{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,25]],"date-time":"2026-06-25T12:21:12Z","timestamp":1782390072196,"version":"3.54.5"},"publisher-location":"Cham","reference-count":34,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319565378","type":"print"},{"value":"9783319565385","type":"electronic"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-56538-5_2","type":"book-chapter","created":{"date-parts":[[2017,3,27]],"date-time":"2017-03-27T22:10:58Z","timestamp":1490652658000},"page":"12-19","source":"Crossref","is-referenced-by-count":12,"title":["IT Management of Building Materials\u2019 Planning and Control Processes Using Web-Based Technologies"],"prefix":"10.1007","author":[{"given":"Adedeji","family":"Afolabi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Olabosipo","family":"Fagbenle","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Timothy","family":"Mosaku","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,3,29]]},"reference":[{"issue":"4","key":"2_CR1","first-page":"925","volume":"2","author":"FH Nweke","year":"2015","unstructured":"Nweke, F.H., Ugwu, E.G., Ikegwu, C.A.: Design of project activities tracking system for enhanced project management in Nigeria. Int. J. Res. (IJR) 2(4), 925\u2013937 (2015)","journal-title":"Int. J. Res. (IJR)"},{"issue":"1","key":"2_CR2","first-page":"501","volume":"7","author":"A Afolabi","year":"2016","unstructured":"Afolabi, A., Emeghe, I., Oyeyipo, O., Ojelabi, R.: Professionals\u2019 preference for migrant craftsmen in Lagos State. Mediterr. J. Soc. Sci. 7(1), 501\u2013508 (2016)","journal-title":"Mediterr. J. Soc. Sci."},{"key":"2_CR3","unstructured":"Oladapo, A.A.: The impact of ICT on professional practice in the Nigerian construction industry. Electron. J. Inf. Syst. Dev. Countries 24(2), 1\u201319 (2006)"},{"key":"2_CR4","unstructured":"Maqsood, T., Walker, D.H.T., Finegan, A.D.: An investigation of ICT diffusion in an Australian construction contractor company using SSM. In: Proceedings of the Joint CIB\u2013W107 and CIB\u2013TG23 Symposium on Globalisation and Construction, Bangkok, Thailand, 17\u201319 November, pp. 485\u2013495 (2004)"},{"key":"2_CR5","doi-asserted-by":"crossref","unstructured":"Mole, K.F., Ghobadian, A., O\u2019 Regan, N., Liu, J.: The use and deployment of soft process technologies within UK manufacturing SMEs: an empirical assessment using logit models. J. Small Bus. Manage. 42(3), 303\u2013324 (2004)","DOI":"10.1111\/j.1540-627X.2004.00113.x"},{"key":"2_CR6","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0926-5805(02)00039-0","volume":"12","author":"S Mohamed","year":"2003","unstructured":"Mohamed, S., Stewart, R.A.: An empirical investigation of users\u2019 perceptions of web\u2013based communication on a construction project. Autom. Constr. 12, 43\u201353 (2003)","journal-title":"Autom. Constr."},{"issue":"2","key":"2_CR7","first-page":"65","volume":"3","author":"DR Shoesmith","year":"1995","unstructured":"Shoesmith, D.R.: Using internet as a dissemination channel for construction research. Constr. Info. Technol. 3(2), 65\u201375 (1995)","journal-title":"Constr. Info. Technol."},{"key":"2_CR8","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1016\/S0926-5805(99)00037-0","volume":"10","author":"ZM Deng","year":"2001","unstructured":"Deng, Z.M., Li, H., Tam, C.M., Shen, Q.P., Love, P.E.D.: An application of internet-based project management system. Autom. Constr. 10, 239\u2013246 (2001)","journal-title":"Autom. Constr."},{"key":"2_CR9","doi-asserted-by":"crossref","first-page":"663","DOI":"10.1016\/S0926-5805(98)00112-5","volume":"8","author":"CT Formoso","year":"1999","unstructured":"Formoso, C.T., Revelo, V.H.: Improving the materials supply system in small\u2013sized building firms. Autom. Constr. 8, 663\u2013670 (1999)","journal-title":"Autom. Constr."},{"key":"2_CR10","unstructured":"Kasim, N.B., Anumba, C.J., Dainty, A.R.J.: Improving materials management practices on fast-track construction projects. In: 21st Annual ARCOM Conference, SOAS, University of London, vol. 2, pp. 793\u2013802 (2005)"},{"issue":"4","key":"2_CR11","first-page":"500","volume":"14","author":"E Equere","year":"2010","unstructured":"Equere, E., Tang, L.C.M.: Dearth of automation: the consequences in Nigeria construction industry. Autom. Constr. 14(4), 500\u2013511 (2010)","journal-title":"Autom. Constr."},{"key":"2_CR12","doi-asserted-by":"crossref","unstructured":"Hussin, J.M., Rahman, I.A., Memon, A.H.: The way forward in sustainable construction: issues and challenges. Int. J. Adv. Appl. Sci. 2(1), 15\u201324 (2013)","DOI":"10.11591\/ijaas.v2i1.1321"},{"key":"2_CR13","doi-asserted-by":"crossref","unstructured":"Mehr, S.Y., Omran, A.: Examining the challenges affecting the effectiveness of materials management in the Malaysian construction industry. Int. J. Acad. Res. 5(2), 56\u201363 (2013)","DOI":"10.7813\/2075-4124.2013\/5-2\/A.7"},{"key":"2_CR14","doi-asserted-by":"crossref","unstructured":"Adam, F., Carton, F., Sammon, D.: Project management: a case study of a successful ERP implementation. Int. J. Manage. Projects Bus. 1, 106\u2013124 (2007)","DOI":"10.1201\/9780849380600.pt3"},{"key":"2_CR15","unstructured":"Islam, M.S., Rahman, M.M., Saha, R.K., Saifuddoha, A.M.: Development of Material Requirements Planning (MRP) software with C language. Global J. Comput. Sci. Technol. Softw. Data Eng. 13(3), 12\u201322 (2013)"},{"issue":"3\/4","key":"2_CR16","first-page":"47","volume":"5","author":"H Duzcukoghu","year":"2002","unstructured":"Duzcukoghu, H.: Development a software for material requirements planning and a case study for real Hu\u011flu. J. Technol. 5(3\/4), 47\u201353 (2002)","journal-title":"J. Technol."},{"key":"2_CR17","unstructured":"Oladokun, V.O., Olaitan, O.A.: Development of a Materials Requirements Planning (MRP) software. Pac. J. Sci. Technol. 13, 351\u2013357 (2012)"},{"key":"2_CR18","volume-title":"Modern Construction Management","author":"F Harris","year":"2001","unstructured":"Harris, F., MacCaffer, R.: Modern Construction Management. Blackwell Science, London (2001)"},{"key":"2_CR19","doi-asserted-by":"crossref","unstructured":"Wong, E.T.T., Norman, G.: Economic evaluation of materials planning systems for construction. Constr. Manage. Econ. 15, 39\u201347 (1997)","DOI":"10.1080\/014461997373097"},{"key":"2_CR20","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1108\/09576060210411512","volume":"13","author":"FTS Chan","year":"2002","unstructured":"Chan, F.T.S.: Design of material handling equipment selection system: an integration of expert system with analytic hierarchy process approach. Integr. Manuf. Syst. 13, 58\u201368 (2002)","journal-title":"Integr. Manuf. Syst."},{"key":"2_CR21","first-page":"43","volume":"1","author":"SCW Kong","year":"2001","unstructured":"Kong, S.C.W., Li, H.: An e-commerce system for construction material procurement. Constr. Innov. 1, 43\u201354 (2001)","journal-title":"Constr. Innov."},{"key":"2_CR22","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1016\/S0926-5805(01)00063-2","volume":"2","author":"Z Chen","year":"2002","unstructured":"Chen, Z., Li, H., Wong, C.T.C.: An application of bar-code system for reducing construction wastes. Autom. Constr. 2, 521\u2013533 (2002)","journal-title":"Autom. Constr."},{"key":"2_CR23","doi-asserted-by":"crossref","DOI":"10.4324\/9780203645239","volume-title":"Understanding IT in Construction","author":"M Sun","year":"2004","unstructured":"Sun, M., Howard, R.: Understanding IT in Construction. Spoon Press, London (2004)"},{"key":"2_CR24","unstructured":"De Wolf, C.: Material Quantities in Building Structures and their Environmental Impact. Unpublished MSc. thesis, Department of Architecture, Massachusetts Institute of Technology (MIT), USA (2014)"},{"key":"2_CR25","doi-asserted-by":"crossref","unstructured":"Qiang, L., Khong, T.C., San, W.Y., Jianguo, W., Choy, C.: A web\u2013based material requirement planning integrated application. In: EDOC 2001: Proceedings of the 5th IEEE International Conference on Enterprise Distributed Object Computing, Washington, DC, USA, p. 14 (2001)","DOI":"10.1109\/EDOC.2001.950419"},{"issue":"3","key":"2_CR26","doi-asserted-by":"crossref","first-page":"425","DOI":"10.2307\/30036540","volume":"27","author":"V Venkatesh","year":"2003","unstructured":"Venkatesh, V., Morris, M.G., Davis, G.B., Davis, F.D.: User acceptance of information technology: toward a unified view. MIS Q. 27(3), 425\u2013478 (2003)","journal-title":"MIS Q."},{"issue":"1","key":"2_CR27","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1108\/09699980510576871","volume":"12","author":"V Peansupap","year":"2005","unstructured":"Peansupap, V., Walker, D.H.T.: Factors affecting ICT diffusion: a case study of three large Australian construction contractors. Eng. Constr. Architectural Manage. 12(1), 21\u201337 (2005)","journal-title":"Eng. Constr. Architectural Manage."},{"key":"2_CR28","doi-asserted-by":"crossref","unstructured":"Gambatese, J.A., Hallowell, M.: Enabling and measuring innovation in the construction industry. Constr. Manage. Econ. 29(6), 553\u2013567 (2011)","DOI":"10.1080\/01446193.2011.570357"},{"key":"2_CR29","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/S0377-2217(02)00547-7","volume":"146","author":"EJ Umble","year":"2003","unstructured":"Umble, E.J., Haft, R.R., Umble, M.M.: Enterprise resource planning: implementation procedures and critical success factors. Eur. J. Oper. Res. 146, 241\u2013257 (2003)","journal-title":"Eur. J. Oper. Res."},{"key":"2_CR30","doi-asserted-by":"crossref","unstructured":"Sargent, K., Hyland, P., Sawang, S.: Factors influencing the adoption of information technology in a construction business. Australas. J. Constr. Econ. Build. 12(2), 72\u201386 (2012)","DOI":"10.5130\/ajceb.v12i2.2448"},{"key":"2_CR31","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1016\/S0926-5805(01)00087-5","volume":"11","author":"C Anumba","year":"2002","unstructured":"Anumba, C., Ruikar, K.: Electronic commerce in construction \u2013 trends and prospects. Autom. Constr. 11, 265\u2013275 (2002)","journal-title":"Autom. Constr."},{"key":"2_CR32","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1080\/17452007.2013.775099","volume":"9","author":"JS Goulding","year":"2013","unstructured":"Goulding, J.S., Lou, E.C.W.: E\u2013readiness in construction: an incongruous paradigm of variables. Architectural Eng. Des. Manage. 9, 265\u2013280 (2013)","journal-title":"Architectural Eng. Des. Manage."},{"key":"2_CR33","unstructured":"Kasim, N.B., Ern, P.A.S.: The awareness of ICT implementation for materials management in construction projects. Int. J. Comput. Commun. Technol. 2(1), 1\u201310 (2013)"},{"key":"2_CR34","unstructured":"Wasserman, A.I.: Principles for the Design of Web Applications. Center for Open Source Investigation (COSI) (2006). http:\/\/citeseerx.ist.psu.edu\/viewdoc\/download?doi=10.1.1.81.875rep=rep1type=pdf . Accessed 25 Sept 2015"}],"container-title":["Advances in Intelligent Systems and Computing","Recent Advances in Information Systems and Technologies"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-56538-5_2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,20]],"date-time":"2019-09-20T03:17:36Z","timestamp":1568949456000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-56538-5_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319565378","9783319565385"],"references-count":34,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-56538-5_2","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"value":"2194-5357","type":"print"},{"value":"2194-5365","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017]]}}}