{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,11]],"date-time":"2026-04-11T13:13:04Z","timestamp":1775913184644,"version":"3.50.1"},"publisher-location":"Cham","reference-count":20,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319737508","type":"print"},{"value":"9783319737515","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-73751-5_35","type":"book-chapter","created":{"date-parts":[[2018,1,31]],"date-time":"2018-01-31T12:57:43Z","timestamp":1517403463000},"page":"461-476","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["A New Rescheduling Heuristic for Flexible Job Shop Problem with Machine Disruption"],"prefix":"10.1007","author":[{"given":"Maroua","family":"Nouiri","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abdelghani","family":"Bekrar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abderrazak","family":"Jemai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ahmed Chiheb","family":"Ammari","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Smail","family":"Niar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,2,1]]},"reference":[{"key":"35_CR1","doi-asserted-by":"crossref","unstructured":"Nouiri, M., Bekrar, A., Jemai, A., Niar, S., Ammari, A.C.: An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem. J. Intell. Manuf. 1\u201313 (2015)","DOI":"10.1007\/s10845-015-1039-3"},{"key":"35_CR2","doi-asserted-by":"crossref","unstructured":"Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty\u202f: survey and research directions. Int. Conf. Adv. Logist. Trans. 267\u2013272 (2014)","DOI":"10.1109\/ICAdLT.2014.6866316"},{"key":"35_CR3","doi-asserted-by":"crossref","unstructured":"Cardin, O., Trentesaux, D., Thomas, A., Castagna, P., Berger, T., El-Haouzi, H.: Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges. J. Intell. Manuf. 1\u201315 (2015)","DOI":"10.1007\/s10845-015-1139-0"},{"issue":"1","key":"35_CR4","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1023\/A:1022235519958","volume":"6","author":"GE Vieira","year":"2003","unstructured":"Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies and methods. J. Sched. 6(1), 39\u201362 (2003)","journal-title":"J. Sched."},{"key":"35_CR5","doi-asserted-by":"crossref","unstructured":"Katragjini, K., Vallada, E.: Rescheduling flowshops under simultaneous disruptions. Int. Conf. Ind. Eng. Syst. Manag. (IESM). Sevilla, Spain, 21\u201323 Oct (2015)","DOI":"10.1109\/IESM.2015.7380141"},{"issue":"7","key":"35_CR6","doi-asserted-by":"crossref","first-page":"2065","DOI":"10.1080\/002075497195074","volume":"35","author":"RJ Abumaizar","year":"1997","unstructured":"Abumaizar, R.J., Svestka, J.A.: Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35(7), 2065\u20132082 (1997)","journal-title":"Int. J. Prod. Res."},{"issue":"9","key":"35_CR7","doi-asserted-by":"crossref","first-page":"669","DOI":"10.1007\/s00170-003-1601-6","volume":"22","author":"V Subramaniam","year":"2003","unstructured":"Subramaniam, V., Raheja, A.S.: mAOR: a heuristic-based reactive repair mechanism for job shop schedules. Int. J. Adv. Manuf. Technol. 22(9), 669\u2013680 (2003)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"10","key":"35_CR8","doi-asserted-by":"crossref","first-page":"2681","DOI":"10.1080\/00207543.2011.579637","volume":"50","author":"Y Dong","year":"2012","unstructured":"Dong, Y., Jang, J.: Production rescheduling for machine breakdown at a job shop. Int. J. Prod. Res. 50(10), 2681\u20132691 (2012)","journal-title":"Int. J. Prod. Res."},{"key":"35_CR9","doi-asserted-by":"crossref","unstructured":"Unachak, P.: Goodman: adaptive representation for flexible job-shop scheduling and rescheduling. In: Proceedings of the First ACM\/SIGEVO Summit on Genetic and Evolutionary Computation, pp. 511\u2013516. Shanghai, China, 12\u201314 June (2009)","DOI":"10.1145\/1543834.1543903"},{"issue":"1","key":"35_CR10","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/s00170-012-4001-y","volume":"64","author":"M Souier","year":"2013","unstructured":"Souier, M., Sari, Z., Hassam, A.: Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility. Int. J. Adv. Manuf. Technol. 64(1), 145\u2013164 (2013)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"35_CR11","doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R.: Particle swarm optimization. IEEE Int. Conf. Neural Netw. 1942\u20131948 (1995)","DOI":"10.1109\/ICNN.1995.488968"},{"key":"35_CR12","doi-asserted-by":"crossref","unstructured":"Jia, Z., Chen, H., Tang, J.: An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem. Int. Conf. Grey Syst. 1587\u20131592 (2007)","DOI":"10.1109\/GSIS.2007.4443539"},{"key":"35_CR13","unstructured":"Nouiri, M., Bekrar, A., Jemai, A., Trentesaux, D., Ammari, A.C., Niar, S.: Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Comput. Ind. Eng. 112, 595\u2013606 (2017)"},{"issue":"4","key":"35_CR14","first-page":"197","volume":"21","author":"A Motaghedi-Larijani","year":"2010","unstructured":"Motaghedi-Larijani, A., Sabri-l, K., Heydari, M.: Solving flexible job shop scheduling with multi objective approach. Int. J. Industr. Eng. Prod. Res. 21(4), 197\u2013209 (2010)","journal-title":"Int. J. Industr. Eng. Prod. Res."},{"issue":"3","key":"35_CR15","doi-asserted-by":"crossref","first-page":"744","DOI":"10.1016\/j.ejor.2015.07.017","volume":"248","author":"C Gahm","year":"2016","unstructured":"Gahm, C., Denz, F., Dirr, M., Tuma, A.: Energy efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248(3), 744\u2013757 (2016)","journal-title":"Eur. J. Oper. Res."},{"key":"35_CR16","doi-asserted-by":"crossref","unstructured":"Tonelli, F., Bruzzone, A., Paolucci, M., Carpanzano, E., Nicol, G., Giret, A., Salido, M., Trentesaux, D.: Assessment of mathematical programming and agent based modelling for off-line scheduling: application to energy aware manufacturing. CIRP Ann. Manuf. Technol. 65(1), 405\u2013408 (2016)","DOI":"10.1016\/j.cirp.2016.04.119"},{"key":"35_CR17","unstructured":"Salido, M., Escamilla, J., Barber, F., Giret, A.: Rescheduling in job-shop problems for sustainable manufacturing systems. J. Clean. Prod. 1\u201312 (2016)"},{"issue":"7","key":"35_CR18","doi-asserted-by":"crossref","first-page":"1950","DOI":"10.1080\/00207543.2014.935825","volume":"53","author":"T Borangiu","year":"2015","unstructured":"Borangiu, T., R\u0103ileanu, S., Berger, T., Trentesaux, D.: Switching mode control strategy in manufacturing execution systems. Int. J. Prod. Res. 53(7), 1950\u20131963 (2015)","journal-title":"Int. J. Prod. Res."},{"key":"35_CR19","doi-asserted-by":"crossref","unstructured":"Giret, A., Trentesaux, D., Salido, M., Garcia, E., Adam, E.: A holonic multi-agent methodology to design sustainable intelligent manufacturing control systems. J. Clean. Prod. 1\u201317 (2017)","DOI":"10.1016\/j.jclepro.2017.03.079"},{"key":"35_CR20","doi-asserted-by":"crossref","unstructured":"Raileanu, S., Anton, F., Iatan, A., Borangiu, T., Morariu, O.: Resource scheduling based on energy consumption for sustainable manufacturing. J. Intell. Manuf. 1\u201312 (2015)","DOI":"10.1007\/s10845-015-1142-5"}],"container-title":["Studies in Computational Intelligence","Service Orientation in Holonic and Multi-Agent Manufacturing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-73751-5_35","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,30]],"date-time":"2025-06-30T09:04:52Z","timestamp":1751274292000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-73751-5_35"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319737508","9783319737515"],"references-count":20,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-73751-5_35","relation":{},"ISSN":["1860-949X","1860-9503"],"issn-type":[{"value":"1860-949X","type":"print"},{"value":"1860-9503","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018]]}}}