{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,21]],"date-time":"2026-03-21T04:07:41Z","timestamp":1774066061156,"version":"3.50.1"},"publisher-location":"Cham","reference-count":38,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319783000","type":"print"},{"value":"9783319783017","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-78301-7_5","type":"book-chapter","created":{"date-parts":[[2018,5,1]],"date-time":"2018-05-01T11:05:02Z","timestamp":1525172702000},"page":"93-115","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Controlling a Single Transport Robot in a Flexible Job Shop Environment by Hybrid Metaheuristics"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0901-1278","authenticated-orcid":false,"given":"Houssem Eddine","family":"Nouri","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3077-6240","authenticated-orcid":false,"given":"Olfa Belkahla","family":"Driss","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Khaled","family":"Gh\u00e9dira","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,4,14]]},"reference":[{"issue":"2","key":"5_CR1","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1080\/0020754032000123579","volume":"42","author":"TF Abdelmaguid","year":"2004","unstructured":"Abdelmaguid, T.F., Nassef, A.O., Kamal, B.A., Hassan, M.F.: A hybrid GA\/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 42(2), 267\u2013281 (2004)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"5_CR2","doi-asserted-by":"publisher","first-page":"653","DOI":"10.1080\/002075498193624","volume":"36","author":"MF Anwar","year":"1998","unstructured":"Anwar, M.F., Nagi, R.: Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies. Int. J. Prod. Res. 36(3), 653\u2013681 (1998)","journal-title":"Int. J. Prod. Res."},{"issue":"16","key":"5_CR3","doi-asserted-by":"publisher","first-page":"4683","DOI":"10.1080\/00207540903049407","volume":"48","author":"AG Babu","year":"2010","unstructured":"Babu, A.G., Jerald, J., Haq, A.N., Luxmi, V.M., Vigneswaralu, T.P.: Scheduling of machines and automated guided vehicles in fms using differential evolution. Int. J. Prod. Res. 48(16), 4683\u20134699 (2010)","journal-title":"Int. J. Prod. Res."},{"key":"5_CR4","unstructured":"Bellifemine, F., Poggi, A., Rimassa, G.: JADE - A FIPA-compliant agent framework. In: Proceedings of the Fourth International Conference and Exhibition on The Practical Application of Intelligent Agents and Multi-Agent Technology, pp. 97\u2013108, April 1999"},{"issue":"6","key":"5_CR5","doi-asserted-by":"publisher","first-page":"1058","DOI":"10.1287\/opre.43.6.1058","volume":"43","author":"U Bilge","year":"1995","unstructured":"Bilge, U., Ulusoy, G.: A time window approach to simultaneous scheduling of machines and material handling system in an FMS. Oper. Res. 43(6), 1058\u20131070 (1995)","journal-title":"Oper. Res."},{"key":"5_CR6","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-84800-310-1","volume-title":"ANEMONA: A Multi-agent Methodology for Holonic Manufacturing Systems","author":"V Botti","year":"2008","unstructured":"Botti, V., Giret, A.: ANEMONA: A Multi-agent Methodology for Holonic Manufacturing Systems. Springer, London (2008). https:\/\/doi.org\/10.1007\/978-1-84800-310-1"},{"issue":"1","key":"5_CR7","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.procs.2010.04.032","volume":"1","author":"Wojciech Bo\u017cejko","year":"2010","unstructured":"Bozejko, W., Uchronski, M., Wodecki, M.: The new golf neighborhood for the flexible job shop problem. In: Proceedings of the International Conference on Computational Science, pp. 289\u2013296, May 2010","journal-title":"Procedia Computer Science"},{"key":"5_CR8","unstructured":"Braga, R.A.M., Rossetti, R.J.F., Reis, L.P., Oliveira, E.C.: Applying multi-agent systems to simulate dynamic control in flexible manufacturing scenarios. In: European Meeting on Cybernetics and Systems Research, vol. 2, pp. 488\u2013493. Austrian Society for Cybernetic Studies (2008)"},{"key":"5_CR9","unstructured":"Calabrese, M.: Hierarchical-granularity holonic modelling. Doctoral thesis, Universita degli Studi di Milano, Milano, Italy, March 2011"},{"issue":"3","key":"5_CR10","doi-asserted-by":"publisher","first-page":"706","DOI":"10.1016\/j.ejor.2008.03.051","volume":"199","author":"A Caumond","year":"2009","unstructured":"Caumond, A., Lacomme, P., Moukrim, A., Tchernev, N.: An MILP for scheduling problems in an FMS with one vehicle. Eur. J. Oper. Res. 199(3), 706\u2013722 (2009)","journal-title":"Eur. J. Oper. Res."},{"issue":"8","key":"5_CR11","doi-asserted-by":"publisher","first-page":"2143","DOI":"10.1080\/00207540600818286","volume":"46","author":"L Deroussi","year":"2008","unstructured":"Deroussi, L., Gourgand, M., Tchernev, N.: A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 46(8), 2143\u20132164 (2008)","journal-title":"Int. J. Prod. Res."},{"key":"5_CR12","unstructured":"Deroussi, L., Norre, S.: Simultaneous scheduling of machines and vehicles for the flexible job shop problem. In: International Conference on Metaheuristics and Nature Inspired Computing, pp. 1\u20132 (2010)"},{"issue":"6","key":"5_CR13","doi-asserted-by":"publisher","first-page":"1720","DOI":"10.1016\/j.asoc.2012.02.001","volume":"12","author":"R Erol","year":"2012","unstructured":"Erol, R., Sahin, C., Baykasoglu, A., Kaplanoglu, V.: A multi-agent based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing systems. Appl. Soft Comput. 12(6), 1720\u20131732 (2012)","journal-title":"Appl. Soft Comput."},{"key":"5_CR14","volume-title":"Multi-Agent Systems: An Introduction to Distributed Artificial Intelligence","author":"J Ferber","year":"1999","unstructured":"Ferber, J.: Multi-Agent Systems: An Introduction to Distributed Artificial Intelligence, 1st edn. Addison-Wesley Longman Publishing Co. Inc., Boston (1999)","edition":"1"},{"issue":"5","key":"5_CR15","doi-asserted-by":"publisher","first-page":"645","DOI":"10.1023\/B:JIMS.0000037714.56201.a3","volume":"15","author":"A Giret","year":"2004","unstructured":"Giret, A., Botti, V.: Holons and agents. J. Intell. Manuf. 15(5), 645\u2013659 (2004)","journal-title":"J. Intell. Manuf."},{"issue":"1","key":"5_CR16","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1016\/0305-0548(93)E0023-M","volume":"22","author":"F Glover","year":"1995","unstructured":"Glover, F., Kelly, J.P., Laguna, M.: Genetic algorithms and tabu search: hybrids for optimization. Comput. Oper. Res. 22(1), 111\u2013134 (1995)","journal-title":"Comput. Oper. Res."},{"issue":"1\u20132","key":"5_CR17","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1016\/S0166-218X(01)00273-6","volume":"119","author":"J Hurink","year":"2002","unstructured":"Hurink, J., Knust, S.: A tabu search algorithm for scheduling a single robot in a job-shop environment. Discrete Appl. Math. 119(1\u20132), 181\u2013203 (2002)","journal-title":"Discrete Appl. Math."},{"issue":"1","key":"5_CR18","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.ejor.2003.10.034","volume":"162","author":"J Hurink","year":"2005","unstructured":"Hurink, J., Knust, S.: Tabu search algorithms for job-shop problems with a single transport robot. Eur. J. Oper. Res. 162(1), 99\u2013111 (2005)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"5_CR19","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1007\/BF02289588","volume":"32","author":"SC Johnson","year":"1967","unstructured":"Johnson, S.C.: Hierarchical clustering schemes. Psychometrika 32(3), 241\u2013254 (1967)","journal-title":"Psychometrika"},{"key":"5_CR20","doi-asserted-by":"crossref","unstructured":"Jones, A., Rabelo, L.C.: Survey of job shop scheduling techniques. Technical report, National Institute of Standards and Technology, Gaithersburg, USA (1998)","DOI":"10.1002\/047134608X.W3352"},{"key":"5_CR21","volume-title":"The Ghost in the Machine","author":"A Koestler","year":"1967","unstructured":"Koestler, A.: The Ghost in the Machine, 1st edn. Hutchinson, London (1967)","edition":"1"},{"issue":"9\u201312","key":"5_CR22","doi-asserted-by":"publisher","first-page":"1079","DOI":"10.1007\/s00170-010-2784-2","volume":"52","author":"VR Komma","year":"2011","unstructured":"Komma, V.R., Jain, P.K., Mehta, N.K.: An approach for agent modeling in manufacturing on JADE reactive architecture. Int. J. Adv. Manuf. Technol. 52(9\u201312), 1079\u20131090 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"5_CR23","unstructured":"Lacomme, P., Larabi, M., Tchernev, N.: A disjunctive graph for the job-shop with several robots. In: Multidisciplinary International Conference on Scheduling: Theory and Applications, pp. 285\u2013292. MISTA, Paris, France (2007)"},{"issue":"1","key":"5_CR24","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.ijpe.2010.07.012","volume":"143","author":"P Lacomme","year":"2013","unstructured":"Lacomme, P., Larabi, M., Tchernev, N.: Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Econ. 143(1), 24\u201334 (2013)","journal-title":"Int. J. Prod. Econ."},{"key":"5_CR25","doi-asserted-by":"crossref","unstructured":"Lee, K., Yamakawa, T., Lee, K.M.: A genetic algorithm for general machine scheduling problems. In: Proceedings of the second IEEE international Conference on Knowledge-Based Intelligent Electronic Systems, pp. 60\u201366, April 1998","DOI":"10.1109\/KES.1998.725893"},{"key":"5_CR26","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1016\/S0167-5060(08)70821-5","volume":"4","author":"JK Lenstra","year":"1979","unstructured":"Lenstra, J.K., Kan, A.H.G.R.: Computational complexity of scheduling under precedence constraints. Ann. Discrete Math. 4, 121\u2013140 (1979)","journal-title":"Ann. Discrete Math."},{"issue":"2","key":"5_CR27","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1002\/net.3230110211","volume":"11","author":"JK Lenstra","year":"1981","unstructured":"Lenstra, J.K., Kan, A.H.G.R.: Complexity of vehicle routing and scheduling problems. Networks 11(2), 221\u2013227 (1981)","journal-title":"Networks"},{"issue":"1","key":"5_CR28","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1002\/(SICI)1099-1425(200001\/02)3:1<3::AID-JOS32>3.0.CO;2-Y","volume":"3","author":"M Mastrolilli","year":"2000","unstructured":"Mastrolilli, M., Gambardella, L.: Effective neighbourhood functions for the flexible job shop problem. J. Sched. 3(1), 3\u201320 (2000)","journal-title":"J. Sched."},{"key":"5_CR29","series-title":"International series in management","volume-title":"Industrial Scheduling","author":"JF Muth","year":"1963","unstructured":"Muth, J.F., Thompson, G.L.: Industrial Scheduling. International series in management. Prentice-Hall, Englewood Cliffs (1963)"},{"issue":"1","key":"5_CR30","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s40092-017-0204-z","volume":"14","author":"HE Nouri","year":"2017","unstructured":"Nouri, H.E., Driss, O.B., Gh\u00e9dira, K.: Solving the flexible job shop problem by hybrid metaheuristics-based multiagent model. J. Ind. Eng. Int. 14(1), 1\u201314 (2017)","journal-title":"J. Ind. Eng. Int."},{"key":"5_CR31","unstructured":"Pundit, R., Palekar, U.: Job shop scheduling with explicit material handling considerations. Technical report, Univ. of Illinois at Urbana-Champaign, Dept. of M. and I.E (1990)"},{"key":"5_CR32","unstructured":"Raman, N., Talbot, F.B., Rachamadgu, R.V.: Simultaneous scheduling of machines and material handling devices in automated manufacturing. In: Proceedings of the 2nd ORSA\/TIMS Conference on Flexible Manufacturing Systems, pp. 455\u2013466 (1986)"},{"issue":"5\u20136","key":"5_CR33","doi-asserted-by":"publisher","first-page":"602","DOI":"10.1007\/s00170-005-0223-6","volume":"31","author":"BSP Reddy","year":"2006","unstructured":"Reddy, B.S.P., Rao, C.S.P.: A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS. Int. J. Adv. Manuf. Technol. 31(5\u20136), 602\u2013613 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"8","key":"5_CR34","doi-asserted-by":"publisher","first-page":"2269","DOI":"10.1080\/002075498192896","volume":"36","author":"AI Sonmez","year":"1998","unstructured":"Sonmez, A.I., Baykasoglu, A.: A new dynamic programming formulation of (n$$\\times $$\u00d7m) flow shop sequencing problems with due dates. Int. J. Prod. Res. 36(8), 2269\u20132283 (1998)","journal-title":"Int. J. Prod. Res."},{"key":"5_CR35","unstructured":"Storn, R., Price, K.: Differential evolution: A simple and efficient adaptive scheme for global optimization over continuous spaces. Technical report, International Computer Science Institute, Berkeley (1995)"},{"issue":"3","key":"5_CR36","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/S0305-0548(96)00061-5","volume":"24","author":"G Ulusoy","year":"1997","unstructured":"Ulusoy, G., Erifolu, F.S., Bilge, U.: A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Comput. Oper. Res. 24(3), 335\u2013351 (1997)","journal-title":"Comput. Oper. Res."},{"issue":"7","key":"5_CR37","doi-asserted-by":"publisher","first-page":"1713","DOI":"10.1016\/j.cor.2011.10.007","volume":"39","author":"Q Zhang","year":"2012","unstructured":"Zhang, Q., Manier, H., Manier, M.A.: A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times. Comput. Oper. Res. 39(7), 1713\u20131723 (2012)","journal-title":"Comput. Oper. Res."},{"issue":"4","key":"5_CR38","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1080\/00207543.2013.828164","volume":"52","author":"Q Zhang","year":"2014","unstructured":"Zhang, Q., Manier, H., Manier, M.A.: A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints. Int. J. Prod. Res. 52(4), 985\u20131002 (2014)","journal-title":"Int. J. Prod. Res."}],"container-title":["Lecture Notes in Computer Science","Transactions on Computational Collective Intelligence XXVIII"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-78301-7_5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,17]],"date-time":"2019-10-17T04:30:03Z","timestamp":1571286603000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-78301-7_5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319783000","9783319783017"],"references-count":38,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-78301-7_5","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018]]}}}