{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,10]],"date-time":"2024-09-10T12:31:42Z","timestamp":1725971502047},"publisher-location":"Cham","reference-count":17,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319763477"},{"type":"electronic","value":"9783319763484"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-76348-4_62","type":"book-chapter","created":{"date-parts":[[2018,3,21]],"date-time":"2018-03-21T15:10:42Z","timestamp":1521645042000},"page":"640-649","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A Novel Hybrid GA for the Assignment of Jobs to Machines in a Complex Hybrid Flow Shop Problem"],"prefix":"10.1007","author":[{"given":"Houda","family":"Harbaoui","sequence":"first","affiliation":[]},{"given":"Soulef","family":"Khalfallah","sequence":"additional","affiliation":[]},{"given":"Odile","family":"Bellenguez-Morineau","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,3,22]]},"reference":[{"key":"62_CR1","doi-asserted-by":"crossref","unstructured":"Harbaoui, H., Bellenguez-Morineau, O., Khalfallah, S.: Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times. In: 2016 IEEE International Conference on Systems, Man, and Cybernetics (SMC), pp. 002990\u2013002995 (2016)","DOI":"10.1109\/SMC.2016.7844695"},{"key":"62_CR2","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1057\/jors.1988.63","volume":"39","author":"JND Gupta","year":"1988","unstructured":"Gupta, J.N.D.: Two-stage hybrid flow shop scheduling problem. J. Oper. Res. Soc. 39, 359\u2013364 (1988)","journal-title":"J. Oper. Res. Soc."},{"key":"62_CR3","unstructured":"Chikhi, N., Benmansoury, R., Bekrarz, A., Hanafiy, A., Abbas, M.: Makespan minimization for two-stage hybrid flow shop with dedicated machines and additional constraints. In: 9th International Conference of Modeling, Optimization and Simulation - MOSIM 2012, 6\u20138 June 2012, Bordeaux, France (2012). https:\/\/hal.archives-ouvertes.fr\/hal-00728687"},{"key":"62_CR4","doi-asserted-by":"crossref","first-page":"438","DOI":"10.1016\/j.cor.2012.07.015","volume":"40","author":"S Wang","year":"2013","unstructured":"Wang, S., Liu, M.: A heuristic method for two-stage hybrid flow shop with dedicated machines. Comput. Oper. Res. 40, 438\u2013450 (2013)","journal-title":"Comput. Oper. Res."},{"issue":"4","key":"62_CR5","doi-asserted-by":"crossref","first-page":"1094","DOI":"10.1080\/00207543.2014.944631","volume":"53","author":"BMT Lin","year":"2015","unstructured":"Lin, B.M.T.: Two-stage flow shop scheduling with dedicated machines. Int. J. Prod. Res. 53(4), 1094\u20131097 (2015)","journal-title":"Int. J. Prod. Res."},{"key":"62_CR6","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.amc.2005.11.136","volume":"180","author":"M Zandieh","year":"2006","unstructured":"Zandieh, M., Fatemi Ghomi, S.M.T., Moattar Husseini, S.M.: An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Appl. Math. Comput. 180, 111\u2013127 (2006)","journal-title":"Appl. Math. Comput."},{"key":"62_CR7","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/S0377-2217(03)00401-6","volume":"159","author":"ME Kurz","year":"2004","unstructured":"Kurz, M.E., Askin, R.G.: Scheduling flexible flow lines with sequence-dependent setup times. Eur. J. Oper. Res. 159, 66\u201382 (2004)","journal-title":"Eur. J. Oper. Res."},{"key":"62_CR8","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1016\/j.ejor.2004.06.038","volume":"169","author":"R Ruiz","year":"2006","unstructured":"Ruiz, R., Maroto, C.: A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility. Eur. J. Oper. Res. 169, 781\u2013800 (2006)","journal-title":"Eur. J. Oper. Res."},{"key":"62_CR9","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1016\/j.ejor.2004.01.022","volume":"165","author":"R Ruiz","year":"2005","unstructured":"Ruiz, R., Maroto, C., Alcaraz, J.: Solving the flow shop scheduling problem with sequence dependent setup times using advanced metaheuristics. Eur. J. Oper. Res. 165, 34\u201354 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"62_CR10","doi-asserted-by":"crossref","first-page":"2490","DOI":"10.1016\/j.apm.2013.10.061","volume":"38","author":"M Ebrahimi","year":"2014","unstructured":"Ebrahimi, M., Fatemi Ghomi, S.M.T., Karimi, B.: Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Appl. Math. Model. 38, 2490\u20132504 (2014)","journal-title":"Appl. Math. Model."},{"key":"62_CR11","unstructured":"Naderi, B., Ruiz, R., Zandieh, M.: A two stage flow shop with parallel dedicated machines. In: 8th International Conference of Modeling and Simulation, MOSIM 2010, Hammamet, Tunisia. IEEE Explore (2010)"},{"key":"62_CR12","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1007\/s00170-011-3701-z","volume":"61","author":"A Ziaeifar","year":"2012","unstructured":"Ziaeifar, A., Moghaddam, R.T., Pichka, K.: Solving a new mathematical model for a hybrid flow shop scheduling problem with a processor assignment by a genetic algorithm. Int. J. Adv. Manuf. Technol. 61, 339\u2013349 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"62_CR13","doi-asserted-by":"crossref","first-page":"1064","DOI":"10.1016\/j.cor.2012.10.015","volume":"40","author":"S Wang","year":"2013","unstructured":"Wang, S., Liu, M.: A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem. Comput. Oper. Res. 40, 1064\u20131075 (2013)","journal-title":"Comput. Oper. Res."},{"key":"62_CR14","doi-asserted-by":"crossref","first-page":"921","DOI":"10.1007\/s00170-008-1865-y","volume":"44","author":"RH Huang","year":"2009","unstructured":"Huang, R.H., Yang, C.L., Huang, Y.C.: No-wait two-stage multi processor flowshop scheduling with unit setup. Int. J. Adv. Manuf. Technol. 44, 921\u2013927 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"62_CR15","doi-asserted-by":"crossref","unstructured":"Sioud, A., Gravel, M., Gagn\u00e9, M.: A genetic algorithm for solving a hybrid flexible flowshop with sequence dependent setup times. In: IEEE Congress on Evolutionary Computation, Cancan, Mexico. IEEE Explore (2013)","DOI":"10.1109\/CEC.2013.6557871"},{"key":"62_CR16","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.amc.2017.01.004","volume":"303","author":"Q-K Pan","year":"2017","unstructured":"Pan, Q.-K., Gao, L., Li, X.-Y., Gao, K.-Z.: Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times. Appl. Math. Comput. 303, 89\u2013112 (2017)","journal-title":"Appl. Math. Comput."},{"key":"62_CR17","volume-title":"Adaptation in Natural and Artificial Systems","author":"J Holland","year":"1975","unstructured":"Holland, J.: Adaptation in Natural and Artificial Systems. University of Michigan Press, Ann Arbor (1975)"}],"container-title":["Advances in Intelligent Systems and Computing","Intelligent Systems Design and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-76348-4_62","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,29]],"date-time":"2020-10-29T22:04:32Z","timestamp":1604009072000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-76348-4_62"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319763477","9783319763484"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-76348-4_62","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2018]]}}}