{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,23]],"date-time":"2025-04-23T14:08:05Z","timestamp":1745417285248},"publisher-location":"Cham","reference-count":10,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319597393"},{"type":"electronic","value":"9783319597409"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-59740-9_16","type":"book-chapter","created":{"date-parts":[[2017,5,26]],"date-time":"2017-05-26T09:23:41Z","timestamp":1495790621000},"page":"160-169","source":"Crossref","is-referenced-by-count":4,"title":["Genetic Algorithm for Scheduling Charging Times of Electric Vehicles Subject to Time Dependent Power Availability"],"prefix":"10.1007","author":[{"given":"Carlos","family":"Menc\u00eda","sequence":"first","affiliation":[]},{"given":"Mar\u00eda R.","family":"Sierra","sequence":"additional","affiliation":[]},{"given":"Ra\u00fal","family":"Menc\u00eda","sequence":"additional","affiliation":[]},{"given":"Ramiro","family":"Varela","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,5,27]]},"reference":[{"key":"16_CR1","unstructured":"Ahn, S., Lee, S., Bahn, H.: A smart elevator scheduler that considers dynamic changes of energy cost and user traffic. Integr. Comput.-Aided Eng. (on-line first) 24(2), 187\u2013202 (2017)"},{"key":"16_CR2","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1007\/s10951-008-0067-7","volume":"11","author":"E Balas","year":"2008","unstructured":"Balas, E., Simonetti, N., Vazacopoulos, A.: Job shop scheduling with setup times, deadlines and precedence constraints. J. Sched. 11, 253\u2013262 (2008)","journal-title":"J. Sched."},{"key":"16_CR3","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/S0377-2217(82)80007-6","volume":"11","author":"J Carlier","year":"1982","unstructured":"Carlier, J.: The one-machine sequencing problem. Eur. J. Oper. Res. 11, 42\u201347 (1982)","journal-title":"Eur. J. Oper. Res."},{"key":"16_CR4","unstructured":"Davis, L.: Applying adaptive algorithms to epistatic domains. In: IJCAI, pp. 162\u2013164 (1985). \nhttp:\/\/ijcai.org\/Proceedings\/85-1\/Papers\/029.pdf"},{"key":"16_CR5","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R Graham","year":"1979","unstructured":"Graham, R., Lawler, E., Lenstra, J., Kan, A.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287\u2013326 (1979)","journal-title":"Ann. Discret. Math."},{"key":"16_CR6","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/j.cie.2015.04.002","volume":"85","author":"A Hern\u00e1ndez-Arauzo","year":"2015","unstructured":"Hern\u00e1ndez-Arauzo, A., Puente, J., Varela, R., Sedano, J.: Electric vehicle charging under power and balance constraints as dynamic scheduling. Comput. Ind. Eng. 85, 306\u2013315 (2015)","journal-title":"Comput. Ind. Eng."},{"key":"16_CR7","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1287\/opre.42.6.1025","volume":"42","author":"C Koulamas","year":"1994","unstructured":"Koulamas, C.: The total tardiness problem: review and extensions. Oper. Res. 42, 1025\u20131041 (1994)","journal-title":"Oper. Res."},{"issue":"2","key":"16_CR8","doi-asserted-by":"crossref","first-page":"161","DOI":"10.3233\/ICA-150508","volume":"23","author":"C Kyriklidis","year":"2016","unstructured":"Kyriklidis, C., Dounias, G.: Evolutionary computation for resource leveling optimization in project management. Integr. Comput.-Aided Eng. 23(2), 161\u2013172 (2016)","journal-title":"Integr. Comput.-Aided Eng."},{"issue":"3","key":"16_CR9","doi-asserted-by":"crossref","first-page":"269","DOI":"10.3233\/ICA-160519","volume":"23","author":"R Menc\u00eda","year":"2016","unstructured":"Menc\u00eda, R., Sierra, M.R., Menc\u00eda, C., Varela, R.: Genetic algorithms for the scheduling problem with arbitrary precedence relations and skilled operators. Integr. Comput.-Aided Eng. 23(3), 269\u2013285 (2016)","journal-title":"Integr. Comput.-Aided Eng."},{"issue":"6","key":"16_CR10","doi-asserted-by":"crossref","first-page":"640","DOI":"10.6036\/5788","volume":"88","author":"J Sedano","year":"2013","unstructured":"Sedano, J., Portal, M., Hern\u00e1ndez-Arauzo, A., Villar, J.R., Puente, J., Varela, R.: Intelligent system for electric vehicle charging: design and operation. DYNA 88(6), 640\u2013647 (2013)","journal-title":"DYNA"}],"container-title":["Lecture Notes in Computer Science","Natural and Artificial Computation for Biomedicine and Neuroscience"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-59740-9_16","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,5,26]],"date-time":"2017-05-26T09:29:10Z","timestamp":1495790950000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-59740-9_16"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319597393","9783319597409"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-59740-9_16","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]}}}