{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T06:22:11Z","timestamp":1742970131079,"version":"3.40.3"},"publisher-location":"Cham","reference-count":31,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319646343"},{"type":"electronic","value":"9783319646350"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-64635-0_2","type":"book-chapter","created":{"date-parts":[[2017,7,31]],"date-time":"2017-07-31T04:22:56Z","timestamp":1501474976000},"page":"11-23","source":"Crossref","is-referenced-by-count":0,"title":["Total Setup Time Minimisation in Production Scheduling with Alternatives"],"prefix":"10.1007","author":[{"given":"Zden\u011bk","family":"Hanz\u00e1lek","sequence":"first","affiliation":[]},{"given":"Roman","family":"\u010capek","sequence":"additional","affiliation":[]},{"given":"P\u0159emysl","family":"\u0160\u016fcha","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,8,1]]},"reference":[{"issue":"3","key":"2_CR1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M.Y.: A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187(3), 985\u20131032 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"2_CR2","unstructured":"Bart\u00e1k, R., \u010cepek, O.: Temporal networks with alternatives: complexity and model. In: Proceedings of the Twentieth International Florida Artificial Intelligence Research Society Conference (FLAIRS), Florida, USA, pp. 641\u2013646. AAAI Press (2007)"},{"key":"2_CR3","doi-asserted-by":"crossref","unstructured":"Bart\u00e1k, R., \u010cepek, O.: Nested temporal networks with alternatives: recognition and tractability. In: Proceedings of the 2008 ACM Symposium on Applied Computing (SAC), Ceara, Brazil, pp. 156\u2013157. ACM (2008)","DOI":"10.1145\/1363686.1363729"},{"issue":"1","key":"2_CR4","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/S0004-3702(00)00035-7","volume":"121","author":"JC Beck","year":"2000","unstructured":"Beck, J.C., Fox, M.S.: Constraint-directed techniques for scheduling alternative activities. Artif. Intell. 121(1), 211\u2013250 (2000)","journal-title":"Artif. Intell."},{"key":"2_CR5","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-04363-9","volume-title":"Scheduling Computer and Manufacturing Processes","author":"J Blazewicz","year":"1996","unstructured":"Blazewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Weglarz, J.: Scheduling Computer and Manufacturing Processes. Springer, New York (1996). doi: 10.1007\/978-3-662-04363-9"},{"key":"2_CR6","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-69516-5","volume-title":"Scheduling Algorithms","author":"P Brucker","year":"2007","unstructured":"Brucker, P.: Scheduling Algorithms. Springer, New York (2007). doi: 10.1007\/978-3-540-69516-5"},{"issue":"1","key":"2_CR7","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., Mohring, R., Neumann, K., Pesch, E.: Resource-constrained project scheduling: notation, classification, models, and methods. Eur. J. Oper. Res. 112(1), 3\u201341 (1999)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"2_CR8","first-page":"219","volume":"63","author":"P Brucker","year":"1998","unstructured":"Brucker, P., Knust, S.: Complexity results for single-machine problems with positive finish-start time-lags. Computing 63(4), 219\u2013316 (1998)","journal-title":"Computing"},{"key":"2_CR9","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-29546-1","volume-title":"Complex Scheduling","author":"P Brucker","year":"2006","unstructured":"Brucker, P., Kunst, S.: Complex Scheduling. Springer, New York (2006). doi: 10.1007\/3-540-29546-1"},{"issue":"3","key":"2_CR10","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/BF01539706","volume":"18","author":"P Brucker","year":"1996","unstructured":"Brucker, P., Thiele, O.: A branch & bound method for the general-shop problem with sequence dependent setup-times. Oper. Res. Spectr. 18(3), 145\u2013161 (1996)","journal-title":"Oper. Res. Spectr."},{"issue":"2","key":"2_CR11","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1016\/j.ejor.2011.09.018","volume":"217","author":"R \u010capek","year":"2012","unstructured":"\u010capek, R., \u0160\u016fcha, P., Hanz\u00e1lek, Z.: Production scheduling with alternative process plans. Eur. J. Oper. Res. 217(2), 300\u2013311 (2012)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"2_CR12","doi-asserted-by":"crossref","first-page":"538","DOI":"10.1016\/S0377-2217(99)00151-4","volume":"119","author":"B Reyck De","year":"1999","unstructured":"De Reyck, B., Herroelen, W.: The multi-mode resource-constrained project scheduling problem with generalized precedence relations. Eur. J. Oper. Res. 119(2), 538\u2013556 (1999)","journal-title":"Eur. J. Oper. Res."},{"issue":"12","key":"2_CR13","doi-asserted-by":"crossref","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","volume":"38","author":"E Demeulemeester","year":"1992","unstructured":"Demeulemeester, E., Herroelen, W.: A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manage. Sci. 38(12), 1803\u20131818 (1992)","journal-title":"Manage. Sci."},{"key":"2_CR14","unstructured":"Focacci, F., Laborie, P., Nuijten, W.: Solving scheduling problems with setup times and alternative resources. In: Artificial Intelligence Planning Systems 2000 Proceedings (AIPS), pp. 1\u201310. AIPS (2000)"},{"issue":"1","key":"2_CR15","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207(1), 1\u201314 (2010)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"2_CR16","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W Herroelen","year":"1998","unstructured":"Herroelen, W., De Reyck, B., Demeulemeester, E.: Resource-constrained project scheduling: a survey of recent developments. Comput. Oper. Res. 25(4), 279\u2013302 (1998)","journal-title":"Comput. Oper. Res."},{"key":"2_CR17","first-page":"1","volume-title":"Handbook of Recent Advances in Project Scheduling","author":"W Herroelen","year":"1999","unstructured":"Herroelen, W., De Reyck, B., Demeulemeester, E.: A classification scheme for project scheduling. In: Weglarz, J. (ed.) Handbook of Recent Advances in Project Scheduling, pp. 1\u201326. Kluwer Academic Publishers, Dordrecht (1999)"},{"key":"2_CR18","doi-asserted-by":"crossref","unstructured":"Kadrou, Y., Najid, N.M.: A new heuristic to solve RCPSP with multiple execution modes and multi-skilled labor. In: Proceedings of the IMACS Multiconference on Computational Engineering in Systems Applications (CESA), pp. 1\u20138. IEEE (2006)","DOI":"10.1109\/CESA.2006.4281838"},{"issue":"2","key":"2_CR19","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1016\/S0377-2217(02)00828-7","volume":"151","author":"T Kis","year":"2003","unstructured":"Kis, T.: Job-shop scheduling with processing alternatives. Eur. J. Oper. Res. 151(2), 307\u2013322 (2003)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"2_CR20","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch, R., Hartmann, S.: Experimental investigation of heuristics for resource-constrained project scheduling: an update. Eur. J. Oper. Res. 174(1), 23\u201337 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"2_CR21","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R Kolisch","year":"2001","unstructured":"Kolisch, R., Padman, R.: An integrated survey of deterministic project scheduling. Omega Int. J. Manag. Sci. 29(3), 249\u2013272 (2001)","journal-title":"Omega Int. J. Manag. Sci."},{"issue":"1","key":"2_CR22","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1016\/j.cie.2009.09.003","volume":"59","author":"CW Leung","year":"2010","unstructured":"Leung, C.W., Wong, T.N., Maka, K.L., Fung, R.Y.K.: Integrated process planning and scheduling by an agent-based ant colony optimization. Comput. Ind. Eng. 59(1), 166\u2013180 (2010)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"2_CR23","doi-asserted-by":"crossref","first-page":"1256","DOI":"10.1016\/j.eswa.2009.06.014","volume":"37","author":"X Li","year":"2010","unstructured":"Li, X., Zhang, C., Gao, L., Li, W., Shao, X.: An agent-based approach for integrated process planning and scheduling. Expert Syst. Appl. 37(2), 1256\u20131264 (2010)","journal-title":"Expert Syst. Appl."},{"issue":"9\u201312","key":"2_CR24","first-page":"795","volume":"54","author":"M Mirabi","year":"2010","unstructured":"Mirabi, M.: A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs. Int. J. Adv. Manuf. Technol. 54(9\u201312), 795\u2013808 (2010)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"2_CR25","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project Scheduling with Time Windows and Scarce Resources","author":"K Neumann","year":"2003","unstructured":"Neumann, K., Schwindt, C., Zimmermann, J.: Project Scheduling with Time Windows and Scarce Resources. Springer, Heidelberg (2003). doi: 10.1007\/978-3-540-24800-2"},{"issue":"1","key":"2_CR26","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/S0377-2217(96)00219-6","volume":"102","author":"F Salewski","year":"1997","unstructured":"Salewski, F., Schirmer, A., Drexl, A.: Project scheduling under resource and mode identity constraints: model, complexity, methods and application. Eur. J. Oper. Res. 102(1), 88\u2013110 (1997)","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"2_CR27","doi-asserted-by":"crossref","first-page":"2082","DOI":"10.1016\/j.cor.2008.07.006","volume":"36","author":"X Shao","year":"2009","unstructured":"Shao, X., Li, X., Gao, L., Zhang, C.: Integration of process planning and scheduling - a modified genetic algorithm-based approach. Comput. Oper. Res. 36(6), 2082\u20132096 (2009)","journal-title":"Comput. Oper. Res."},{"key":"2_CR28","unstructured":"Van Peteghem, V., Vanhoucke, M.: An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. Technical report, Faculty of Economics and Business Adminstration (Ghent University) (2011)"},{"issue":"6","key":"2_CR29","doi-asserted-by":"crossref","first-page":"705","DOI":"10.1007\/s10732-010-9152-0","volume":"17","author":"V Peteghem Van","year":"2011","unstructured":"Van Peteghem, V., Vanhoucke, M.: Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. J. Heuristics 17(6), 705\u2013728 (2011)","journal-title":"J. Heuristics"},{"key":"2_CR30","doi-asserted-by":"crossref","unstructured":"Wang, L., Wang, M.: A hybrid algorithm for earliness-tardiness scheduling problem with sequence dependent setup time. In: Proceedings of the 36th Conference on Decision and Control, pp. 1219\u20131223. IEEE (1997)","DOI":"10.1109\/CDC.1997.657619"},{"key":"2_CR31","first-page":"1189","volume":"2","author":"XM Yuan","year":"2004","unstructured":"Yuan, X.M., Khoo, H.H., Spedding, T.A., Bainbridge, I., Taplin, D.M.R.: Minimizing total setup cost for a metal casting company. Winter Simul. Conf. 2, 1189\u20131194 (2004)","journal-title":"Winter Simul. Conf."}],"container-title":["Lecture Notes in Computer Science","Industrial Applications of Holonic and Multi-Agent Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-64635-0_2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,31]],"date-time":"2022-07-31T16:33:41Z","timestamp":1659285221000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-64635-0_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319646343","9783319646350"],"references-count":31,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-64635-0_2","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]}}}