{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,21]],"date-time":"2026-02-21T18:15:53Z","timestamp":1771697753655,"version":"3.50.1"},"publisher-location":"Cham","reference-count":29,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319669229","type":"print"},{"value":"9783319669236","type":"electronic"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-66923-6_18","type":"book-chapter","created":{"date-parts":[[2017,8,30]],"date-time":"2017-08-30T08:21:18Z","timestamp":1504081278000},"page":"151-158","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Optimal Scheduling for Automated Guided Vehicles (AGV) in Blocking Job-Shops"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4863-5000","authenticated-orcid":false,"given":"Jens","family":"Heger","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2929-954X","authenticated-orcid":false,"given":"Thomas","family":"Voss","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,8,31]]},"reference":[{"key":"18_CR1","unstructured":"Acatech Study: Industrie 4.0 Maturity Index. Managing the Digital Transformation of Companies (2017)"},{"key":"18_CR2","doi-asserted-by":"publisher","first-page":"653","DOI":"10.1080\/002075498193624","volume":"36","author":"MF Anwar","year":"1998","unstructured":"Anwar, M.F., Nagi, R.: Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies. Int. J. Prod. Res. 36, 653\u2013681 (1998). doi:10.1080\/002075498193624","journal-title":"Int. J. Prod. Res."},{"key":"18_CR3","unstructured":"Auffermann, C., Kamagaev, A. Dr., Nettstr\u00e4ter, A., ten Hompel, M. Prof. Dr., Alex, V. Prof. Dr., Verbeek, K. and Wolf, O.: Cyber Physical Systems in der Logistik. Clustermanagement. IKT,NRW, M\u00fclheim an der Ruhr (2013)"},{"key":"18_CR4","doi-asserted-by":"publisher","first-page":"4773","DOI":"10.1080\/00207543.2015.1087656","volume":"54","author":"OT Baruwa","year":"2016","unstructured":"Baruwa, O.T., Piera, M.A.: A coloured Petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 54, 4773\u20134792 (2016). doi:10.1080\/00207543.2015.1087656","journal-title":"Int. J. Prod. Res."},{"key":"18_CR5","doi-asserted-by":"publisher","first-page":"1058","DOI":"10.1287\/opre.43.6.1058","volume":"43","author":"\u00dc Bilge","year":"1995","unstructured":"Bilge, \u00dc., Ulusoy, G.: A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS. Oper. Res. 43, 1058\u20131070 (1995). doi:10.1287\/opre.43.6.1058","journal-title":"Oper. Res."},{"key":"18_CR6","doi-asserted-by":"publisher","unstructured":"Bouibede, K., Lakehal, M., Abdelhakim, A.I.: A Tabu Search for the Bicriteria Scheduling Problem of Job-Shop with Blocking (2016), doi:10.1109\/ISPS.2015.7244978","DOI":"10.1109\/ISPS.2015.7244978"},{"key":"18_CR7","doi-asserted-by":"publisher","first-page":"706","DOI":"10.1016\/j.ejor.2008.03.051","volume":"199","author":"A Caumond","year":"2009","unstructured":"Caumond, A., Lacomme, P., Moukrim, A., et al.: An MILP for scheduling problems in an FMS with one vehicle. Eur. J. Oper. Res. 199, 706\u2013722 (2009). doi:10.1016\/j.ejor.2008.03.051","journal-title":"Eur. J. Oper. Res."},{"key":"18_CR8","doi-asserted-by":"publisher","unstructured":"Dabah, A., Bendjoudi, A., El-Baz, D., et al.: GPU-based two level parallel B&B for the blocking job shop scheduling problem. In: 2016 IEEE International Parallel and Distributed Processing Symposium Workshops (IPDPSW), pp. 747\u2013755 (2016), doi:10.1109\/IPDPSW.2016.14","DOI":"10.1109\/IPDPSW.2016.14"},{"key":"18_CR9","unstructured":"Deroussi, L., Norre, S.: Simultaneous scheduling of machines and vehicles for the flexible job shop problem. In: International conference on metaheuristics and nature inspired computing, pp. 1\u20132 (2010)"},{"key":"18_CR10","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1007\/s10846-013-0003-8","volume":"77","author":"H Fazlollahtabar","year":"2015","unstructured":"Fazlollahtabar, H., Saidi-Mehrabad, M.: Methodologies to optimize automated guided vehicle scheduling and routing problems: a review study. J. Intell. Robot. Syst. 77, 525\u2013545 (2015). doi:10.1007\/s10846-013-0003-8","journal-title":"J. Intell. Robot. Syst."},{"key":"18_CR11","doi-asserted-by":"publisher","first-page":"252","DOI":"10.1108\/IR-12-2014-0437","volume":"42","author":"H Fazlollahtabar","year":"2015","unstructured":"Fazlollahtabar, H., Saidi-Mehrabad, M., Masehian, E.: Mathematical model for deadlock resolution in multiple AGV scheduling and routing network: a case study. Industrial Robot 42, 252\u2013263 (2015). doi:10.1108\/IR-12-2014-0437","journal-title":"Industrial Robot"},{"key":"18_CR12","volume-title":"AMPL: A Mathematical Programming Language","author":"R Fourer","year":"1993","unstructured":"Fourer, R., Gay, D.M., Kernighan, B.: AMPL: A Mathematical Programming Language. Boyd & Fraser, Danvers (1993)"},{"key":"18_CR13","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., et al.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5, 287\u2013326 (1979). doi:10.1016\/S0167-5060(08)70356-X","journal-title":"Ann. Discrete Math."},{"key":"18_CR14","doi-asserted-by":"publisher","first-page":"3643","DOI":"10.1016\/j.dam.2009.02.020","volume":"157","author":"H Gr\u00f6flin","year":"2009","unstructured":"Gr\u00f6flin, H., Klinkert, A.: A new neighborhood and tabu search for the blocking job shop. Discrete App. Math. 157, 3643\u20133655 (2009). doi:10.1016\/j.dam.2009.02.020","journal-title":"Discrete App. Math."},{"key":"18_CR15","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1007\/s10878-009-9278-x","volume":"22","author":"H Gr\u00f6flin","year":"2011","unstructured":"Gr\u00f6flin, H., Pham, D.N., B\u00fcrgy, R.: The flexible blocking job shop with transfer and set-up times. J. Comb. Optim. 22, 121\u2013144 (2011). doi:10.1007\/s10878-009-9278-x","journal-title":"J. Comb. Optim."},{"key":"18_CR16","unstructured":"Gurobi Optimization, I.: Gurobi Optimizer Reference Manual (2016). http:\/\/www.gurobi.com"},{"key":"18_CR17","doi-asserted-by":"publisher","first-page":"6812","DOI":"10.1080\/00207543.2016.1178406","volume":"54","author":"J Heger","year":"2016","unstructured":"Heger, J., Branke, J., Hildebrandt, T., et al.: Dynamic adjustment of dispatching rule parameters in flow shops with sequence-dependent set-up times. Int. J. Prod. Res. 54, 6812\u20136824 (2016). doi:10.1080\/00207543.2016.1178406","journal-title":"Int. J. Prod. Res."},{"key":"18_CR18","unstructured":"Knust, S.: Shop scheduling problems with transportation (1999)"},{"key":"18_CR19","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.ijpe.2010.07.012","volume":"143","author":"P Lacomme","year":"2013","unstructured":"Lacomme, P., Larabi, M., Tchernev, N.: Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Econ. 143, 24\u201334 (2013). doi:10.1016\/j.ijpe.2010.07.012","journal-title":"Int. J. Prod. Econ."},{"key":"18_CR20","doi-asserted-by":"publisher","unstructured":"Lakehal, M., Aissani, A., Bouibede, K.: New algorithm of scheduling based on prioriry rules on machines to solve bi-criteria blocking job shop scheduling problem. In: 12th International Symposium on Programming and Systems (ISPS), pp. 1\u20138 (2015), doi:10.1109\/ISPS.2015.7244978","DOI":"10.1109\/ISPS.2015.7244978"},{"key":"18_CR21","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1016\/S0377-2217(01)00338-1","volume":"143","author":"A Mascis","year":"2002","unstructured":"Mascis, A., Pacciarelli, D.: Job-shop scheduling with blocking and no-wait constraints. Eur. J. Oper. Res. 143, 498\u2013517 (2002). doi:10.1016\/S0377-2217(01)00338-1","journal-title":"Eur. J. Oper. Res."},{"key":"18_CR22","series-title":"Advances in Intelligent Systems and Computing","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/978-3-319-33625-1_1","volume-title":"Artificial Intelligence Perspectives in Intelligent Systems","author":"HE Nouri","year":"2016","unstructured":"Nouri, H.E., Driss, O.B., Gh\u00e9dira, K.: A classification schema for the job shop scheduling problem with transportation resources: state-of-the-art review. In: Silhavy, R., Senkerik, R., Oplatkova, Z.K., Silhavy, P., Prokopova, Z. (eds.) Artificial Intelligence Perspectives in Intelligent Systems. AISC, vol. 464, pp. 1\u201311. Springer, Cham (2016). doi:10.1007\/978-3-319-33625-1_1"},{"key":"18_CR23","doi-asserted-by":"publisher","first-page":"497","DOI":"10.1504\/EJIE.2012.047662","volume":"6","author":"J Poppenborg","year":"2012","unstructured":"Poppenborg, J., Knust, S., Hertzberg, J.: Online scheduling of flexible job-shops with blocking and transportation. EJIE 6, 497 (2012). doi:10.1504\/EJIE.2012.047662","journal-title":"EJIE"},{"key":"18_CR24","doi-asserted-by":"publisher","DOI":"10.1007\/978-90-481-9419-3_21","volume-title":"Machine Learning and Systems Engineering","author":"B Scholz-Reiter","year":"2010","unstructured":"Scholz-Reiter, B., Heger, J., Hildebrandt, T.: Analysis of priority rule-based scheduling in dual-resource-constrained shop-floor scenarios. Machine Learning and Systems Engineering, vol. 68. Springer, Dordrecht (2010). doi:10.1007\/978-90-481-9419-3_21"},{"key":"18_CR25","doi-asserted-by":"publisher","first-page":"4","DOI":"10.20965\/ijat.2017.p0004","volume":"11","author":"K-D Thoben","year":"2017","unstructured":"Thoben, K.-D., Wiesner, S., Wuest, T.: Industrie 4.0 and smart manufacturing: a review of research issues and application examples (mini special issue on smart manufacturing). Int. J. Autom. Technol. 11, 4\u201316 (2017). doi:10.20965\/ijat.2017.p0004","journal-title":"Int. J. Autom. Technol."},{"key":"18_CR26","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/S0305-0548(96)00061-5","volume":"24","author":"G Ulusoy","year":"1997","unstructured":"Ulusoy, G., Sivrikaya-\u015eerifo\u01e7lu, F., Bilge, \u00dc.: A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Comput. Oper. Res. 24, 335\u2013351 (1997). doi:10.1016\/S0305-0548(96)00061-5","journal-title":"Comput. Oper. Res."},{"key":"18_CR27","doi-asserted-by":"publisher","first-page":"1033","DOI":"10.1016\/j.asoc.2014.08.028","volume":"24","author":"C Zeng","year":"2014","unstructured":"Zeng, C., Tang, J., Yan, C.: Scheduling of no buffer job shop cells with blocking constraints and automated guided vehicles. App. Soft Comput. 24, 1033\u20131046 (2014). doi:10.1016\/j.asoc.2014.08.028","journal-title":"App. Soft Comput."},{"key":"18_CR28","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1080\/00207543.2013.828164","volume":"52","author":"Q Zhang","year":"2013","unstructured":"Zhang, Q., Manier, H., Manier, M.-A.: A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints. Int. J. Prod. Res. 52, 985\u20131002 (2013). doi:10.1080\/00207543.2013.828164","journal-title":"Int. J. Prod. Res."},{"key":"18_CR29","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1080\/0951192X.2013.814165","volume":"27","author":"F Zhao","year":"2013","unstructured":"Zhao, F., Tang, J., Wang, J., et al.: An improved particle swarm optimisation with a linearly decreasing disturbance term for flow shop scheduling with limited buffers. Int. J. Comput. Integr. Manuf. 27, 488\u2013499 (2013). doi:10.1080\/0951192X.2013.814165","journal-title":"Int. J. Comput. Integr. Manuf."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-66923-6_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,29]],"date-time":"2021-08-29T00:09:48Z","timestamp":1630195788000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-66923-6_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319669229","9783319669236"],"references-count":29,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-66923-6_18","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017]]},"assertion":[{"value":"31 August 2017","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Hamburg","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2017","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 September 2017","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7 September 2017","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2017","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}