{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T02:12:02Z","timestamp":1743041522952,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319669250"},{"type":"electronic","value":"9783319669267"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-66926-7_23","type":"book-chapter","created":{"date-parts":[[2017,8,28]],"date-time":"2017-08-28T14:14:04Z","timestamp":1503929644000},"page":"193-201","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Development Projects in SMEs"],"prefix":"10.1007","author":[{"given":"Bj\u00f8rnar","family":"Henriksen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carl Christian","family":"R\u00f8stad","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Moritz","family":"von Stietencron","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,8,29]]},"reference":[{"key":"23_CR1","unstructured":"Henriksen, B., R\u00f8stad, C.C., Naume, C.: Modularization fact-based design to increase \u201cthe room to maneuver\u201d. In: 6th International Conference on Information Systems, Logistics and Supply Chain ILS Conference 2016, 1\u20134 June, Bordeaux, France (2016)"},{"key":"23_CR2","unstructured":"PMI Project Definition. http:\/\/www.pmstudy.com\/about-PMP\/project.html. Accessed 15 Mar 2017"},{"issue":"4","key":"23_CR3","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1177\/875697280503600403","volume":"36","author":"K Jugdev","year":"2005","unstructured":"Jugdev, K., M\u00fcller, R.: A retrospective look at our evolving understanding of project success. Proj. Manag. J. 36(4), 19\u201331 (2005)","journal-title":"Proj. Manag. J."},{"key":"23_CR4","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/S0263-7863(98)00069-6","volume":"17","author":"R Atkinson","year":"1999","unstructured":"Atkinson, R.: Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. Int. J. Proj. Manag. 17, 337\u2013342 (1999)","journal-title":"Int. J. Proj. Manag."},{"issue":"1","key":"23_CR5","first-page":"67","volume":"19","author":"JK Pinto","year":"1988","unstructured":"Pinto, J.K., Slevin, D.P.: Project success: definitions and measurement techniques. Proj. Manag. J. 19(1), 67\u201371 (1988)","journal-title":"Proj. Manag. J."},{"key":"23_CR6","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0263-7863(97)00022-7","volume":"16","author":"J Wateridge","year":"1998","unstructured":"Wateridge, J.: How can IS\/IT projects be measured for success? Int. J. Proj. Manag. 16, 59\u201363 (1998)","journal-title":"Int. J. Proj. Manag."},{"key":"23_CR7","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1016\/S0263-7863(98)00040-4","volume":"17","author":"CS Lim","year":"1999","unstructured":"Lim, C.S., Mohamed, M.Z.: Criteria of project success: an exploratory re-examination. Int. J. Proj. Manag. 17, 243\u2013248 (1999)","journal-title":"Int. J. Proj. Manag."},{"key":"23_CR8","doi-asserted-by":"crossref","unstructured":"Andersen, E.S.: Prosjektet som en tempor\u00e6r organisasjon. MAGMA no 2 (2010)","DOI":"10.23865\/magma.v13.629"},{"key":"23_CR9","volume-title":"Managing Quality: Integrating the Supply Chain","author":"ST Foster","year":"2007","unstructured":"Foster, S.T., Ganguly, K.K.: Managing Quality: Integrating the Supply Chain. Pearson Prentice Hall, Upper Saddle River (2007)"},{"key":"23_CR10","doi-asserted-by":"crossref","unstructured":"Jo, H.H., Parsaei, H.R., Sullivan, W.G.: Principles of concurrent engineering. In: Concurrent Engineering, pp. 3\u201323. Springer, Berlin (1993)","DOI":"10.1007\/978-1-4615-3062-6_1"},{"key":"23_CR11","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1109\/17.552809","volume":"44","author":"RP Smith","year":"1997","unstructured":"Smith, R.P.: The historical roots of concurrent engineering fundamentals. IEEE Trans. Eng. Manag. 44, 67\u201378 (1997)","journal-title":"IEEE Trans. Eng. Manag."},{"key":"23_CR12","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1109\/6.76297","volume":"28","author":"A Rosenblatt","year":"1991","unstructured":"Rosenblatt, A., Watson, G.F.: Concurrent engineering. IEEE Spectr. 28, 22 (1991)","journal-title":"IEEE Spectr."},{"key":"23_CR13","volume-title":"Controlling Design Variants: Modular Product Platforms","author":"A Ericsson","year":"1999","unstructured":"Ericsson, A., Erixon, G.: Controlling Design Variants: Modular Product Platforms. Society of Manufacturing Engineers, Dearborn (1999)"},{"key":"23_CR14","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1002\/smj.4250171107","volume":"17","author":"R Sanchez","year":"1996","unstructured":"Sanchez, R., Mahoney, J.T.: Modularity, flexibility, and knowledge management in product and organization design. Strateg. Manag. J. 17, 63\u201376 (1996)","journal-title":"Strateg. Manag. J."},{"key":"23_CR15","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1016\/j.procir.2014.03.147","volume":"21","author":"A Mehrsai","year":"2014","unstructured":"Mehrsai, A., Henriksen, B., R\u00f8stad, C.C., Hribernik, K.A., Thoben, K.-D.: Make-to-XGrade for the design and manufacturing of flexible, adaptive, and reactive products. Procedia CIRP 21, 199\u2013205 (2014)","journal-title":"Procedia CIRP"},{"key":"23_CR16","volume-title":"CIM: Principles of Computer-Integrated Manufacturing","author":"J-B Waldner","year":"1992","unstructured":"Waldner, J.-B.: CIM: Principles of Computer-Integrated Manufacturing. Wiley, London (1992)"},{"key":"23_CR17","volume-title":"Orlicky\u2019s Material Requirements Planning 3\/E","author":"C Ptak","year":"2011","unstructured":"Ptak, C., Smith, C.: Orlicky\u2019s Material Requirements Planning 3\/E. McGraw Hill Professional, New York (2011)"},{"key":"23_CR18","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1016\/S0166-4972(02)00077-9","volume":"24","author":"S Ottosson","year":"2004","unstructured":"Ottosson, S.: Dynamic product development\u2014DPD. Technovation 24, 207\u2013217 (2004)","journal-title":"Technovation"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-66926-7_23","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,26]],"date-time":"2024-06-26T14:22:39Z","timestamp":1719411759000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-66926-7_23"}},"subtitle":["From Project Organization to Dynamic Resource Planning"],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319669250","9783319669267"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-66926-7_23","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2017]]},"assertion":[{"value":"29 August 2017","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Hamburg","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2017","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 September 2017","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7 September 2017","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2017","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}