{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T13:34:21Z","timestamp":1725888861289},"publisher-location":"Cham","reference-count":7,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319594149"},{"type":"electronic","value":"9783319594156"}],"license":[{"start":{"date-parts":[[2017,5,31]],"date-time":"2017-05-31T00:00:00Z","timestamp":1496188800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-59415-6_11","type":"book-chapter","created":{"date-parts":[[2017,5,30]],"date-time":"2017-05-30T08:42:30Z","timestamp":1496133750000},"page":"106-117","source":"Crossref","is-referenced-by-count":0,"title":["Maintenance of Wind Turbine Scheduling Based on Output Power Data and Wind Forecast"],"prefix":"10.1007","author":[{"given":"Guglielmo","family":"D\u2019Amico","sequence":"first","affiliation":[]},{"given":"Filippo","family":"Petroni","sequence":"additional","affiliation":[]},{"given":"Robert Adam","family":"Sobolewski","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,5,31]]},"reference":[{"key":"11_CR1","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1002\/we.1850","volume":"19","author":"D Pattison","year":"2016","unstructured":"Pattison, D., Segovia Garcia, M., Xie, W., Revie, M., Whitfield, R.I., Irvine, I.: Intelligent integrated maintenance for wind power generation. Wind Energ. 19, 547\u2013562 (2016)","journal-title":"Wind Energ."},{"issue":"7","key":"11_CR2","doi-asserted-by":"crossref","first-page":"766","DOI":"10.1049\/iet-rpg.2014.0260","volume":"9","author":"B Kerres","year":"2015","unstructured":"Kerres, B., Fischer, K., Madlener, R.: Economic evaluation of maintenance strategies for wind turbines: a stochastic analysis. IET Renew. Power Gener. 9(7), 766\u2013774 (2015)","journal-title":"IET Renew. Power Gener."},{"key":"11_CR3","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/j.egypro.2016.09.234","volume":"94","author":"IB Sperstad","year":"2016","unstructured":"Sperstad, I.B., McAuliffe, F.D., Kolstad, M., Sjomark, S.: Investigating key decision problems to optimize the operation and maintenance strategy of offshore wind farms. Energ. Procedia 94, 261\u2013268 (2016)","journal-title":"Energ. Procedia"},{"key":"11_CR4","doi-asserted-by":"crossref","DOI":"10.1007\/978-0-387-74101-7","volume-title":"Bayesian Networks and Influence Diagrams: A Guide to Construction and Analysis","author":"UB Kjaerulff","year":"2008","unstructured":"Kjaerulff, U.B., Madsen, A.L.: Bayesian Networks and Influence Diagrams: A Guide to Construction and Analysis. Springer, New York (2008)"},{"issue":"5","key":"11_CR5","doi-asserted-by":"crossref","first-page":"1194","DOI":"10.1016\/j.physa.2012.11.022","volume":"392","author":"G D\u2019Amico","year":"2013","unstructured":"D\u2019Amico, G., Petroni, F., Prattico, F.: First and second order semi-Markov chains for wind speedmodeling. Phys. A 392(5), 1194\u20131201 (2013)","journal-title":"Phys. A"},{"key":"11_CR6","first-page":"6","volume":"2013","author":"G D\u2019Amico","year":"2013","unstructured":"D\u2019Amico, G., Petroni, F., Prattico, F.: Reliability measures of second order semi-Markov chain with application to wind energy production. J. Renew. Energ. 2013, 6 (2013). (368940)","journal-title":"J. Renew. Energ."},{"key":"11_CR7","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1007\/s11009-013-9394-z","volume":"17","author":"G D\u2019Amico","year":"2015","unstructured":"D\u2019Amico, G., Petroni, F., Prattico, F.: Performance analysis of second order semi-markov chains: an application to wind energy production. Methodol. Comput. Appl. Probab. 17, 781\u2013794 (2015)","journal-title":"Methodol. Comput. Appl. Probab."}],"container-title":["Advances in Intelligent Systems and Computing","Advances in Dependability Engineering of Complex Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-59415-6_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,5,30]],"date-time":"2017-05-30T08:44:59Z","timestamp":1496133899000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-59415-6_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,5,31]]},"ISBN":["9783319594149","9783319594156"],"references-count":7,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-59415-6_11","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2017,5,31]]}}}