of Assessment, Management, and Performance. Springer, New York (2009)","DOI":"10.1007\/978-0-387-79934-6"},{"key":"12_CR7","volume-title":"Risikokostenrechnung: Erfolgreiche Informationsversorgung und Risikopr\u00e4vention","author":"M Siepermann","year":"2008","unstructured":"Siepermann, M.: Risikokostenrechnung: Erfolgreiche Informationsversorgung und Risikopr\u00e4vention. Erich Schmidt, Berlin (2008)"},{"key":"12_CR8","doi-asserted-by":"crossref","unstructured":"Sutton, I.: Process Risk and Reliability Management, 2nd edn. Elsevier (2015)","DOI":"10.1016\/B978-0-12-801653-4.00001-1"},{"key":"12_CR9","doi-asserted-by":"crossref","unstructured":"Printz, S., von Cube, J.P., Vossen, R., Schmitt, R., Jeschke, S.: Ein kybernetisches modell beschaffungsinduzierter st\u00f6rg\u00f6\u00dfen. In: Exploring Cybernetics - Kybernetik im interdisziplinren Diskurs. Springer Spektrum (2015)","DOI":"10.1007\/978-3-658-11755-9_12"},{"key":"12_CR10","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-319-14256-2","volume-title":"Probability Distributions in Risk Management Operations","author":"C Artikis","year":"2015","unstructured":"Artikis, C., Artikis, P.: Probability Distributions in Risk Management Operations. Springer, London (2015)"},{"key":"12_CR11","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4471-4588-2","volume-title":"The Monte Carlo Simulation Method for System Reliability and Risk Analysis","author":"E Zio","year":"2013","unstructured":"Zio, E.: The Monte Carlo Simulation Method for System Reliability and Risk Analysis. Springer, London (2013)"},{"issue":"6","key":"12_CR12","first-page":"612","volume":"30","author":"W Glei\u00dfner","year":"2012","unstructured":"Glei\u00dfner, W.: Quantitative methods for risk management in the real estate development industry. J. Prop. Investment Financ. 30(6), 612\u2013630 (2012)","journal-title":"J. Prop. Investment Financ."},{"key":"12_CR13","doi-asserted-by":"crossref","unstructured":"Finke, G.R., Schmitt, A., Singh, M.: Modeling and simulating supply chain schedule risk. In: 2010 Winter Simulation Conference, Baltimore, USA (2010)","DOI":"10.1109\/WSC.2010.5679036"},{"key":"12_CR14","doi-asserted-by":"crossref","DOI":"10.1002\/9781118762745","volume-title":"Discrete-Event Simulation and Systems Dynamics for Management Decision Making","author":"S Brailsford","year":"2014","unstructured":"Brailsford, S., Churilov, L., Dangerfield, B.: Discrete-Event Simulation and Systems Dynamics for Management Decision Making. Wiley, Chichester (2014)"},{"key":"12_CR15","unstructured":"Byong-Kyu, C., Donghun, K.: Modeling and Simulation of Discrete-Event Systems. Wiley (2013)"},{"key":"12_CR16","unstructured":"AnyLogic: AnyLogic Multimethod Simulation Software (2015). http:\/\/www.anylogic.com"},{"key":"12_CR17","unstructured":"Automation, R.: Arena Simulation Software (2015). https:\/\/www.arenasimulation.com"},{"key":"12_CR18","unstructured":"Siemens: Plant Simulator (2015). http:\/\/goo.gl\/gH63jw"},{"key":"12_CR19","unstructured":"Wampler, D., Payne, A.: Programming Scala. 2nd edn. O\u2019Reilly media (2015)"},{"key":"12_CR20","unstructured":"Boostrap: Bootstrap website (2016). http:\/\/getbootstrap.com"},{"key":"12_CR21","unstructured":"The jQuery Foundation: jQuery website (2016). https:\/\/jquery.com"},{"key":"12_CR22","unstructured":"ClientIO: JointJS website (2016). http:\/\/jointjs.com"},{"key":"12_CR23","unstructured":"Scalatra: Scalatra website (2016). http:\/\/scalatra.org"},{"key":"12_CR24","doi-asserted-by":"crossref","unstructured":"Klimov, R.A., Merkuyev, Y.A.: Simulation-based risk measurement in supply chains. In: 20th European Conference on Modelling and Simulation (ECMS 2006), Bonn, Germany (2006)","DOI":"10.7148\/2006-0413"},{"key":"12_CR25","doi-asserted-by":"crossref","unstructured":"Schmitt, A., Singh, M.: Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation. In: 2009 Winter Simulation Conference, Austin, USA (2009)","DOI":"10.1109\/WSC.2009.5429561"},{"key":"12_CR26","doi-asserted-by":"crossref","unstructured":"Almeder, C., Preusser, M., Hartl, R.F.: Simulation and optimization of supply chains: alternative or complementary approaches? In G\u00fcnther, H.O., Meyr, H. (eds.) Supply Chain Planning, pp. 1\u201325. Springer, Heidelberg (2009)","DOI":"10.1007\/978-3-540-93775-3_2"},{"key":"12_CR27","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1007\/978-3-319-25747-1_26","volume-title":"Advances in Conceptual Modeling","author":"AE Arenas","year":"2015","unstructured":"Arenas, A.E., Massonet, P., Ponsard, C., Aziz, B.: Goal-oriented requirement engineering support for business continuity planning. In: Jeusfeld, M.A., Karlapalem, K. (eds.) ER 2015. LNCS, vol. 9382, pp. 259\u2013269. Springer, Cham (2015). doi: 10.1007\/978-3-319-25747-1_26"},{"key":"12_CR28","unstructured":"SimQRi: Online SimQRi tool (2015). https:\/\/simqri.cetic.be"}],"container-title":["Communications in Computer and Information Science","Operations Research and Enterprise Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-53982-9_12","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,22]],"date-time":"2023-08-22T06:35:35Z","timestamp":1692686135000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-53982-9_12"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319539812","9783319539829"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-53982-9_12","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2017]]}}}