{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T13:39:31Z","timestamp":1725889171365},"publisher-location":"Cham","reference-count":8,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319600413"},{"type":"electronic","value":"9783319600420"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-60042-0_14","type":"book-chapter","created":{"date-parts":[[2017,6,3]],"date-time":"2017-06-03T08:32:44Z","timestamp":1496478764000},"page":"124-130","source":"Crossref","is-referenced-by-count":0,"title":["FJS Problem Under Machine Breakdowns"],"prefix":"10.1007","author":[{"given":"Rim","family":"Zarrouk","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Imed","family":"Bennour","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abderrazak","family":"Jemai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abdelghani","family":"Bekrar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,6,4]]},"reference":[{"key":"14_CR1","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1016\/j.ijpe.2011.04.020","volume":"132","author":"A-H Nasr","year":"2011","unstructured":"Nasr, A.-H., El Mekkawy, T.Y.: Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm. Int. J. Prod. Economics 132, 279\u2013291 (2011)","journal-title":"Int. J. Prod. Economics"},{"key":"14_CR2","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.ijpe.2012.04.015","volume":"141","author":"J Xiong","year":"2013","unstructured":"Xiong, J., Xing, L., Chen, Y.: Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns. Int. J. Prod. Economics 141, 112\u2013126 (2013)","journal-title":"Int. J. Prod. Economics"},{"issue":"1","key":"14_CR3","first-page":"1","volume":"20","author":"MR Singh","year":"2015","unstructured":"Singh, M.R., Mahapatra, S.S.: Robust scheduling for flexible job shop problems with random machine breakdowns using a quantum behaved particle swarm optimization. Int. J. Serv. Oper. Manage. 20(1), 1\u201320 (2015)","journal-title":"Int. J. Serv. Oper. Manage."},{"key":"14_CR4","doi-asserted-by":"crossref","first-page":"501","DOI":"10.1007\/s00170-012-4344-4","volume":"66","author":"W He","year":"2012","unstructured":"He, W., Sun, D.: Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies. Int. J. Adv. Manuf. Technol. 66, 501\u2013514 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"13","key":"14_CR5","first-page":"3858","volume":"52","author":"W He","year":"2013","unstructured":"He, W., Sun, D.: Scheduling flexible job shop problem subject to machine breakdown with game theory. Int. J. Prod. Res. 52(13), 3858\u20133876 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"14_CR6","doi-asserted-by":"crossref","unstructured":"Yahyaoui, A., Fnaiech, N., Fnaiech, F.: New shifting method for job shop scheduling subject to invariant constraints of resources availability. In: 35th Annual Conference of IEEE Industrial Electronics, pp. 3211\u20133216 (2009)","DOI":"10.1109\/IECON.2009.5415368"},{"issue":"7","key":"14_CR7","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1016\/j.engappai.2010.05.003","volume":"23","author":"H Modares","year":"2010","unstructured":"Modares, H., Alfi, A., Sistani, M.B.N.: Parameter estimation of bilinear systems based on an adaptive particle swarm optimization. Eng. Appl. Artif. Intell. 23(7), 1105\u20131111 (2010)","journal-title":"Eng. Appl. Artif. Intell."},{"issue":"1","key":"14_CR8","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.ijpe.2012.04.015","volume":"141","author":"J Xiong","year":"2013","unstructured":"Xiong, J., Xing, L.N., Chen, Y.W.: Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns. Int. J. Prod. Economics 141(1), 112\u2013126 (2013)","journal-title":"Int. J. Prod. Economics"}],"container-title":["Lecture Notes in Computer Science","Advances in Artificial Intelligence: From Theory to Practice"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-60042-0_14","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,3]],"date-time":"2017-06-03T08:36:16Z","timestamp":1496478976000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-60042-0_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319600413","9783319600420"],"references-count":8,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-60042-0_14","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]}}}