{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T00:29:53Z","timestamp":1743035393679,"version":"3.40.3"},"publisher-location":"Cham","reference-count":25,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319624334"},{"type":"electronic","value":"9783319624341"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-62434-1_31","type":"book-chapter","created":{"date-parts":[[2017,8,1]],"date-time":"2017-08-01T23:54:19Z","timestamp":1501631659000},"page":"379-390","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A Multi-objective Hospital Operating Room Planning and Scheduling Problem Using Compromise Programming"],"prefix":"10.1007","author":[{"given":"Alejandra","family":"Duenas","sequence":"first","affiliation":[]},{"given":"Christine","family":"Di Martinelly","sequence":"additional","affiliation":[]},{"given":"G.","family":"Yazg\u0131 T\u00fct\u00fcnc\u00fc","sequence":"additional","affiliation":[]},{"given":"Joaquin","family":"Aguado","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,8,3]]},"reference":[{"issue":"2","key":"31_CR1","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1097\/00000542-200608000-00004","volume":"105","author":"A Macario","year":"2006","unstructured":"Macario, A.: Are your hospital operating rooms \u201cefficient\u201d? A scoring system with eight performance indicators. Anesthesiology 105(2), 237\u2013240 (2006)","journal-title":"Anesthesiology"},{"issue":"2","key":"31_CR2","doi-asserted-by":"publisher","first-page":"1185","DOI":"10.1016\/j.ejor.2005.06.063","volume":"176","author":"J Beli\u00ebn","year":"2007","unstructured":"Beli\u00ebn, J., Demeulemeester, E.: Building cyclic master surgery schedules with leveled resulting bed occupancy. Eur. J. Oper. Res. 176(2), 1185\u20131204 (2007)","journal-title":"Eur. J. Oper. Res."},{"issue":"1\u20132","key":"31_CR3","doi-asserted-by":"publisher","first-page":"52","DOI":"10.1016\/j.ijpe.2004.12.006","volume":"99","author":"A Jebali","year":"2006","unstructured":"Jebali, A., Alouane, A.B.H., Ladet, P.: Operating rooms scheduling. Int. J. Prod. Econ. 99(1\u20132), 52\u201362 (2006)","journal-title":"Int. J. Prod. Econ."},{"key":"31_CR4","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1016\/S0925-5273(03)00087-2","volume":"85","author":"A Guinet","year":"2003","unstructured":"Guinet, A., Chaabane, S.: Operating theatre planning. Int. J. Prod. Econ. 85, 69\u201381 (2003)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"31_CR5","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1007\/s10479-008-0413-3","volume":"166","author":"H Fei","year":"2009","unstructured":"Fei, H., Chu, C., Meskens, N.: Solving a tactical operating room planning problem by a column-generation-based heuristic procedure with four criteria. Ann. Oper. Res. 166(1), 91\u2013108 (2009)","journal-title":"Ann. Oper. Res."},{"issue":"3","key":"31_CR6","doi-asserted-by":"publisher","first-page":"1026","DOI":"10.1016\/j.ejor.2006.02.057","volume":"185","author":"M Lamiri","year":"2008","unstructured":"Lamiri, M., et al.: A stochastic model for operating room planning with elective and emergency demand for surgery. Eur. J. Oper. Res. 185(3), 1026\u20131037 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"5","key":"31_CR7","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1007\/s10916-006-9012-5","volume":"30","author":"J Beli\u00ebn","year":"2006","unstructured":"Beli\u00ebn, J., Demeulemeester, E., Cardoen, B.: Visualizing the demand for various resources as a function of the master surgery schedule: a case study. J. Med. Syst. 30(5), 343\u2013350 (2006)","journal-title":"J. Med. Syst."},{"key":"31_CR8","unstructured":"Di Martinelly, C., Baptiste, P., Maknoon, Y.: Evaluation de l\u2019impact de l\u2019int\u00e9gration de la conception d\u2019horaires infirmiers sur la programmation op\u00e9ratoire in 9e Congr\u00e8s International de G\u00e9nie Industriel. Saint-Sauveur, Canada (2011)"},{"issue":"2","key":"31_CR9","doi-asserted-by":"publisher","first-page":"212","DOI":"10.1016\/j.cie.2009.01.005","volume":"58","author":"B Roland","year":"2010","unstructured":"Roland, B., et al.: Scheduling an operating theatre under human resource constraints. Comput. Ind. Eng. 58(2), 212\u2013220 (2010)","journal-title":"Comput. Ind. Eng."},{"issue":"9","key":"31_CR10","doi-asserted-by":"publisher","first-page":"884","DOI":"10.1057\/palgrave.jors.2600441","volume":"48","author":"D Sier","year":"1997","unstructured":"Sier, D., Tobin, P., McGurk, C.: Scheduling surgical procedures. J. Oper. Res. Soc. 48(9), 884\u2013891 (1997)","journal-title":"J. Oper. Res. Soc."},{"issue":"2","key":"31_CR11","doi-asserted-by":"publisher","first-page":"354","DOI":"10.1016\/j.ijpe.2009.03.009","volume":"119","author":"B Cardoen","year":"2009","unstructured":"Cardoen, B., Demeulemeester, E., Beli\u00ebn, J.: Optimizing a multiple objective surgical case sequencing problem. Int. J. Prod. Econ. 119(2), 354\u2013366 (2009)","journal-title":"Int. J. Prod. Econ."},{"key":"31_CR12","doi-asserted-by":"publisher","first-page":"650","DOI":"10.1016\/j.dss.2012.10.019","volume":"55","author":"N Meskens","year":"2012","unstructured":"Meskens, N., Duvivier, D., Hanset, A.: Multi-objective operating room scheduling considering desiderata of the surgical team. Decis. Support Syst. 55, 650\u2013659 (2012)","journal-title":"Decis. Support Syst."},{"issue":"3","key":"31_CR13","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1007\/BF00940069","volume":"68","author":"W-S Shin","year":"1991","unstructured":"Shin, W.-S., Ravindran, A.: An interactive method for multiple-objective mathematical programming problems. J. Optim. Theory Appl. 68(3), 539\u2013561 (1991)","journal-title":"J. Optim. Theory Appl."},{"key":"31_CR14","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-27659-9","volume-title":"Multicriteria Optimization","author":"M Ehrgott","year":"2005","unstructured":"Ehrgott, M.: Multicriteria Optimization, 2nd edn. Springer, Heidelberg (2005). doi:\n                      10.1007\/3-540-27659-9","edition":"2"},{"issue":"1","key":"31_CR15","first-page":"53","volume":"171","author":"G Mavrotas","year":"2005","unstructured":"Mavrotas, G., Diakoulaki, D.: Multi-criteria branch and bound: a vector maximization algorithm for mixed 0-1 multiple objective linear programming. Appl. Math. Comput. 171(1), 53\u201371 (2005)","journal-title":"Appl. Math. Comput."},{"issue":"3","key":"31_CR16","doi-asserted-by":"publisher","first-page":"909","DOI":"10.1016\/j.ejor.2004.07.052","volume":"170","author":"K Miettinen","year":"2006","unstructured":"Miettinen, K., M\u00e4kel\u00e4, M.M.: Synchronous approach in interactive multiobjective optimization. Eur. J. Oper. Res. 170(3), 909\u2013922 (2006)","journal-title":"Eur. J. Oper. Res."},{"key":"31_CR17","first-page":"262","volume-title":"Multiple Criteria Decision Making","author":"M Zeleny","year":"1973","unstructured":"Zeleny, M.: Compromise programming. In: Cochrane, J., Zeleny, M. (eds.) Multiple Criteria Decision Making, pp. 262\u2013301. University of South Carolina Press, Columbia (1973)"},{"key":"31_CR18","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-45511-7","volume-title":"Multiple Objective Decision Making, Methods and Applications: A State-of-the-Art Survey","author":"CL Hwang","year":"1979","unstructured":"Hwang, C.L., Masud, A.S.M., Paidy, S.R.: Multiple Objective Decision Making, Methods and Applications: A State-of-the-Art Survey. Springer, Heidelberg (1979). doi:\n                      10.1007\/978-3-642-45511-7"},{"key":"31_CR19","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1109\/TAC.1963.1105511","volume":"AC-8","author":"L Zadeh","year":"1963","unstructured":"Zadeh, L.: Optimality and non-scalar-valued performance criteria. IEEE Trans. Autom. Control AC-8, 59\u201360 (1963)","journal-title":"IEEE Trans. Autom. Control"},{"key":"31_CR20","volume-title":"Multiobjective Programming and Planning","author":"JL Cohon","year":"1978","unstructured":"Cohon, J.L.: Multiobjective Programming and Planning. Academic Press, New York (1978)"},{"issue":"2","key":"31_CR21","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1057\/jors.1987.28","volume":"38","author":"E Ramazan","year":"1987","unstructured":"Ramazan, E.: Interactive compromise programming. J. Oper. Res. Soc. 38(2), 163\u2013172 (1987)","journal-title":"J. Oper. Res. Soc."},{"issue":"5","key":"31_CR22","doi-asserted-by":"publisher","first-page":"1179","DOI":"10.1111\/j.1752-1688.2006.tb05605.x","volume":"42","author":"JT Shiau","year":"2006","unstructured":"Shiau, J.T., Wu, F.C.: Compromise programming methodology for determining instream flow under muliobjective water allocation criteria. J. Am. Water Resour. Assoc. 42(5), 1179\u20131191 (2006)","journal-title":"J. Am. Water Resour. Assoc."},{"key":"31_CR23","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0377-2217(93)90318-H","volume":"67","author":"M Weber","year":"1993","unstructured":"Weber, M., Borcherding, K.: Behavioral influences on weight judgments in multiattribute decision making. Eur. J. Oper. Res. 67, 1\u201312 (1993)","journal-title":"Eur. J. Oper. Res."},{"key":"31_CR24","volume-title":"Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process","author":"TL Saaty","year":"1994","unstructured":"Saaty, T.L.: Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process. RWS Publications, Pittsburgh (1994)"},{"issue":"4","key":"31_CR25","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1093\/imaman\/dpn033","volume":"20","author":"A Duenas","year":"2009","unstructured":"Duenas, A., Tutuncu, G.Y., Chilcott, J.B.: A genetic algorithm approach to the nurse scheduling problem with fuzzy preferences. IMA J. Manage. Math. 20(4), 369\u2013383 (2009)","journal-title":"IMA J. Manage. Math."}],"container-title":["Lecture Notes in Computer Science","Advances in Computational Intelligence"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-62434-1_31","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,20]],"date-time":"2019-05-20T02:40:02Z","timestamp":1558320002000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-62434-1_31"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319624334","9783319624341"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-62434-1_31","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]},"assertion":[{"value":"3 August 2017","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"MICAI","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Mexican International Conference on Artificial Intelligence","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Canc\u00fan","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Mexico","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2016","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"23 October 2016","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"29 October 2016","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"15","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"micai2016","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.micai.org\/2016\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}