{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,16]],"date-time":"2026-02-16T09:13:39Z","timestamp":1771233219395,"version":"3.50.1"},"publisher-location":"Cham","reference-count":34,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319914459","type":"print"},{"value":"9783319914466","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,5,27]],"date-time":"2018-05-27T00:00:00Z","timestamp":1527379200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-319-91446-6_46","type":"book-chapter","created":{"date-parts":[[2018,5,26]],"date-time":"2018-05-26T00:54:03Z","timestamp":1527296043000},"page":"492-503","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Route Risk Assessment for Road Transport Companies"],"prefix":"10.1007","author":[{"given":"Agnieszka","family":"Tubis","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,5,27]]},"reference":[{"key":"46_CR1","doi-asserted-by":"publisher","first-page":"324","DOI":"10.1016\/j.ssci.2015.06.022","volume":"79","author":"A Ambituuni","year":"2015","unstructured":"Ambituuni, A., Amezaga, J.M., Werner, D.: Risk assessment of petroleum product transportation by road: a framework for regulatory improvement. Saf. Sci. 79, 324\u2013335 (2015)","journal-title":"Saf. Sci."},{"key":"46_CR2","doi-asserted-by":"publisher","first-page":"4209","DOI":"10.1016\/j.trpro.2016.05.392","volume":"14","author":"J Ambros","year":"2016","unstructured":"Ambros, J., Havr\u00e1nek, P., Valentov\u00e1, V., Krivankova, Z., Striegler, R.: Identification of hazardous locations in regional road network \u2013 comparison of reactive and proactive approaches. Transp. Res. Procedia 14, 4209\u20134217 (2016)","journal-title":"Transp. Res. Procedia"},{"key":"46_CR3","doi-asserted-by":"publisher","first-page":"515","DOI":"10.1111\/j.0272-4332.2004.00455.x","volume":"24","author":"GE Apostolakis","year":"2004","unstructured":"Apostolakis, G.E.: How useful is quantitative risk assessment? Risk Anal. 24, 515\u2013520 (2004)","journal-title":"Risk Anal."},{"key":"46_CR4","doi-asserted-by":"publisher","first-page":"798","DOI":"10.1016\/j.ssci.2008.10.008","volume":"47","author":"T Aven","year":"2009","unstructured":"Aven, T.: Perspectives on risk in a decision-making context \u2013 review and discussion. Saf. Sci. 47, 798\u2013806 (2009)","journal-title":"Saf. Sci."},{"key":"46_CR5","doi-asserted-by":"publisher","first-page":"623","DOI":"10.1016\/j.ress.2010.01.011","volume":"95","author":"T Aven","year":"2010","unstructured":"Aven, T.: On how to define, understand and describe risk. Reliab. Eng. Syst. Saf. 95, 623\u2013631 (2010)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"46_CR6","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/j.ress.2011.11.006","volume":"99","author":"T Aven","year":"2012","unstructured":"Aven, T.: The risk concept\u2014historical and recent development trends. Reliab. Eng. Syst. Saf. 99, 33\u201344 (2012)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"7","key":"46_CR7","doi-asserted-by":"publisher","first-page":"1164","DOI":"10.1111\/risa.12132","volume":"34","author":"T Aven","year":"2014","unstructured":"Aven, T., Zio, E.: Foundational issues in risk analysis. Risk Anal. 34(7), 1164\u20131172 (2014)","journal-title":"Risk Anal."},{"key":"46_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2015.12.023","volume":"253","author":"T Aven","year":"2016","unstructured":"Aven, T.: Risk assessment and risk management: review of recent advances on their foundation. Eur. J. Oper. Res. 253, 1\u201313 (2016)","journal-title":"Eur. J. Oper. Res."},{"key":"46_CR9","doi-asserted-by":"publisher","first-page":"258","DOI":"10.1016\/j.jhazmat.2009.08.078","volume":"173","author":"S Bajpai","year":"2010","unstructured":"Bajpai, S., Sachdeva, A., Gupta, J.P.: Security risk assessment: applying the concepts of fuzzy logic. J. Hazard. Mater. 173, 258\u2013264 (2010)","journal-title":"J. Hazard. Mater."},{"key":"46_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ssci.2016.07.013","volume":"91","author":"I Benekos","year":"2017","unstructured":"Benekos, I., Diamantidis, D.: On risk assessment and risk acceptance of dangerous goods transportation through road tunnels in Greece. Saf. Sci. 91, 1\u201310 (2017)","journal-title":"Saf. Sci."},{"key":"46_CR11","first-page":"21","volume":"813","author":"H Bronk","year":"2014","unstructured":"Bronk, H.: Features and costs structure in transport allowing for decision making. Zesz. Nauk. Uniw. Szczec. 813, 21\u201339 (2014)","journal-title":"Zesz. Nauk. Uniw. Szczec."},{"key":"46_CR12","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1016\/j.sbspro.2012.09.870","volume":"53","author":"C Caliendo","year":"2012","unstructured":"Caliendo, C., De Guglielmo, M.L.: Accident rates in road tunnels and social cost evaluation. Procedia Soc. Behav. Sci. 53, 166\u2013177 (2012)","journal-title":"Procedia Soc. Behav. Sci."},{"issue":"1","key":"46_CR13","doi-asserted-by":"publisher","first-page":"116","DOI":"10.1111\/risa.12594","volume":"37","author":"C Caliendo","year":"2017","unstructured":"Caliendo, C., De Guglielmo, M.L.: Quantitative risk analysis on the transport of dangerous goods through a bi-directional road tunnel. Risk Anal. 37(1), 116\u2013129 (2017)","journal-title":"Risk Anal."},{"key":"46_CR14","doi-asserted-by":"publisher","first-page":"368","DOI":"10.1016\/j.psep.2012.05.011","volume":"90","author":"UK Chakrabarti","year":"2012","unstructured":"Chakrabarti, U.K., Parikh, J.K.: Applying HAZAN methodology to hazmat transportation risk assessment. Process Saf. Environ. Prot. 90, 368\u2013375 (2012)","journal-title":"Process Saf. Environ. Prot."},{"key":"46_CR15","doi-asserted-by":"publisher","first-page":"2890","DOI":"10.1016\/j.trpro.2016.05.407","volume":"14","author":"A Conca","year":"2016","unstructured":"Conca, A., Ridella, Ch., Sapori, E.: A risk assessment for road transportation of dangerous goods: a routing solution. Transp. Res. Procedia 14, 2890\u20132899 (2016)","journal-title":"Transp. Res. Procedia"},{"key":"46_CR16","unstructured":"Douglas, J., Serrano, J.-J., Coraboeuf, D., Bouc, O., Arnal, C., Robida, F., Modaressi, H., Atkinson, M., Vowles, G., Holt, I.: Risk assessment for the road network in the French-Italian border region using web services. In: First European Conference on Earthquake Engineering and Seismology (a joint event of the 13th ECEE & 30th General Assembly of the ESC), September 2006, Geneve, Switzerland, Paper number 827 (2006)"},{"key":"46_CR17","doi-asserted-by":"publisher","first-page":"1505","DOI":"10.1016\/j.ijrefrig.2009.01.020","volume":"32","author":"A East","year":"2009","unstructured":"East, A., Smale, N., Kang, S.: A method for quantitative risk assessment of temperature control in insulated boxes. Int. J. Refrig. 32, 1505\u20131513 (2009)","journal-title":"Int. J. Refrig."},{"key":"46_CR18","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/j.ress.2015.01.025","volume":"138","author":"F Goerlandt","year":"2015","unstructured":"Goerlandt, F., Montewka, J.: Maritime transportation risk analysis: review and analysis in light of some foundational issues. Reliab. Eng. Syst. Saf. 138, 115\u2013134 (2015)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"46_CR19","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/j.ijmm.2005.12.002","volume":"296","author":"J Hampel","year":"2006","unstructured":"Hampel, J.: Different concepts of risk \u2013 a challenge for risk communication. Int. J. Med. Microbiol. 296, 5\u201310 (2006)","journal-title":"Int. J. Med. Microbiol."},{"key":"46_CR20","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1016\/j.omega.2014.10.004","volume":"52","author":"I Heckmann","year":"2015","unstructured":"Heckmann, I., Comes, T., Nickel, S.: A critical review on supply chain risk \u2013 definition, measure and modelling. Omega 52, 119\u2013132 (2015)","journal-title":"Omega"},{"key":"46_CR21","doi-asserted-by":"publisher","first-page":"2101","DOI":"10.1016\/j.trpro.2016.05.225","volume":"14","author":"Ch Jurewicz","year":"2016","unstructured":"Jurewicz, Ch., Excel, R.: Application of a crash-predictive risk assessment model to prioritise road safety investment in Australia. Transp. Res. Procedia 14, 2101\u20132110 (2016)","journal-title":"Transp. Res. Procedia"},{"key":"46_CR22","doi-asserted-by":"publisher","first-page":"407","DOI":"10.1111\/j.1539-6924.1997.tb00881.x","volume":"17","author":"S Kaplan","year":"1997","unstructured":"Kaplan, S.: The words of risk analysis. Risk Anal. 17, 407\u2013417 (1997)","journal-title":"Risk Anal."},{"key":"46_CR23","doi-asserted-by":"crossref","unstructured":"Kierzkowski, A., Kisiel, T.: Simulation model of security control system functioning: a case study of the Wroclaw Airport terminal. J. Air Transp. Manag. (2016)","DOI":"10.1016\/j.jairtraman.2016.09.008"},{"key":"46_CR24","first-page":"137","volume":"1","author":"M M\u0142y\u0144czak","year":"2011","unstructured":"M\u0142y\u0144czak, M., Nowakowski, T., Valis, D.: How to manage risks? The normative approach. Probl. Eksploat. 1, 137\u2013147 (2011). (in Polish)","journal-title":"Probl. Eksploat."},{"key":"46_CR25","unstructured":"Mokrzyszczak, H.: \u0141adunkoznawstwo. Technologia zabezpieczania \u0142adunk\u00f3w w transporcie. WKi\u0141, Warszawa (1974)"},{"key":"46_CR26","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1016\/j.amar.2016.10.002","volume":"12","author":"I Norros","year":"2016","unstructured":"Norros, I., Kuusela, P., Innamaa, S., Pilli-Sihvola, E., Rajam\u00e4ki, R.: The Palm distribution of traffic conditions and its application to accident risk assessment. Anal. Methods Accid. Res. 12, 48\u201365 (2016)","journal-title":"Anal. Methods Accid. Res."},{"key":"46_CR27","volume-title":"Logistic Processes and Projects","year":"2008","unstructured":"Nowosielski, S. (ed.): Logistic Processes and Projects. Wydawnictwo UE we Wroc\u0142awiu, Wroclaw (2008). (in Polish)"},{"key":"46_CR28","unstructured":"PN-72\/M-78000: Transport \u2013 okre\u015blenia podstawowe i podzia\u0142. PKN, Warsaw (1972)"},{"key":"46_CR29","unstructured":"PN-ISO 31000:2010: Risk management \u2013 principles and guide-lines. PKN, Warsaw (2010)"},{"key":"46_CR30","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1201\/b17399-46","volume-title":"Safety and Reliability: Methodology and Applications","author":"F Restel","year":"2014","unstructured":"Restel, F.J.: The Markov reliability and safety model of the railway transportation system. In: Safety and Reliability: Methodology and Applications - Proceedings of the European Safety and Reliability Conference, ESREL 2014, pp. 303\u2013311. Taylor and Francis (2015)"},{"issue":"3","key":"46_CR31","doi-asserted-by":"publisher","first-page":"359","DOI":"10.2478\/v10174-010-0022-1","volume":"22","author":"A Szymanek","year":"2010","unstructured":"Szymanek, A.: Conception of \u201c4 Goals and 3 Levels\u201d in risk management in road transport systems. Arch. Transp. 22(3), 359\u2013375 (2010)","journal-title":"Arch. Transp."},{"key":"46_CR32","first-page":"450","volume-title":"Advances in Dependability Engineering of Complex Systems","author":"Agnieszka Tubis","year":"2017","unstructured":"Tubis, A., Werbi\u0144ska-Wojciechowska, S.: The scope of the collected data for a holistic risk assessment performance in the road freight transport companies. In: Zamojski, W. (ed.) Advances in Dependability Engineering of Complex Systems: Proceedings of the Twelfth International Conference on Dependability and Complex Systems DepCoS-RELCOMEX, 2\u20136 July 2017, Brun\u00f3w, Poland, pp. 450\u2013463 (2018)"},{"key":"46_CR33","first-page":"1528","volume":"46","author":"H Tu","year":"2012","unstructured":"Tu, H., Li, H., van Lint, H., van Zuylen, H.: Modeling travel time reliability of freeways using risk assessment techniques. Transp. Res. Part A 46, 1528\u20131540 (2012)","journal-title":"Transp. Res. Part A"},{"key":"46_CR34","doi-asserted-by":"crossref","unstructured":"Zajac, M., Swieboda, J.: Process hazard analysis of the selected process in intermodal transport. In: 2015 International Conference on Military Technologies (ICMT), pp. 1\u20137. IEEE (2015)","DOI":"10.1109\/MILTECHS.2015.7153698"}],"container-title":["Advances in Intelligent Systems and Computing","Contemporary Complex Systems and Their Dependability"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-91446-6_46","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,18]],"date-time":"2019-10-18T12:07:33Z","timestamp":1571400453000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-91446-6_46"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,5,27]]},"ISBN":["9783319914459","9783319914466"],"references-count":34,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-91446-6_46","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"value":"2194-5357","type":"print"},{"value":"2194-5365","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,5,27]]}}}