{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T18:08:38Z","timestamp":1725905318146},"publisher-location":"Cham","reference-count":8,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319557014"},{"type":"electronic","value":"9783319557021"}],"license":[{"start":{"date-parts":[[2017,7,21]],"date-time":"2017-07-21T00:00:00Z","timestamp":1500595200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-55702-1_64","type":"book-chapter","created":{"date-parts":[[2017,7,20]],"date-time":"2017-07-20T10:21:16Z","timestamp":1500546076000},"page":"481-488","source":"Crossref","is-referenced-by-count":0,"title":["Lot Sizing and Scheduling for Companies with Tooling Machines"],"prefix":"10.1007","author":[{"given":"Florian","family":"Isenberg","sequence":"first","affiliation":[]},{"given":"Leena","family":"Suhl","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,7,21]]},"reference":[{"issue":"5","key":"64_CR1","doi-asserted-by":"crossref","first-page":"724","DOI":"10.1287\/mnsc.46.5.724.12048","volume":"46","author":"G Belvaux","year":"2000","unstructured":"Belvaux, G., Wolsey, L.A.: bc-prod: a specialized Branch-and-Cut system for Lot-Sizing problems. Manage. Sci. 46(5), 724\u2013738 (2000)","journal-title":"Manage. Sci."},{"issue":"2","key":"64_CR2","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/s00291-008-0150-7","volume":"32","author":"L Buschk\u00fchl","year":"2010","unstructured":"Buschk\u00fchl, L., Sahling, F., Helber, S., Tempelmeier, H.: Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spect. 32(2), 231\u2013261 (2010)","journal-title":"OR Spect."},{"key":"64_CR3","doi-asserted-by":"publisher","unstructured":"Copil, K., W\u00f6rbelauer, M., Meyr, H., Tempelmeier, H.: Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spect. (2016). doi:\n10.1007\/s00291-015-0429-4","DOI":"10.1007\/s00291-015-0429-4"},{"key":"64_CR4","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-12494-5","volume-title":"Advanced Manufacturing and Sustainable Logistics","author":"W Dangelmaier","year":"2010","unstructured":"Dangelmaier, W.: A concept for an accurate and closely coordinated production. In: Dangelmaier, W., Blecken, A., Delius, R., Kl\u00f6pfer, S. (eds.) Advanced Manufacturing and Sustainable Logistics. Springer, Berlin (2010)"},{"issue":"4","key":"64_CR5","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1007\/s10732-007-9011-9","volume":"13","author":"SA Araujo De","year":"2007","unstructured":"De Araujo, S.A., Arenales, M.N., Clark, A.R.: Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J. Heuristics 13(4), 337\u2013358 (2007)","journal-title":"J. Heuristics"},{"issue":"2","key":"64_CR6","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1002\/(SICI)1097-0037(199809)32:2<85::AID-NET2>3.0.CO;2-E","volume":"32","author":"A Kimms","year":"1998","unstructured":"Kimms, A., Drexl, A.: Proportional lot sizing and scheduling: some extensions. Networks 32(2), 85\u2013101 (1998)","journal-title":"Networks"},{"issue":"8","key":"64_CR7","doi-asserted-by":"crossref","first-page":"810","DOI":"10.1057\/palgrave.jors.2600773","volume":"50","author":"L \u00d6zdamar","year":"1999","unstructured":"\u00d6zdamar, L., Barbaroso\u01e7lu, G.: Hybrid heuristics for the multi-stage capacitated lot sizing and loading problem. J. Oper. Res. Soc. 50(8), 810\u2013825 (1999)","journal-title":"J. Oper. Res. Soc."},{"issue":"3","key":"64_CR8","doi-asserted-by":"crossref","first-page":"404","DOI":"10.1016\/j.ejor.2012.10.011","volume":"225","author":"H Stadtler","year":"2013","unstructured":"Stadtler, H., Sahling, F.: A lot-sizing and scheduling model for multi-stage flow lines with zero lead times. Eur. J. Oper. Res. 225(3), 404\u2013419 (2013)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2016"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-55702-1_64","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,7,20]],"date-time":"2017-07-20T10:36:03Z","timestamp":1500546963000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-55702-1_64"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,7,21]]},"ISBN":["9783319557014","9783319557021"],"references-count":8,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-55702-1_64","relation":{},"ISSN":["0721-5924","2197-9294"],"issn-type":[{"type":"print","value":"0721-5924"},{"type":"electronic","value":"2197-9294"}],"subject":[],"published":{"date-parts":[[2017,7,21]]}}}