{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T00:50:43Z","timestamp":1740099043967,"version":"3.37.3"},"publisher-location":"Cham","reference-count":20,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319775371"},{"type":"electronic","value":"9783319775388"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-77538-8_39","type":"book-chapter","created":{"date-parts":[[2018,3,7]],"date-time":"2018-03-07T06:33:17Z","timestamp":1520404397000},"page":"561-577","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Integrating Evolution Strategies into Genetic Algorithms with Fuzzy Inference Evaluation to Solve a Steelmaking and Continuous Casting Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Eduardo","family":"Salazar","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,3,8]]},"reference":[{"key":"39_CR1","doi-asserted-by":"publisher","unstructured":"Tang, L., Luh, P., Liu, J., Fang, L.: Steel-making process scheduling using Lagrangian relaxation. Int. J. Prod. Res. 40(1), 55\u201370 (2002). \nhttps:\/\/doi.org\/10.1080\/00207540110073000","DOI":"10.1080\/00207540110073000"},{"key":"39_CR2","doi-asserted-by":"publisher","first-page":"976","DOI":"10.1016\/j.omega.2007.11.002","volume":"36","author":"L Tang","year":"2008","unstructured":"Tang, L., Wang, G.: Decision Support system for the batching problems of steelmaking and continuous-casting production. Omega Int. J. Manag. Sci. 36, 976\u2013991 (2008). \nhttps:\/\/doi.org\/10.1016\/j.omega.2007.11.002","journal-title":"Omega Int. J. Manag. Sci."},{"key":"39_CR3","unstructured":"Salazar, E.: Scheduling Multi-Stage Batch Production Systems with Continuity Constraints \u2013 The Steelmaking and Continuous Casting System. Dissertation, RWTH Aachen (2013)"},{"key":"39_CR4","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1016\/S0377-2217(99)00041-7","volume":"120","author":"L Tang","year":"2000","unstructured":"Tang, L., Liu, J., Rong, A., Yang, Z.: A mathematical programming model for scheduling steelmaking-continuous casting production. Europ. J. Oper. Res. 120, 423\u2013435 (2000). \nhttps:\/\/doi.org\/10.1016\/S0377-2217(99)00041-7","journal-title":"Europ. J. Oper. Res."},{"key":"39_CR5","doi-asserted-by":"publisher","first-page":"1647","DOI":"10.1016\/S0098-1354(01)00729-3","volume":"25","author":"I Harjunkoski","year":"2001","unstructured":"Harjunkoski, I., Grossmann, I.: A decomposition approach for the scheduling of a steel plant production. Comput. Chem. Eng. 25, 1647\u20131660 (2001). \nhttps:\/\/doi.org\/10.1016\/S0098-1354(01)00729-3","journal-title":"Comput. Chem. Eng."},{"key":"39_CR6","doi-asserted-by":"publisher","first-page":"2823","DOI":"10.1016\/j.compchemeng.2004.08.031","volume":"28","author":"D Pacciarelli","year":"2004","unstructured":"Pacciarelli, D., Pranzo, M.: Production scheduling in a steelmaking \u2013 continuous casting plant. Comput. Chem. Eng. 28, 2823\u20132835 (2004). \nhttps:\/\/doi.org\/10.1016\/j.compchemeng.2004.08.031","journal-title":"Comput. Chem. Eng."},{"key":"39_CR7","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1016\/j.ijpe.2004.10.016","volume":"104","author":"A Bellabdaoui","year":"2006","unstructured":"Bellabdaoui, A., Teghem, J.: A mixed-integer linear programming model for the continuous casting planning. Int. J. Prod. Econ. 104, 260\u2013270 (2006). \nhttps:\/\/doi.org\/10.1016\/j.ijpe.2004.10.016","journal-title":"Int. J. Prod. Econ."},{"key":"39_CR8","doi-asserted-by":"publisher","first-page":"1453","DOI":"10.1016\/j.ejor.2006.09.090","volume":"182","author":"L Tang","year":"2007","unstructured":"Tang, L., Liu, G.: A mathematical programming model and solution for scheduling production orders in Shangai Baoshan Iron and Steel Complex. Eur. J. Oper. Res. 182, 1453\u20131468 (2007). \nhttps:\/\/doi.org\/10.1016\/j.ejor.2006.09.090","journal-title":"Eur. J. Oper. Res."},{"issue":"24","key":"39_CR9","doi-asserted-by":"publisher","first-page":"7276","DOI":"10.1080\/00207543.2014.919421","volume":"52","author":"A Sbihi","year":"2014","unstructured":"Sbihi, A., Bellabdaoui, A., Teghem, J.: Solving mixed-integer linear program with times setup for the steel-continuous casting planning and scheduling problem. Int. J. Prod. Res. 52(24), 7276\u20137296 (2014). \nhttps:\/\/doi.org\/10.1080\/00207543.2014.919421","journal-title":"Int. J. Prod. Res."},{"issue":"15","key":"39_CR10","doi-asserted-by":"publisher","first-page":"4147","DOI":"10.1080\/00207540801950136","volume":"47","author":"H Missbauer","year":"2009","unstructured":"Missbauer, H., Hauber, W., Stadler, W.: A scheduling system for the steelmaking-continuous casting process \u2013 a case study from the steel-making industry. Int. J. Prod. Res. 47(15), 4147\u20134172 (2009). \nhttps:\/\/doi.org\/10.1080\/00207540801950136","journal-title":"Int. J. Prod. Res."},{"key":"39_CR11","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1016\/j.ijpe.2005.01.008","volume":"104","author":"I Ferretti","year":"2006","unstructured":"Ferretti, I., Zanoni, S., Zavanella, L.: Production \u2013 inventory scheduling using ant system metaheuristic. Int. J. Prod. Econ. 104, 317\u2013326 (2006). \nhttps:\/\/doi.org\/10.1016\/j.ijpe.2005.01.008","journal-title":"Int. J. Prod. Econ."},{"key":"39_CR12","doi-asserted-by":"publisher","first-page":"2450","DOI":"10.1016\/j.cor.2008.10.010","volume":"36","author":"A Atighehchian","year":"2009","unstructured":"Atighehchian, A., Bijari, M., Tarkesh, H.: A novel hybrid algorithm for scheduling steel-making continuous casting production. Comput. Oper. Res. 36, 2450\u20132461 (2009). \nhttps:\/\/doi.org\/10.1016\/j.cor.2008.10.010","journal-title":"Comput. Oper. Res."},{"issue":"18","key":"39_CR13","doi-asserted-by":"publisher","first-page":"3975","DOI":"10.1080\/00207540410001716453","volume":"42","author":"R Roy","year":"2004","unstructured":"Roy, R., Adesola, B.A., Thornton, S.: Development of a knowledge model for managing schedule disturbance in steel-making. Int. J. Prod. Res. 42(18), 3975\u20133994 (2004). \nhttps:\/\/doi.org\/10.1080\/00207540410001716453","journal-title":"Int. J. Prod. Res."},{"key":"39_CR14","doi-asserted-by":"publisher","first-page":"663","DOI":"10.1016\/j.proeng.2012.01.020","volume":"29","author":"D-L Hou","year":"2012","unstructured":"Hou, D.-L., Li, T.-K.: Analysis of random disturbances on shop floor in modern steel production dynamic environment. Procedia Eng. 29, 663\u2013667 (2012). \nhttps:\/\/doi.org\/10.1016\/j.proeng.2012.01.020","journal-title":"Procedia Eng."},{"issue":"11","key":"39_CR15","doi-asserted-by":"publisher","first-page":"3197","DOI":"10.1080\/00207543.2016.1268277","volume":"55","author":"J Long","year":"2017","unstructured":"Long, J., Zheng, Z., Gao, X.: Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown. Int. J. Prod. Res. 55(11), 3197\u20133216 (2017). \nhttps:\/\/doi.org\/10.1080\/00207543.2016.1268277","journal-title":"Int. J. Prod. Res."},{"key":"39_CR16","doi-asserted-by":"publisher","unstructured":"Abido, M.A., Elazouni, A.M.: Precedence-preserving GAs operators for scheduling problems with activities start times encoding. J. Comput. Civil Eng., 345\u2013356 (2010). \nhttps:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000039","DOI":"10.1061\/(asce)cp.1943-5487.0000039"},{"key":"39_CR17","unstructured":"Michalewicz, Z.: Genetic Algorithms\u00a0+\u00a0Data Structures\u00a0=\u00a0Evolution Programs., 3rd edn. Springer, Heidelberg (1999)"},{"key":"39_CR18","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-010-0646-0","volume-title":"Fuzzy Set Theory \u2013 and Applications","author":"H-J Zimmermann","year":"2001","unstructured":"Zimmermann, H.-J.: Fuzzy Set Theory \u2013 and Applications, 4th edn. Kluwer, Boston (2001)","edition":"4"},{"key":"39_CR19","unstructured":"Ross, T.J.: Fuzzy Logic with Engineering Applications, 2nd edn. Wiley, Chichester (2004)"},{"key":"39_CR20","unstructured":"Salazar, E.: Sistema de Programaci\u00f3n Acer\u00edas \u2013 Coladas Continuas\/CSH. Informe T\u00e9cnico - IIT\/Facultad de Ingenier\u00eda, Universidad de Concep\u00f3n, Chile (2001)"}],"container-title":["Lecture Notes in Computer Science","Applications of Evolutionary Computation"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-77538-8_39","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,3,7]],"date-time":"2018-03-07T06:48:57Z","timestamp":1520405337000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-77538-8_39"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319775371","9783319775388"],"references-count":20,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-77538-8_39","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2018]]}}}