{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T12:00:24Z","timestamp":1742990424158,"version":"3.40.3"},"publisher-location":"Cham","reference-count":7,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319744995"},{"type":"electronic","value":"9783319745008"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-74500-8_78","type":"book-chapter","created":{"date-parts":[[2018,3,20]],"date-time":"2018-03-20T00:20:32Z","timestamp":1521505232000},"page":"873-883","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Improvement of Scheduling, Assignment of Tools on Assembly Machines Connected to a Supervision Interface"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1964-8443","authenticated-orcid":false,"given":"El Fekri","family":"Yassine","sequence":"first","affiliation":[]},{"given":"Ouardouz","family":"Mustapha","sequence":"additional","affiliation":[]},{"given":"Bel Fekih","family":"Abdelaziz","sequence":"additional","affiliation":[]},{"given":"Bernoussi","family":"Abdessamad","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,3,21]]},"reference":[{"key":"78_CR1","unstructured":"MARTIN, Alain and Chantal BONNEFOUS,Gestion de la production, Chapitre 9 -\u00a0\u00abLa gestion d\u2019atelier par les contraintes\u00bb, 5th edn. (2011)"},{"key":"78_CR2","unstructured":"Prins, C., Sevaux, M.: Programmation lin\u00e9aire avec Excel: 55 probl\u00e8mes d\u2019optimisation mod\u00e9lis\u00e9s pas \u00e0 pas et r\u00e9solus avec Excel, chapitre 13 - Emplois du temps et gestion de personnel, pp. 215\u2013350, 3 Mars 2011"},{"issue":"2","key":"78_CR3","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.omega.2003.09.014","volume":"32","author":"F Huq","year":"2004","unstructured":"Huq, F., Cutright, K., Martin, C.: Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. Omega 32(2), 121\u2013129 (2004)","journal-title":"Omega"},{"key":"78_CR4","unstructured":"Yalaoui, F.: Optimisation et gestion de la production: probl\u00e8me de conception et probl\u00e8me d\u2019ordonnancement. Habilitation \u00e0 diriger les recherches, Universit\u00e9 de Technologie de Compi\u00e8gne (2006)"},{"key":"78_CR5","unstructured":"Lalande, J.F.: Equilibrage des lignes de montage, Rapport de Stage ISIMA (2000)"},{"key":"78_CR6","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/S0925-5273(99)00057-2","volume":"64","author":"M Amen","year":"2000","unstructured":"Amen, M.: An exact method for cost-oriented assembly line balancing. Int. J. Prod. Econ. 64, 187\u2013195 (2000)","journal-title":"Int. J. Prod. Econ."},{"key":"78_CR7","unstructured":"Som, H.: Mod\u00e8le Math\u00e9matique pour le probl\u00e8me de l\u2019\u00c9quilibrage de la Charge sur une ligne de Production, Rapport de projet CUST (2001)"}],"container-title":["Lecture Notes in Networks and Systems","Innovations in Smart Cities and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-74500-8_78","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,3,20]],"date-time":"2018-03-20T16:20:06Z","timestamp":1521562806000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-74500-8_78"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319744995","9783319745008"],"references-count":7,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-74500-8_78","relation":{},"ISSN":["2367-3370","2367-3389"],"issn-type":[{"type":"print","value":"2367-3370"},{"type":"electronic","value":"2367-3389"}],"subject":[],"published":{"date-parts":[[2018]]}}}