{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T11:25:51Z","timestamp":1725881151825},"publisher-location":"Cham","reference-count":29,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319541563"},{"type":"electronic","value":"9783319541570"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-54157-0_33","type":"book-chapter","created":{"date-parts":[[2017,2,18]],"date-time":"2017-02-18T08:11:54Z","timestamp":1487405514000},"page":"484-498","source":"Crossref","is-referenced-by-count":1,"title":["Predator-Prey Techniques for Solving Multiobjective Scheduling Problems for Unrelated Parallel Machines"],"prefix":"10.1007","author":[{"given":"Ana Am\u00e9lia S.","family":"Pereira","sequence":"first","affiliation":[]},{"given":"Helio J. C.","family":"Barbosa","sequence":"additional","affiliation":[]},{"given":"Heder S.","family":"Bernardino","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,2,19]]},"reference":[{"issue":"5\u20138","key":"33_CR1","doi-asserted-by":"crossref","first-page":"741","DOI":"10.1007\/s00170-010-3100-x","volume":"55","author":"JEC Arroyo","year":"2011","unstructured":"Arroyo, J.E.C., de Souza Pereira, A.A.: A GRASP heuristic for the multi-objective permutation flowshop scheduling problem. Intl. J. Adv. Manufact. Technol. 55(5\u20138), 741\u2013753 (2011)","journal-title":"Intl. J. Adv. Manufact. Technol."},{"issue":"4","key":"33_CR2","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1016\/S0895-7177(00)00250-8","volume":"33","author":"J Bank","year":"2001","unstructured":"Bank, J., Werner, F.: Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties. Math. Comput. Model. 33(4), 363\u2013383 (2001)","journal-title":"Math. Comput. Model."},{"key":"33_CR3","doi-asserted-by":"crossref","unstructured":"Barbosa, H.J.C., Bernardino, H.S., Barreto, A.M.S.: Using performance profiles to analyze the results of the 2006 CEC constrained optimization competition. In: Proceedings of the IEEE World Congress on Computational Intelligence (2010)","DOI":"10.1109\/CEC.2010.5586105"},{"key":"33_CR4","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/j.entcs.2014.01.020","volume":"302","author":"JP CM Nogueira de","year":"2014","unstructured":"de CM Nogueira, J.P., Arroyo, J.E.C., Villadiego, H.M.M., Gon\u00e7alves, L.B.: Hybrid grasp heuristics to solve an unrelated parallel machine scheduling problem with earliness and tardiness penalties. Electron. Notes Theor. Comput. Sci. 302, 53\u201372 (2014)","journal-title":"Electron. Notes Theor. Comput. Sci."},{"key":"33_CR5","series-title":"Wiley- Interscience Series in Systems and Optimization","volume-title":"Multi-objective optimization using evolutionary algorithms","author":"K Deb","year":"2001","unstructured":"Deb, K.: Multi-objective optimization using evolutionary algorithms. Wiley- Interscience Series in Systems and Optimization. Wiley, New York (2001)"},{"key":"33_CR6","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"849","DOI":"10.1007\/3-540-45356-3_83","volume-title":"Parallel Problem Solving from Nature PPSN VI","author":"K Deb","year":"2000","unstructured":"Deb, K., Agrawal, S., Pratap, A., Meyarivan, T.: A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NSGA-II. In: Schoenauer, M., Deb, K., Rudolph, G., Yao, X., Lutton, E., Merelo, J.J., Schwefel, H.-P. (eds.) PPSN 2000. LNCS, vol. 1917, pp. 849\u2013858. Springer, Heidelberg (2000). doi: 10.1007\/3-540-45356-3_83"},{"issue":"2","key":"33_CR7","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/s101070100263","volume":"91","author":"ED Dolan","year":"2002","unstructured":"Dolan, E.D., Mor\u00e9, J.J.: Benchmarking optimization software with performance profiles. Math. Program. 91(2), 201\u2013213 (2002)","journal-title":"Math. Program."},{"key":"33_CR8","doi-asserted-by":"crossref","unstructured":"Etcheverry, G.V., Anzanello, M.A.: Sequenciamento em m\u00e1quinas paralelas com tempos de setup dependentes da sequ\u00eancia. In: XXXIII Encontro Nacional de Engenharia de Produ\u00e7\u00e3o (2013)","DOI":"10.14488\/1676-1901.v14i3.1498"},{"issue":"1","key":"33_CR9","doi-asserted-by":"crossref","first-page":"224","DOI":"10.1016\/j.cie.2012.10.002","volume":"64","author":"KT Fang","year":"2013","unstructured":"Fang, K.T., Lin, B.M.: Parallel-machine scheduling to minimize tardiness penalty and power cost. Comput. Ind. Eng. 64(1), 224\u2013234 (2013)","journal-title":"Comput. Ind. Eng."},{"issue":"4","key":"33_CR10","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1007\/s10951-011-0256-7","volume":"16","author":"C Grimme","year":"2013","unstructured":"Grimme, C., Lepping, J., Schwiegelshohn, U.: Multi-criteria scheduling: an agentbased approach for expert knowledge integration. J. Sched. 16(4), 369\u2013383 (2013)","journal-title":"J. Sched."},{"issue":"3","key":"33_CR11","doi-asserted-by":"crossref","first-page":"592","DOI":"10.1016\/j.ejor.2004.07.011","volume":"167","author":"H Hoogeveen","year":"2005","unstructured":"Hoogeveen, H.: Multicriteria scheduling. Eur. J. Oper. Res. 167(3), 592\u2013623 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"33_CR12","unstructured":"Kayvanfar, V., Aalaei, A., Hosseininia, M., Rajabi, M.: Unrelated parallel machine scheduling problem with sequence dependent setup times. In: International Conference on Industrial Engineering and Operations Management, Bali, pp. 7\u20139 (2014)"},{"key":"33_CR13","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1007\/BFb0056867","volume-title":"Parallel Problem Solving from Nature \u2014 PPSN V","author":"M Laumanns","year":"1998","unstructured":"Laumanns, M., Rudolph, G., Schwefel, H.-P.: A spatial predator-prey approach to multi-objective optimization: a preliminary study. In: Eiben, A.E., B\u00e4ck, T., Schoenauer, M., Schwefel, H.-P. (eds.) PPSN 1998. LNCS, vol. 1498, pp. 241\u2013249. Springer, Heidelberg (1998). doi: 10.1007\/BFb0056867"},{"issue":"3","key":"33_CR14","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1016\/S0377-2217(95)00376-2","volume":"100","author":"YH Lee","year":"1997","unstructured":"Lee, Y.H., Pinedo, M.: Scheduling jobs on parallel machines with sequencedependent setup times. Eur. J. Oper. Res. 100(3), 464\u2013474 (1997)","journal-title":"Eur. J. Oper. Res."},{"issue":"9\u201310","key":"33_CR15","doi-asserted-by":"crossref","first-page":"926","DOI":"10.1007\/s00170-008-1770-4","volume":"43","author":"D Lei","year":"2009","unstructured":"Lei, D.: Multi-objective production scheduling: a survey. Intl. J. Adv. Manuf. Technol. 43(9\u201310), 926\u2013938 (2009)","journal-title":"Intl. J. Adv. Manuf. Technol."},{"issue":"12","key":"33_CR16","doi-asserted-by":"crossref","first-page":"2299","DOI":"10.1080\/00207540500446394","volume":"44","author":"B Lin","year":"2006","unstructured":"Lin, B., Wu, J.: Bicriteria scheduling in a two-machine permutation flowshop. Intl. J. Prod. Res. 44(12), 2299\u20132312 (2006)","journal-title":"Intl. J. Prod. Res."},{"key":"33_CR17","doi-asserted-by":"crossref","unstructured":"Lin, Y.K.: Particle swarm optimization algorithm for unrelated parallel machine scheduling with release dates. Mathematical Problems in Engineering (2013)","DOI":"10.1155\/2013\/409486"},{"issue":"1","key":"33_CR18","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1080\/00207549308956713","volume":"31","author":"B MacCarthy","year":"1993","unstructured":"MacCarthy, B., Liu, J.: Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. Intl. J. Prod. Res. 31(1), 59\u201379 (1993)","journal-title":"Intl. J. Prod. Res."},{"key":"33_CR19","unstructured":"de Souza Pereira, A.A.: An\u00e1lise de objetivos e meta-heur\u00edsticas para problemas multiobjetivo de sequenciamento da Produ\u00e7\u00e3o. Ph.D. thesis. Universidade Federal de Juiz de Fora, Juiz de Fora, Brasil (2016)"},{"key":"33_CR20","unstructured":"de Souza Pereira, A.A., Bernardino, H.S., Barbosa, H.J.C.: Compara\u00e7\u00e3o entre abordagens multiobjetivo e mono-objetivo para o problema de programa\u00e7\u00e3o em m\u00e1quinas paralelas n\u00e3o relacionadas com tempos de prepara\u00e7\u00e3o dependentes da sequ\u00eancia e datas de libera\u00e7\u00e3o. In: XXI Simp\u00f3sio de Engenharia de Produ\u00e7\u00e3o (2014)"},{"issue":"3","key":"33_CR21","first-page":"230","volume":"21","author":"M Pfund","year":"2004","unstructured":"Pfund, M., Fowler, J.W., Gupta, J.N.: A survey of algorithms for single and multiobjective unrelated parallel-machine deterministic scheduling problems. J. Chin. Inst. Ind. Eng. 21(3), 230\u2013241 (2004)","journal-title":"J. Chin. Inst. Ind. Eng."},{"key":"33_CR22","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-2361-4","volume-title":"Scheduling: Theory, Algorithms, and Systems","author":"ML Pinedo","year":"2012","unstructured":"Pinedo, M.L.: Scheduling: Theory, Algorithms, and Systems, 4th edn. Springer Publishing Company, Incorporated, Heidelberg (2012)","edition":"4"},{"issue":"4","key":"33_CR23","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1016\/j.cor.2006.07.014","volume":"35","author":"R Ruiz","year":"2008","unstructured":"Ruiz, R., \u015eerifo\u011flu, F.S., Urlings, T.: Modeling realistic hybrid flexible flowshop scheduling problems. Comput. Oper. Res. 35(4), 1151\u20131175 (2008)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"33_CR24","doi-asserted-by":"crossref","first-page":"2033","DOI":"10.1016\/j.ejor.2005.12.009","volume":"177","author":"R Ruiz","year":"2007","unstructured":"Ruiz, R., St\u00fctzle, T.: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. Eur. J. Oper. Res. 177(3), 2033\u20132049 (2007)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"33_CR25","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/0360-8352(95)00028-3","volume":"30","author":"V Suresh","year":"1996","unstructured":"Suresh, V., Chaudhuri, D.: Bicriteria scheduling problem for unrelated parallel machines. Comput. Ind. Eng. 30(1), 77\u201382 (1996)","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"33_CR26","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/S0377-2217(00)00288-5","volume":"135","author":"V T\u2019kindt","year":"2001","unstructured":"T\u2019kindt, V., Billaut, J.C., Proust, C.: Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry. Eur. J. Oper. Res. 135(1), 42\u201349 (2001)","journal-title":"Eur. J. Oper. Res."},{"issue":"12","key":"33_CR27","doi-asserted-by":"crossref","first-page":"4750","DOI":"10.1016\/j.asoc.2013.07.029","volume":"13","author":"SA Torabi","year":"2013","unstructured":"Torabi, S.A., Sahebjamnia, N., Mansouri, S.A., Bajestani, M.A.: A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Appl. Soft Comput. 13(12), 4750\u20134762 (2013)","journal-title":"Appl. Soft Comput."},{"issue":"3","key":"33_CR28","doi-asserted-by":"crossref","first-page":"612","DOI":"10.1016\/j.ejor.2011.01.011","volume":"211","author":"E Vallada","year":"2011","unstructured":"Vallada, E., Ruiz, R.: A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. Eur. J. Oper. Res. 211(3), 612\u2013622 (2011)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"33_CR29","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1109\/4235.797969","volume":"3","author":"E Zitzler","year":"1999","unstructured":"Zitzler, E., Thiele, L.: Multiobjective evolutionary algorithms: a comparative case study and the strength pareto approach. IEEE Trans. Evol. Comput. 3(4), 257\u2013271 (1999)","journal-title":"IEEE Trans. Evol. Comput."}],"container-title":["Lecture Notes in Computer Science","Evolutionary Multi-Criterion Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-54157-0_33","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,18]],"date-time":"2019-09-18T21:24:09Z","timestamp":1568841849000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-54157-0_33"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319541563","9783319541570"],"references-count":29,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-54157-0_33","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]}}}