{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T00:49:07Z","timestamp":1740098947358,"version":"3.37.3"},"publisher-location":"Cham","reference-count":21,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319669625"},{"type":"electronic","value":"9783319669632"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-66963-2_48","type":"book-chapter","created":{"date-parts":[[2017,8,28]],"date-time":"2017-08-28T07:15:18Z","timestamp":1503904518000},"page":"544-555","source":"Crossref","is-referenced-by-count":2,"title":["Model of Optimization of Mining Complex for the Planning of Flow of Quarry Production of Limestone in Multiple Products and with Elements for the Analysis of the Capacity"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2385-774X","authenticated-orcid":false,"given":"Holman","family":"Ospina-Mateus","sequence":"first","affiliation":[]},{"given":"Jaime","family":"Acevedo-Chedid","sequence":"additional","affiliation":[]},{"given":"Katherinne","family":"Salas-Navarro","sequence":"additional","affiliation":[]},{"given":"Natalie","family":"Morales-Londo\u00f1o","sequence":"additional","affiliation":[]},{"given":"Jairo","family":"Montero-Perez","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,8,29]]},"reference":[{"key":"48_CR1","doi-asserted-by":"crossref","unstructured":"Pimentel, B.S., Mateus, G.R., Almeida, F.A.: Mathematical models for optimizing the global mining supply chain. In: Intelligent Systems in Operations: Methods, Models and Applications in the Supply Chain, pp. 133\u2013163 (2010)","DOI":"10.4018\/978-1-61520-605-6.ch008"},{"key":"48_CR2","first-page":"39","volume":"30","author":"RA G\u00f3mez","year":"2011","unstructured":"G\u00f3mez, R.A., Correa, A.A.: An\u00e1lisis del transporte y distribuci\u00f3n de materiales de construcci\u00f3n utilizando simulaci\u00f3n discreta en 3D. Bolet\u00edn de Ciencias de La Tierra 30, 39\u201352 (2011)","journal-title":"Bolet\u00edn de Ciencias de La Tierra"},{"key":"48_CR3","doi-asserted-by":"crossref","unstructured":"Pimentel, B.S., Mateus, G.R., Almeida, F.A.: Stochastic capacity planning in a global mining supply chain. In: 2011 IEEE Workshop on Computational Intelligence in Production And Logistics Systems (CIPLS), pp. 1\u20138. IEEE (2011)","DOI":"10.1109\/CIPLS.2011.5953355"},{"issue":"2","key":"48_CR4","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1134\/S1062739147020079","volume":"47","author":"P Bodon","year":"2011","unstructured":"Bodon, P., Fricke, C., Sandeman, T., Stanford, C.: Modeling the mining supply chain from mine to port: a combined optimization and simulation approach. J. Min. Sci. 47(2), 202\u2013211 (2011)","journal-title":"J. Min. Sci."},{"issue":"2","key":"48_CR5","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1134\/S1062739147020018","volume":"47","author":"R Dimitrakopoulos","year":"2011","unstructured":"Dimitrakopoulos, R.: Stochastic optimization for strategic mine planning: a decade of developments. J. Min. Sci. 47(2), 138\u2013150 (2011)","journal-title":"J. Min. Sci."},{"key":"48_CR6","doi-asserted-by":"crossref","unstructured":"Zhao, Y., Zhou, Y., Li, C., Cao, Z.: SCM-based optimization of production planning for coal mine. In: 2012 9th International Conference on Fuzzy Systems and Knowledge Discovery (FSKD), pp. 968\u2013972. IEEE (2012)","DOI":"10.1109\/FSKD.2012.6233779"},{"key":"48_CR7","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/j.ins.2014.11.015","volume":"316","author":"J Fung","year":"2015","unstructured":"Fung, J., Singh, G., Zinder, Y.: Capacity planning in supply chains of mineral resources. Inf. Sci. 316, 397\u2013418 (2015)","journal-title":"Inf. Sci."},{"key":"48_CR8","doi-asserted-by":"crossref","first-page":"292","DOI":"10.1016\/j.asoc.2015.11.038","volume":"40","author":"RC Goodfellow","year":"2016","unstructured":"Goodfellow, R.C., Dimitrakopoulos, R.: Global optimization of open pit mining complexes with uncertainty. Appl. Soft Comput. 40, 292\u2013304 (2016)","journal-title":"Appl. Soft Comput."},{"key":"48_CR9","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.resourpol.2016.01.005","volume":"47","author":"K Zhang","year":"2016","unstructured":"Zhang, K., Kleit, A.N.: Mining rate optimization considering the stockpiling: a theoretical economics and real option model. Resour. Policy 47, 87\u201394 (2016)","journal-title":"Resour. Policy"},{"issue":"3","key":"48_CR10","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1177\/1063293X9600400303","volume":"4","author":"FB Vernadat","year":"1996","unstructured":"Vernadat, F.B.: Enterprise integration: on business process and enterprise activity modelling. Concurrent Eng. 4(3), 219\u2013228 (1996)","journal-title":"Concurrent Eng."},{"key":"48_CR11","first-page":"6","volume":"38","author":"JGD V\u00e9lez","year":"2012","unstructured":"V\u00e9lez, J.G.D., Otero, L.F.R.: Modelo matem\u00e1tico para la optimizaci\u00f3n de una cadena de suministro global con consideraciones de cupos de compra y periodos de pago. El Hombre y la M\u00e1quina 38, 6\u201321 (2012)","journal-title":"El Hombre y la M\u00e1quina"},{"issue":"1","key":"48_CR12","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1134\/S1062739149010097","volume":"49","author":"J Benndorf","year":"2013","unstructured":"Benndorf, J., Dimitrakopoulos, R.: Stochastic long-term production scheduling of iron ore deposits: integrating joint multi-element geological uncertainty. J. Min. Sci. 49(1), 68\u201381 (2013)","journal-title":"J. Min. Sci."},{"issue":"3","key":"48_CR13","first-page":"43","volume":"316","author":"M Godoy","year":"2004","unstructured":"Godoy, M., Dimitrakopoulos, R.: Managing risk and waste mining in long-term production scheduling of open-pit mines. SME Trans. 316(3), 43\u201350 (2004). \n            https:\/\/www.researchgate.net\/profile\/Roussos_Dimitrakopoulos\/publication\/43458583_Managing_risk_and_waste_mining_in_long-term_production_scheduling\/links\/0f31752f9977473219000000\/Managing-risk-and-waste-mining-in-long-term-production-scheduling.pdf","journal-title":"SME Trans."},{"issue":"9","key":"48_CR14","doi-asserted-by":"crossref","first-page":"1305","DOI":"10.1057\/jors.2013.81","volume":"65","author":"A Lamghari","year":"2014","unstructured":"Lamghari, A., Dimitrakopoulos, R., Ferland, J.A.: A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty. J. Oper. Res. Soc. 65(9), 1305\u20131314 (2014)","journal-title":"J. Oper. Res. Soc."},{"issue":"4","key":"48_CR15","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1134\/S1062739149040096","volume":"49","author":"L Montiel","year":"2013","unstructured":"Montiel, L., Dimitrakopoulos, R.: Stochastic mine production scheduling with multiple processes: application at Escondida Norte, Chile. J. Min. Sci. 49(4), 583\u2013597 (2013)","journal-title":"J. Min. Sci."},{"key":"48_CR16","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/j.ins.2014.11.015","volume":"316","author":"J Fung","year":"2015","unstructured":"Fung, J., Singh, G., Zinder, Y.: Capacity planning in supply chains of mineral resources. Inf. Sci. 316, 397\u2013428 (2015). \nhttp:\/\/dx.doi.org\/10.1016\/j.ins.2014.11.015","journal-title":"Inf. Sci."},{"key":"48_CR17","volume-title":"Modeling the Supply Chain","author":"J Shapiro","year":"2001","unstructured":"Shapiro, J.: Modeling the Supply Chain. Brooks\/Cole-Thomson Learning, Pacific Grove (2001)"},{"key":"48_CR18","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1016\/S0377-2217(96)00298-6","volume":"97","author":"TG Crainic","year":"1997","unstructured":"Crainic, T.G., Laporte, G.: Planning models for freight transportation. Eur. J. Oper. Res. 97, 409\u2013438 (1997). doi:\n10.1016\/S0377-2217(96)00298-6","journal-title":"Eur. J. Oper. Res."},{"key":"48_CR19","doi-asserted-by":"publisher","first-page":"116","DOI":"10.1080\/05695558108974543","volume":"13","author":"JJ Solberg","year":"1981","unstructured":"Solberg, J.J.: Capacity planning with a stochastic workflow model. AIIE Trans. 13, 116\u2013122 (1981). doi:\n10.1080\/05695558108974543","journal-title":"AIIE Trans."},{"issue":"2","key":"48_CR20","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1108\/01445150910945589","volume":"29","author":"Z Mehrjerdi","year":"2009","unstructured":"Mehrjerdi, Z.: The collaborative supply chain. Assembly Autom. 29(2), 127\u2013136 (2009)","journal-title":"Assembly Autom."},{"key":"48_CR21","doi-asserted-by":"crossref","first-page":"575","DOI":"10.1016\/j.ejor.2004.03.001","volume":"163","author":"H Stadtler","year":"2005","unstructured":"Stadtler, H.: Supply chain management and advanced planning \u2013basics, overview and challenges. Eur. J. Oper. Res. 163, 575\u2013588 (2005)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Communications in Computer and Information Science","Applied Computer Sciences in Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-66963-2_48","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,8,28]],"date-time":"2017-08-28T07:32:25Z","timestamp":1503905545000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-66963-2_48"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319669625","9783319669632"],"references-count":21,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-66963-2_48","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2017]]}}}