{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,6]],"date-time":"2025-11-06T12:14:58Z","timestamp":1762431298309,"version":"3.40.3"},"publisher-location":"Cham","reference-count":9,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319646343"},{"type":"electronic","value":"9783319646350"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-64635-0_3","type":"book-chapter","created":{"date-parts":[[2017,7,31]],"date-time":"2017-07-31T00:22:56Z","timestamp":1501460576000},"page":"24-36","source":"Crossref","is-referenced-by-count":3,"title":["Agent-Based Shop Floor Scheduling"],"prefix":"10.1007","author":[{"given":"Martin","family":"Klima","sequence":"first","affiliation":[]},{"given":"Jan","family":"Gregor","sequence":"additional","affiliation":[]},{"given":"Ondrej","family":"Harcuba","sequence":"additional","affiliation":[]},{"given":"Vladimir","family":"Marik","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,8,1]]},"reference":[{"unstructured":"Java Agent DEvelopmpent Framework. \nhttp:\/\/jade.tilab.com\/","key":"3_CR1"},{"issue":"2","key":"3_CR2","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1287\/opre.8.2.219","volume":"8","author":"AS Manne","year":"1960","unstructured":"Manne, A.S.: On the job shop scheduling problem. Oper. Res. 8(2), 219\u2013223 (1960)","journal-title":"Oper. Res."},{"issue":"2","key":"3_CR3","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.engappai.2009.07.002","volume":"23","author":"LJ Zeballos","year":"2010","unstructured":"Zeballos, L.J., Quiroga, O.D., Henning, G.P.: A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations. Eng. Appl. Artif. Intell. 23(2), 229\u2013248 (2010)","journal-title":"Eng. Appl. Artif. Intell."},{"issue":"4","key":"3_CR4","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1287\/inte.18.4.84","volume":"18","author":"KN McKay","year":"1998","unstructured":"McKay, K.N., Safayeni, F.R., Buzacott, J.A.: Job shop scheduling theory: What is relevant? Interfaces 18(4), 84\u201390 (1998)","journal-title":"Interfaces"},{"doi-asserted-by":"crossref","unstructured":"McFarlane, D., Sarma, S., Chirn, J.L., Wong, C.Y., Ashton, K.: The intelligent product in manufacturing control and management. In: 15th Triennial World Congress, Barcelona, Spain, July 2002","key":"3_CR5","DOI":"10.3182\/20020721-6-ES-1901.00011"},{"key":"3_CR6","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1007\/978-3-642-40090-2_3","volume-title":"Industrial Applications of Holonic and Multi-Agent Systems","author":"C Morariu","year":"2013","unstructured":"Morariu, C., Morariu, O., Borangiu, T.: Advanced shop-floor scheduling with genetic algorithm for combined horizon optimization in holonic manufacturing systems. In: Ma\u0159\u00edk, V., Lastra, J.L.M., Skobelev, P. (eds.) HoloMAS 2013. LNCS, vol. 8062, pp. 25\u201336. Springer, Heidelberg (2013). doi:\n10.1007\/978-3-642-40090-2_3"},{"issue":"9","key":"3_CR7","doi-asserted-by":"crossref","first-page":"2433","DOI":"10.1080\/00207540701738052","volume":"46","author":"C Wang","year":"2008","unstructured":"Wang, C., Ghenniwa, H., Shen, W.: Real time distributed shop floor scheduling using an agent-based service-oriented architecture. Int. J. Prod. Res. 46(9), 2433\u20132452 (2008)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"3_CR8","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0278-6125(98)80077-0","volume":"17","author":"AD Baker","year":"1998","unstructured":"Baker, A.D.: A survey of factory control algorithms which can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull. J. Manuf. Syst. 17(4), 297\u2013320 (1998)","journal-title":"J. Manuf. Syst."},{"unstructured":"Choco Constraint Solver Web Site (2017). \nhttp:\/\/www.choco-solver.org\/","key":"3_CR9"}],"container-title":["Lecture Notes in Computer Science","Industrial Applications of Holonic and Multi-Agent Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-64635-0_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,7,31]],"date-time":"2017-07-31T08:23:34Z","timestamp":1501489414000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-64635-0_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319646343","9783319646350"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-64635-0_3","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2017]]}}}