{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T18:06:11Z","timestamp":1725905171430},"publisher-location":"Cham","reference-count":19,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319633084"},{"type":"electronic","value":"9783319633091"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-63309-1_51","type":"book-chapter","created":{"date-parts":[[2017,7,19]],"date-time":"2017-07-19T10:09:09Z","timestamp":1500458949000},"page":"577-586","source":"Crossref","is-referenced-by-count":2,"title":["Minimization of Makespan Through Jointly Scheduling Strategy in Production System with Mould Maintenance Consideration"],"prefix":"10.1007","author":[{"given":"Xiaoyue","family":"Fu","sequence":"first","affiliation":[]},{"given":"Felix T. S.","family":"Chan","sequence":"additional","affiliation":[]},{"given":"Ben","family":"Niu","sequence":"additional","affiliation":[]},{"given":"S. H.","family":"Chung","sequence":"additional","affiliation":[]},{"given":"Ying","family":"Bi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,7,20]]},"reference":[{"issue":"22","key":"51_CR1","doi-asserted-by":"crossref","first-page":"6821","DOI":"10.1080\/00207540903308969","volume":"48","author":"M Rajkumar","year":"2010","unstructured":"Rajkumar, M., Asokan, P., Vamsikrishna, V.: A GRASP algorithm for flexible job-shop scheduling with maintenance constraints. Int. J. Prod. Res. 48(22), 6821\u20136836 (2010)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"51_CR2","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/s10845-008-0113-5","volume":"20","author":"A Berrichi","year":"2008","unstructured":"Berrichi, A., Amodeo, L., Yalaoui, F., Chatelet, E., Mezghiche, M.: Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J. Intell. Manuf. 20(4), 389\u2013400 (2008)","journal-title":"J. Intell. Manuf."},{"issue":"56","key":"51_CR3","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1016\/j.rcim.2005.11.005","volume":"22","author":"TS Chan","year":"2006","unstructured":"Chan, T.S., Chan, L.Y., Chung, S.H., Finke, G., Timari, M.K.: Solving distributed FMS scheduling problems subject to maintenance: genetic algorithms approach. Robot. Comput. Integr. Manuf. 22(56), 493\u2013504 (2006)","journal-title":"Robot. Comput. Integr. Manuf."},{"issue":"6","key":"51_CR4","doi-asserted-by":"crossref","first-page":"10188","DOI":"10.1016\/j.eswa.2008.12.014","volume":"36","author":"SH Chung","year":"2009","unstructured":"Chung, S.H., Lau, H.C.W., Ho, G.T.S., Ip, W.H.: Optimization of system reliability in multi-factory production networks by maintenance approach. Expert Syst. Appl. 36(6), 10188\u201310196 (2009)","journal-title":"Expert Syst. Appl."},{"key":"51_CR5","doi-asserted-by":"crossref","DOI":"10.3139\/9783446401808","volume-title":"How to make Injection Moulds","author":"G Menges","year":"2001","unstructured":"Menges, G., Michaeli, W., Mohren, P.: How to make Injection Moulds, 3rd edn. Hanser Publishers, Munich (2001)","edition":"3"},{"issue":"20","key":"51_CR6","doi-asserted-by":"crossref","first-page":"5683","DOI":"10.1080\/00207543.2011.613868","volume":"50","author":"CS Wong","year":"2011","unstructured":"Wong, C.S., Chan, F.T.S., Chung, S.H.: A genetic algorithm approach for production scheduling with mould maintenance consideration. Int. J. Prod. Res. 50(20), 5683\u20135697 (2011)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"51_CR7","doi-asserted-by":"crossref","first-page":"883","DOI":"10.1080\/00207543.2012.677070","volume":"51","author":"CS Wong","year":"2013","unstructured":"Wong, C.S., Chan, F.T.S., Chung, S.H.: A joint production scheduling approach considering multiple resources and preventive maintenance tasks. Int. J. Prod. Res. 51(3), 883\u2013896 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"51_CR8","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1007\/978-3-319-22186-1_73","volume-title":"Intelligent Computing Theories and Methodologies","author":"B Niu","year":"2015","unstructured":"Niu, B., Bi, Y., Chan, F.T.S., Wang, Z.X.: SRBFO algorithm for production scheduling with mold and machine maintenance consideration. In: Huang, D.-S., Jo, K.-H., Hussain, A. (eds.) ICIC 2015. LNCS, vol. 9226, pp. 733\u2013741. Springer, Cham (2015). doi:\n10.1007\/978-3-319-22186-1_73"},{"doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R.C.: Particle swarm optimization. In: Proceedings of IEEE International Conference on Neural Networks, Piscataway, NJ, USA, vol. 4, pp. 1942\u20131948 (1995)","key":"51_CR9","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"3","key":"51_CR10","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1007\/s10845-014-0906-7","volume":"27","author":"A Abdelhakim","year":"2016","unstructured":"Abdelhakim, A., Brahim, B., Mourad, B.: Branch-and-bound and PSO algorithms for no-wait job shop scheduling. J. Intell. Manuf. 27(3), 679\u2013688 (2016)","journal-title":"J. Intell. Manuf."},{"issue":"14","key":"51_CR11","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1007\/s00170-011-3294-6","volume":"57","author":"LL Liu","year":"2011","unstructured":"Liu, L.L., Zhao, G.P., Ou\u2019Yang, S.S., Yang, Y.J.: Integrating theory of constraints and particle swarm optimization in order planning and scheduling for machine tool production. Int. J. Adv. Manuf. Tech. 57(14), 285\u2013296 (2011)","journal-title":"Int. J. Adv. Manuf. Tech."},{"issue":"9","key":"51_CR12","doi-asserted-by":"crossref","first-page":"2885","DOI":"10.1007\/s00170-012-4701-3","volume":"67","author":"XY Shao","year":"2013","unstructured":"Shao, X.Y., Liu, W.Q., Liu, Q., Zhang, C.Y.: Hybrid discrete particle swarm optimization for multi-objective flexible job-shop scheduling problem. Int. J. Adv. Manuf. Tech. 67(9), 2885\u20132901 (2013)","journal-title":"Int. J. Adv. Manuf. Tech."},{"key":"51_CR13","volume-title":"Adaptation in Natural and Artificial Systems","author":"JH Holland","year":"1975","unstructured":"Holland, J.H.: Adaptation in Natural and Artificial Systems. University of Michigan Press, Ann Arbor (1975)"},{"issue":"12","key":"51_CR14","doi-asserted-by":"crossref","first-page":"3585","DOI":"10.1080\/00207543.2010.481293","volume":"49","author":"ZY Jia","year":"2011","unstructured":"Jia, Z.Y., Lu, X.H., Yang, J.Y., Jia, D.F.: Research on job-shop scheduling problem based on genetic algorithm. Int. J. Prod. Res. 49(12), 3585\u20133604 (2011)","journal-title":"Int. J. Prod. Res."},{"key":"51_CR15","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.ijpe.2016.01.016","volume":"174","author":"XY Li","year":"2016","unstructured":"Li, X.Y., Gao, L.: An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem. Int. J. Prod. Eco. 174, 93\u2013110 (2016)","journal-title":"Int. J. Prod. Eco."},{"issue":"7","key":"51_CR16","doi-asserted-by":"crossref","first-page":"8703","DOI":"10.1016\/j.eswa.2011.01.078","volume":"38","author":"TSF Chan","year":"2011","unstructured":"Chan, T.S.F., Choy, K.L., Bibhushan, K.L.: A genetic algorithm-based scheduler for multiproduct parallel machine sheet metal job shop. Expert Syst. Appl. 38(7), 8703\u20138715 (2011)","journal-title":"Expert Syst. Appl."},{"issue":"5","key":"51_CR17","doi-asserted-by":"crossref","first-page":"882","DOI":"10.1057\/jors.2009.5","volume":"61","author":"G Mosheiov","year":"2010","unstructured":"Mosheiov, G., Sidney, J.B.: Scheduling a deteriorating maintenance activity on a single machine. J. Oper. Res. Soc. 61(5), 882\u2013887 (2010)","journal-title":"J. Oper. Res. Soc."},{"issue":"2","key":"51_CR18","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"JC Bean","year":"1994","unstructured":"Bean, J.C.: Genetic algorithms and random keys for sequencing and optimization. ORSA J. Comput. 6(2), 154\u2013160 (1994)","journal-title":"ORSA J. Comput."},{"issue":"3","key":"51_CR19","doi-asserted-by":"crossref","first-page":"1930","DOI":"10.1016\/j.ejor.2005.12.024","volume":"177","author":"MF Tasgetiren","year":"2007","unstructured":"Tasgetiren, M.F., Liang, Y.C., Sevkli, M., Gencyilmaz, G.: A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem. Eur. J. Oper. Res. 177(3), 1930\u20131947 (2007)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Lecture Notes in Computer Science","Intelligent Computing Theories and Application"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-63309-1_51","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,7,19]],"date-time":"2017-07-19T10:22:59Z","timestamp":1500459779000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-63309-1_51"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319633084","9783319633091"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-63309-1_51","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]}}}