{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T19:24:08Z","timestamp":1725909848392},"publisher-location":"Cham","reference-count":14,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319672229"},{"type":"electronic","value":"9783319672236"}],"license":[{"start":{"date-parts":[[2017,9,1]],"date-time":"2017-09-01T00:00:00Z","timestamp":1504224000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-67223-6_34","type":"book-chapter","created":{"date-parts":[[2017,8,31]],"date-time":"2017-08-31T07:56:24Z","timestamp":1504166184000},"page":"355-368","source":"Crossref","is-referenced-by-count":1,"title":["An Analysis of the Impact of Buffer Allocation and Maintenance on the Effectiveness of a Manufacturing System Using Computer Simulation"],"prefix":"10.1007","author":[{"given":"S\u0142awomir","family":"K\u0142os","sequence":"first","affiliation":[]},{"given":"Dorota","family":"Stadnicka","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,9,1]]},"reference":[{"issue":"4","key":"34_CR1","doi-asserted-by":"crossref","first-page":"448","DOI":"10.1108\/17410380610662870","volume":"17","author":"A Burduk","year":"2006","unstructured":"Burduk, A., Chlebus, E.: Variant simulation in design and risk estimation of manufacturing system. J. Manuf. Technol. Manag. 17(4), 448\u2013459 (2006)","journal-title":"J. Manuf. Technol. Manag."},{"key":"34_CR2","doi-asserted-by":"crossref","unstructured":"Jasiulewicz-Kaczmarek, M., Bartkowiak, T.: Improving the performance of a filling line based on simulation. In: ModTech International Conference - Modern Technologies in Industrial Engineering IV. IOP Conference Series: Materials Science and Engineering, vol. 145 (2016)","DOI":"10.1088\/1757-899X\/145\/4\/042024"},{"key":"34_CR3","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/j.jmsy.2013.12.007","volume":"33","author":"A Negahban","year":"2014","unstructured":"Negahban, A., Smith, J.S.: Simulation for manufacturing system design and operation: literature review and analysis. J. Manuf. Syst. 33, 241\u2013261 (2014)","journal-title":"J. Manuf. Syst."},{"issue":"1","key":"34_CR4","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/j.cirp.2012.03.065","volume":"61","author":"J Ni","year":"2012","unstructured":"Ni, J., Jin, X.: Decision support systems for effective maintenance operations. CIRP Ann. \u2013 Manuf. Technol. 61(1), 411\u2013414 (2012)","journal-title":"CIRP Ann. \u2013 Manuf. Technol."},{"issue":"3","key":"34_CR5","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1108\/13552510210439829","volume":"8","author":"E Mjema","year":"2002","unstructured":"Mjema, E.: An analysis of personnel capacity requirements in the maintenance department by using a simulation method. J. Qual. Maint. Eng. 8(3), 253\u2013273 (2002)","journal-title":"J. Qual. Maint. Eng."},{"issue":"1","key":"34_CR6","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/j.ijpe.2006.08.028","volume":"112","author":"S Iassinovski","year":"2008","unstructured":"Iassinovski, S., Artiba, A., Fagnart, C.: A generic production, rules-based system for online simulation, decision making and discrete process control. Int. J. Prod. Econ. 112(1), 62\u201376 (2008)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"34_CR7","doi-asserted-by":"crossref","first-page":"1142","DOI":"10.1016\/j.ejor.2008.03.037","volume":"197","author":"V Boschian","year":"2009","unstructured":"Boschian, V., Rezg, N., Chelbi, A.: Contribution of simulation to the optimisation of maintenance strategies for a randomly failing production system. Eur. J. Oper. Res. 197(3), 1142\u20131149 (2009)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"34_CR8","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"47","author":"H Allaoui","year":"2004","unstructured":"Allaoui, H., Artiba, A.: Integrating simulation and optimisation to schedule a hybrid flow shop with maintenance constraints. Comput. Ind. Eng. 47(4), 431\u2013450 (2004)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"34_CR9","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1007\/s13198-011-0045-x","volume":"1","author":"A Horenbeek","year":"2010","unstructured":"Horenbeek, A., Pintelon, L., Muchiri, P.: Maintenance optimisation models and criteria. Int. J. Syst. Assur. Eng. Manag. 1(3), 189\u2013200 (2010)","journal-title":"Int. J. Syst. Assur. Eng. Manag."},{"issue":"1","key":"34_CR10","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/j.ress.2007.03.018","volume":"94","author":"T Rosqvist","year":"2009","unstructured":"Rosqvist, T., Laakso, K., Reunanen, M.: Value-driven maintenance planning for a production plant. Reliab. Eng. Syst. Safety 94(1), 97\u2013110 (2009)","journal-title":"Reliab. Eng. Syst. Safety"},{"key":"34_CR11","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1007\/s10845-012-0687-9","volume":"25","author":"L Demir","year":"2014","unstructured":"Demir, L., Tunali, S., Eliiyi, D.T.: The state of the art on the buffer allocation problem: a comprehensive survey. J. Intell. Manuf. 25, 371\u2013392 (2014)","journal-title":"J. Intell. Manuf."},{"key":"34_CR12","unstructured":"Tecnomatix Plant Simulation \u2013 Software Package documentation"},{"key":"34_CR13","doi-asserted-by":"crossref","unstructured":"Kujawi\u0144ska, A., Rogalewicz, M., Diering, M., Hamrol, A.: Statistical approach to making decisions in manufacturing process of floorboard. In: Recent Advances in Information Systems and Technologies, WorldCIST 2017. Advances in Intelligent Systems and Computing, vol. 571, pp. 499\u2013508. Springer, Heidelberg (2017)","DOI":"10.1007\/978-3-319-56541-5_51"},{"key":"34_CR14","doi-asserted-by":"crossref","unstructured":"Trojanowska, J., Varela, M.L.R., Machado, J.: The tool supporting decision making process in area of job-shop scheduling. In: Recent Advances in Information Systems and Technologies, WorldCIST 2017. Advances in Intelligent Systems and Computing, vol. 571, pp. 490\u2013498. Springer, Heidelberg (2017)","DOI":"10.1007\/978-3-319-56541-5_50"}],"container-title":["Advances in Intelligent Systems and Computing","Information Systems Architecture and Technology: Proceedings of 38th International Conference on Information Systems Architecture and Technology \u2013 ISAT 2017"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-67223-6_34","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,2]],"date-time":"2019-10-02T20:23:14Z","timestamp":1570047794000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-67223-6_34"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,9,1]]},"ISBN":["9783319672229","9783319672236"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-67223-6_34","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2017,9,1]]}}}