{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:35:44Z","timestamp":1759667744124},"publisher-location":"Cham","reference-count":8,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319557014"},{"type":"electronic","value":"9783319557021"}],"license":[{"start":{"date-parts":[[2017,7,21]],"date-time":"2017-07-21T00:00:00Z","timestamp":1500595200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-55702-1_69","type":"book-chapter","created":{"date-parts":[[2017,7,20]],"date-time":"2017-07-20T14:21:16Z","timestamp":1500560476000},"page":"521-526","source":"Crossref","is-referenced-by-count":1,"title":["A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)"],"prefix":"10.1007","author":[{"given":"Mathias","family":"K\u00fchn","sequence":"first","affiliation":[]},{"given":"Sebastian","family":"Dirkmann","sequence":"additional","affiliation":[]},{"given":"Michael","family":"V\u00f6lker","sequence":"additional","affiliation":[]},{"given":"Thorsten","family":"Schmidt","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,7,21]]},"reference":[{"key":"69_CR1","doi-asserted-by":"crossref","unstructured":"Angelidis, E., Bohn, D., Rose, O., Carl, S.: Simulation-based optimization for complex assembly lines with workforce constraints. Simulation in Produktion und Logistik (2013)","DOI":"10.1109\/WSC.2013.6721630"},{"issue":"1","key":"69_CR2","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J., Kan, A.: Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math. 5(1), 11\u201324 (1983)","journal-title":"Discrete Appl. Math."},{"issue":"1","key":"69_CR3","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1007\/s10479-014-1555-0","volume":"217","author":"A Can","year":"2014","unstructured":"Can, A., Ulusoy, G.: Multi-project scheduling with two-stage decomposition. Ann. Oper. Res. 217(1), 95\u2013116 (2014)","journal-title":"Ann. Oper. Res."},{"key":"69_CR4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1\u201314 (2010)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"69_CR5","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R Kolisch","year":"2001","unstructured":"Kolisch, R., Padman, R.: An integrated survey of deterministic project scheduling. Omega 29(3), 249\u2013272 (2001)","journal-title":"Omega"},{"key":"69_CR6","doi-asserted-by":"crossref","unstructured":"Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Springer Science & Business Media (1997)","DOI":"10.1007\/978-1-4615-6329-7"},{"key":"69_CR7","doi-asserted-by":"crossref","unstructured":"Toffolo, T., Santos, H.G., Carvalho, M.A.M., Soares, J.A.: An integer programming approach to the multimode resource-constrained multiproject scheduling problem. J. Sched. 19(3), 295\u2013307 (2016)","DOI":"10.1007\/s10951-015-0422-4"},{"key":"69_CR8","doi-asserted-by":"crossref","unstructured":"Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Berghe, G.V., Verstichel, J.: The multi-mode resource-constrained multi-project scheduling problem. J. Sched. 19(3), 271\u2013283 (2016)","DOI":"10.1007\/s10951-014-0402-0"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2016"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-55702-1_69","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,1]],"date-time":"2019-10-01T04:28:00Z","timestamp":1569904080000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-55702-1_69"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,7,21]]},"ISBN":["9783319557014","9783319557021"],"references-count":8,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-55702-1_69","relation":{},"ISSN":["0721-5924","2197-9294"],"issn-type":[{"type":"print","value":"0721-5924"},{"type":"electronic","value":"2197-9294"}],"subject":[],"published":{"date-parts":[[2017,7,21]]}}}