{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T12:04:06Z","timestamp":1725883446656},"publisher-location":"Cham","reference-count":31,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319565378"},{"type":"electronic","value":"9783319565385"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-56538-5_3","type":"book-chapter","created":{"date-parts":[[2017,3,27]],"date-time":"2017-03-27T22:10:58Z","timestamp":1490652658000},"page":"20-30","source":"Crossref","is-referenced-by-count":3,"title":["Characteristics of a Web-Based Integrated Material Planning and Control System for Construction Project Delivery"],"prefix":"10.1007","author":[{"given":"Adedeji","family":"Afolabi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Olabosipo","family":"Fagbenle","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Timothy","family":"Mosaku","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,3,29]]},"reference":[{"issue":"2","key":"3_CR1","first-page":"42","volume":"11","author":"OO Aina","year":"2011","unstructured":"Aina, O.O., Wahab, A.B.: An assessment of build-ability problems in the Nigerian construction industry. Global J. Res. Eng. 11(2), 42\u201352 (2011)","journal-title":"Global J. Res. Eng."},{"issue":"4","key":"3_CR2","first-page":"500","volume":"14","author":"E Equere","year":"2010","unstructured":"Equere, E., Tang, L.C.M.: Dearth of automation: the consequences in Nigeria construction industry. Autom. Constr. 14(4), 500\u2013511 (2010)","journal-title":"Autom. Constr."},{"key":"3_CR3","unstructured":"Shankarnarayanan, S.: ERP systems\u2014using IT to gain a competitive advantage (2003). http:\/\/www.expressindia.com\/newads\/bsl\/advant"},{"key":"3_CR4","unstructured":"Oladapo, A.A.: The impact of ICT on professional practice in the Nigerian construction industry. Electron. J. Inf. Syst. Dev. Countries 24(2), 1\u201319 (2006)"},{"key":"3_CR5","unstructured":"Islam, M.S., Rahman, M.M., Saha, R.K., Saifuddoha, A.M.: Development of Material Requirements Planning (MRP) software with C language. Global J. Comput. Sci. Technol. Softw. Data Eng. 13(3), 12\u201322 (2013)"},{"key":"3_CR6","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0926-5805(02)00039-0","volume":"12","author":"S Mohamed","year":"2003","unstructured":"Mohamed, S., Stewart, R.A.: An empirical investigation of users\u2019 perceptions of web\u2013based communication on a construction project. Autom. Constr. 12, 43\u201353 (2003)","journal-title":"Autom. Constr."},{"key":"3_CR7","unstructured":"Kasim, N.B., Anumba, C.J., Dainty, A.R.J.: Improving materials management practices on fasttrack construction projects. In: 21st Annual ARCOM Conference, SOAS, University of London, vol. 2, pp. 793\u2013802 (2005)"},{"key":"3_CR8","doi-asserted-by":"crossref","unstructured":"Faniran, O.O., Caban, G.: Minimizing waste on construction project sites. Eng. Constr. Architectural Manage. 5(2), 182\u2013188 (1998)","DOI":"10.1108\/eb021073"},{"issue":"6","key":"3_CR9","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1016\/j.autcon.2005.01.004","volume":"14","author":"BH Hadikusumo","year":"2005","unstructured":"Hadikusumo, B.H., Petchpong, S., Charoenngam, C.: Construction material procurement using internet-based agent system. Autom. Constr. 14(6), 736\u2013749 (2005)","journal-title":"Autom. Constr."},{"issue":"2","key":"3_CR10","first-page":"237","volume":"2","author":"VO Oladokun","year":"2009","unstructured":"Oladokun, V.O., Eneyo, E.S., Charles-Owaba, O.E.: Solving the machine set-up problem: a case with a university production workshop. Global J. Eng. Technol. 2(2), 237\u2013242 (2009)","journal-title":"Global J. Eng. Technol."},{"key":"3_CR11","unstructured":"Bowen, P.A., Hall, K.A., Edwards, P.J., Pearl, R.G., Cattell, K.S.: Perceptions of time, cost and quality management on building projects. Aust. J. Constr. Econ. Build. 2(2), 48\u201356 (2000)"},{"key":"3_CR12","volume-title":"Quality Assurance","author":"T Hughes","year":"1991","unstructured":"Hughes, T., Williams, T.: Quality Assurance. BSP Professional Books, Oxford (1991)"},{"key":"3_CR13","volume-title":"Construction Management","author":"R Newcombe","year":"1990","unstructured":"Newcombe, R., Langford, D., Fellows, R.: Construction Management, 2nd edn. Mitchell Publishers, London (1990)","edition":"2"},{"key":"3_CR14","doi-asserted-by":"crossref","unstructured":"Charles, T.J., Andrew, M.A.: Predictors of cost-overrun rates. J. Constr. Eng. Manage. ASCE 116, 548\u2013552 (1990)","DOI":"10.1061\/(ASCE)0733-9364(1990)116:3(548)"},{"key":"3_CR15","volume-title":"Management for Engineers","author":"AC Payne","year":"1996","unstructured":"Payne, A.C., Chelsom, J.V., Reavill, L.R.P.: Management for Engineers. Wiley, Chichester (1996)"},{"key":"3_CR16","doi-asserted-by":"crossref","unstructured":"Mehr, S.Y., Omran, A.: Examining the challenges affecting the effectiveness of materials management in the Malaysian construction industry. Int. J. Acad. Res. 5(2), 56\u201363 (2013)","DOI":"10.7813\/2075-4124.2013\/5-2\/A.7"},{"issue":"4","key":"3_CR17","first-page":"99","volume":"1","author":"EE Ogbadu","year":"2009","unstructured":"Ogbadu, E.E.: Profitability through effective management of materials. J. Econ. Int. Finance 1(4), 99\u2013105 (2009)","journal-title":"J. Econ. Int. Finance"},{"issue":"259","key":"3_CR18","first-page":"1","volume":"12","author":"RF Skoyes","year":"2000","unstructured":"Skoyes, R.F.: Material control to avoid waste. Build. Res. Establishment Dig. UK 12(259), 1\u20138 (2000)","journal-title":"Build. Res. Establishment Dig. UK"},{"key":"3_CR19","unstructured":"Wahab, A.B., Lawal, A.F.: An evaluation of waste control measures in construction industry in Nigeria. Afr. J. Environ. Sci. Technol. 5, 246\u2013254 (2011)"},{"key":"3_CR20","doi-asserted-by":"crossref","unstructured":"Qiang, L., Khong, T.C., San, W.Y., Jianguo, W., Choy, C.: A web\u2013based material requirement planning integrated application. In: EDOC 2001: Proceedings of the 5th IEEE International Conference on Enterprise Distributed Object Computing, Washington, DC, USA, p. 14 (2001)","DOI":"10.1109\/EDOC.2001.950419"},{"issue":"3","key":"3_CR21","first-page":"96","volume":"2","author":"A Hasan","year":"2013","unstructured":"Hasan, A.: A study on material requirement planning system for small scale industries. Mech. Confab 2(3), 96\u2013104 (2013)","journal-title":"Mech. Confab"},{"key":"3_CR22","volume-title":"Modern Construction Management","author":"F Harris","year":"2001","unstructured":"Harris, F., MacCaffer, R.: Modern Construction Management. Blackwell Science, London (2001)"},{"key":"3_CR23","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1080\/014461997373097","volume":"15","author":"ETT Wong","year":"1997","unstructured":"Wong, E.T.T., Norman, G.: Economic evaluation of materials planning systems for construction. Constr. Manage. Econ. 15, 39\u201347 (1997)","journal-title":"Constr. Manage. Econ."},{"key":"3_CR24","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1108\/09576060210411512","volume":"13","author":"FTS Chan","year":"2002","unstructured":"Chan, F.T.S.: Design of material handling equipment selection system: an integration of expert system with analytic hierarchy process approach. Integr. Manuf. Syst. 13, 58\u201368 (2002)","journal-title":"Integr. Manuf. Syst."},{"key":"3_CR25","first-page":"43","volume":"1","author":"SCW Kong","year":"2001","unstructured":"Kong, S.C.W., Li, H.: An e-commerce system for construction material procurement. Constr. Innovation 1, 43\u201354 (2001)","journal-title":"Constr. Innovation"},{"key":"3_CR26","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1016\/S0926-5805(01)00063-2","volume":"2","author":"Z Chen","year":"2002","unstructured":"Chen, Z., Li, H., Wong, C.T.C.: An application of bar-code system for reducing construction wastes. Autom. Constr. 2, 521\u2013533 (2002)","journal-title":"Autom. Constr."},{"key":"3_CR27","doi-asserted-by":"crossref","DOI":"10.4324\/9780203645239","volume-title":"Understanding IT in Construction","author":"M Sun","year":"2004","unstructured":"Sun, M., Howard, R.: Understanding IT in Construction. Spoon Press, London (2004)"},{"key":"3_CR28","unstructured":"Kasim, N.B., Ern, P.A.S.: The awareness of ICT implementation for materials management. in construction projects. Int. J. Comput. Commun. Technol. 2(1), 1\u201310 (2013)"},{"key":"3_CR29","unstructured":"Ptak, C.A., Schragenheim, E.: ERP: Tools, Techniques, and Applications for Integrating the Supply Chain. St. Lucie Press, Boca Raton (2000)"},{"issue":"4","key":"3_CR30","first-page":"925","volume":"2","author":"FH Nweke","year":"2015","unstructured":"Nweke, F.H., Ugwu, E.G., Ikegwu, C.A.: Design of project activities tracking system for enhanced project management in Nigeria. Int. J. Res. (IJR) 2(4), 925\u2013937 (2015)","journal-title":"Int. J. Res. (IJR)"},{"key":"3_CR31","unstructured":"Olalusi, O.C., Jesuloluwa, O.: The impact of information technology on Nigerian construction industry. Int. J. Eng. Innovative Technol. 2(9), 1\u20135 (2013)"}],"container-title":["Advances in Intelligent Systems and Computing","Recent Advances in Information Systems and Technologies"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-56538-5_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,20]],"date-time":"2019-09-20T03:17:45Z","timestamp":1568949465000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-56538-5_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319565378","9783319565385"],"references-count":31,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-56538-5_3","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2017]]}}}