{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,14]],"date-time":"2026-04-14T04:31:56Z","timestamp":1776141116308,"version":"3.50.1"},"publisher-location":"Cham","reference-count":50,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319916347","type":"print"},{"value":"9783319916354","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-91635-4_18","type":"book-chapter","created":{"date-parts":[[2018,5,18]],"date-time":"2018-05-18T09:04:46Z","timestamp":1526634286000},"page":"336-358","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Derivation of Minimum Required Model for Augmented Reality Based Stepwise Construction Assembly Control"],"prefix":"10.1007","author":[{"given":"Nicolas","family":"Jeanclos","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohammad-Mahdi","family":"Sharif","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shang Kun","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Caroline","family":"Kwiatek","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carl","family":"Haas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,5,19]]},"reference":[{"key":"18_CR1","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1016\/j.autcon.2013.09.006","volume":"39","author":"L Jaillon","year":"2014","unstructured":"Jaillon, L., Poon, C.S.: Life cycle design and prefabrication in buildings: a review and case studies in Hong Kong. Autom. Constr. 39, 195\u2013202 (2014)","journal-title":"Autom. Constr."},{"issue":"9","key":"18_CR2","doi-asserted-by":"publisher","first-page":"953","DOI":"10.1080\/01446190802259043","volume":"26","author":"L Jaillon","year":"2008","unstructured":"Jaillon, L., Poon, C.S.: Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study. Constr. Manag. Econ. 26(9), 953\u2013966 (2008)","journal-title":"Constr. Manag. Econ."},{"key":"18_CR3","doi-asserted-by":"publisher","first-page":"012020","DOI":"10.1088\/1757-899X\/183\/1\/012020","volume":"183","author":"C Gnanavel","year":"2017","unstructured":"Gnanavel, C., Saravanan, R., Chandrasekaran, M., Jayakanth, J.J.: Improvement of productivity in TIG welding plant by equipment design in orbit. IOP Conf. Ser. Mater. Sci. Eng. 183(1) (2017). 012020","journal-title":"IOP Conference Series: Materials Science and Engineering"},{"key":"18_CR4","unstructured":"Fatal occupational injuries by selected characteristics, 2003\u20132014 (2003)"},{"issue":"11","key":"18_CR5","doi-asserted-by":"publisher","first-page":"1331","DOI":"10.1061\/(ASCE)CO.1943-7862.0000544","volume":"138","author":"W Pan","year":"2012","unstructured":"Pan, W., Gibb, A.G., Dainty, A.R.: Strategies for integrating the use of off-site production technologies in house building. J. Constr. Eng. Manag. 138(11), 1331\u20131340 (2012)","journal-title":"J. Constr. Eng. Manag."},{"issue":"9","key":"18_CR6","doi-asserted-by":"publisher","first-page":"04016043","DOI":"10.1061\/(ASCE)CO.1943-7862.0001157","volume":"142","author":"Paul M. Goodrum","year":"2016","unstructured":"Goodrum, P.M., Miller, J., Sweany, J., Alruwaythi, O.: Influence of the format of engineering information and spatial cognition on craft-worker performance.\u00a0J. Constr. Eng. Manag. 142(9) (2016). 0401604","journal-title":"Journal of Construction Engineering and Management"},{"key":"18_CR7","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1016\/j.istruc.2015.03.003","volume":"3","author":"Mahdi Safa","year":"2015","unstructured":"Safa, M., Shahi, A., Nahangi, M., Haas, C., Noori, H.: Automating measurement process to improve quality management for piping fabrication. In:\u00a0Structures, vol. 3, pp. 71\u201380. Elsevier (2015)","journal-title":"Structures"},{"key":"18_CR8","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1016\/j.autcon.2016.06.016","volume":"70","author":"T Omar","year":"2016","unstructured":"Omar, T., Nehdi, M.L.: Data acquisition technologies for construction progress tracking. Autom. Constr. 70, 143\u2013155 (2016)","journal-title":"Autom. Constr."},{"key":"18_CR9","unstructured":"Sharif, M.M., Nahangi, M., Haas, C., West, J., Ibrahim, M.: A preliminary investigation of the applicability of portable sensors for fabrication and installation control of industrial assemblies. In: Canadian Society for Civil Engineering (2016)"},{"key":"18_CR10","unstructured":"US Census Bureau, Construction Spending. https:\/\/www.census.gov\/construction\/c30\/c30index.html"},{"key":"18_CR11","unstructured":"Patterson, L., Ledbetter, W.B.: The cost of quality: a management tool. In:\u00a0Excellence in the Constructed Project, pp. 100\u2013105. ASCE (1989)"},{"issue":"2","key":"18_CR12","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1016\/j.autcon.2005.01.008","volume":"15","author":"B Akinci","year":"2006","unstructured":"Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K.: A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 15(2), 124\u2013138 (2006)","journal-title":"Autom. Constr."},{"issue":"6","key":"18_CR13","doi-asserted-by":"publisher","first-page":"04016035","DOI":"10.1061\/(ASCE)CP.1943-5487.0000604","volume":"30","author":"Fernanda Leite","year":"2016","unstructured":"Leite, F., Cho, Y., Behzadan, A.H., Lee, S., Choe, S., Fang, Y., Hwang, S.: Visualization, information modeling, and simulation: grand challenges in the construction industry.\u00a0J. Comput. Civ. Eng.\u00a030(6) (2016). 04016035","journal-title":"Journal of Computing in Civil Engineering"},{"key":"18_CR14","doi-asserted-by":"crossref","unstructured":"Holzer, D.: Are you talking to me? Why BIM alone is not the answer (2007)","DOI":"10.5130\/aab.v"},{"key":"18_CR15","doi-asserted-by":"publisher","first-page":"64","DOI":"10.1016\/j.autcon.2014.05.009","volume":"46","author":"L Chen","year":"2014","unstructured":"Chen, L., Luo, H.: A BIM-based construction quality management model and its applications. Autom. Constr. 46, 64\u201373 (2014)","journal-title":"Autom. Constr."},{"issue":"3","key":"18_CR16","doi-asserted-by":"publisher","first-page":"218","DOI":"10.1080\/15578771.2013.865683","volume":"11","author":"CB Farnsworth","year":"2015","unstructured":"Farnsworth, C.B., Beveridge, S., Miller, K.R., Christofferson, J.P.: Application, advantages, and methods associated with using BIM in commercial construction. Int. J. Constr. Educ. Res. 11(3), 218\u2013236 (2015)","journal-title":"Int. J. Constr. Educ. Res."},{"issue":"4","key":"18_CR17","doi-asserted-by":"publisher","first-page":"206","DOI":"10.1177\/003754979907300402","volume":"73","author":"MA Garcia","year":"1999","unstructured":"Garcia, M.A., Llanos, D.R., De Prada, C.: A configurable ACSL-based interface generator for simulated systems. Simulation 73(4), 206\u2013212 (1999)","journal-title":"Simulation"},{"key":"18_CR18","doi-asserted-by":"crossref","unstructured":"Lee, J., Lee, K., Nam, B., Wu, Y.: IoT Platform-based iAR: a prototype for plant O&M applications. In:\u00a0IEEE International Symposium on Mixed and Augmented Reality (ISMAR-Adjunct),\u00a0pp. 149\u2013150. IEEE (2016)","DOI":"10.1109\/ISMAR-Adjunct.2016.0063"},{"key":"18_CR19","doi-asserted-by":"crossref","unstructured":"Fung, M., Fung, A., Fung, R.H., Fung, P.K.: The advantage of using a file data transfer method in a plant design. In:\u00a0ASME 2014 Pressure Vessels and Piping Conference, p. V003T03A021. American Society of Mechanical Engineers (2014)","DOI":"10.1115\/PVP2014-28044"},{"issue":"2","key":"18_CR20","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1006\/cviu.1995.1017","volume":"61","author":"TS Newman","year":"1995","unstructured":"Newman, T.S., Jain, A.K.: A survey of automated visual inspection. Comput. Vis. Image Underst. 61(2), 231\u2013262 (1995)","journal-title":"Comput. Vis. Image Underst."},{"key":"18_CR21","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1016\/j.autcon.2014.05.014","volume":"49","author":"F Bosch\u00e9","year":"2015","unstructured":"Bosch\u00e9, F., Ahmed, M., Turkan, Y., Haas, C.T., Haas, R.: The value of integrating scan-to-BIM and scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: the case of cylindrical MEP components. Autom. Constr. 49, 201\u2013213 (2015)","journal-title":"Autom. Constr."},{"issue":"4","key":"18_CR22","doi-asserted-by":"publisher","first-page":"04015067","DOI":"10.1061\/(ASCE)CP.1943-5487.0000545","volume":"30","author":"Mohammad Nahangi","year":"2016","unstructured":"Nahangi, M., Czerniawski, T., Haas, C.T., Walbridge, S., West, J.: Parallel systems and structural frames realignment planning and actuation strategy.\u00a0J. Comput. Civ. Eng.\u00a030(4) (2015). 04015067","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"11","key":"18_CR23","doi-asserted-by":"publisher","first-page":"893","DOI":"10.1111\/mice.12306","volume":"32","author":"MM Sharif","year":"2017","unstructured":"Sharif, M.M., Nahangi, M., Haas, C., West, J.: Automated model-based finding of 3D objects in cluttered construction point cloud models. Comput. Aided Civ. Infrastruct. Eng. 32(11), 893\u2013908 (2017)","journal-title":"Comput. Aided Civ. Infrastruct. Eng."},{"issue":"3\u20134","key":"18_CR24","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s10846-014-0116-8","volume":"79","author":"J Wang","year":"2015","unstructured":"Wang, J., Sun, W., Shou, W., Wang, X., Wu, C., Chong, H.Y., Sun, C.: Integrating BIM and LiDAR for real-time construction quality control. J. Intell. Robot. Syst. 79(3\u20134), 417 (2015)","journal-title":"J. Intell. Robot. Syst."},{"issue":"4","key":"18_CR25","doi-asserted-by":"publisher","first-page":"889","DOI":"10.1016\/j.aei.2012.07.004","volume":"26","author":"P Tang","year":"2012","unstructured":"Tang, P., Akinci, B.: Automatic execution of workflows on laser-scanned data for extracting bridge surveying goals. Adv. Eng. Inform. 26(4), 889\u2013903 (2012)","journal-title":"Adv. Eng. Inform."},{"issue":"1","key":"18_CR26","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1016\/j.aei.2009.08.006","volume":"24","author":"F Bosch\u00e9","year":"2010","unstructured":"Bosch\u00e9, F.: Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction. Adv. Eng. Inform. 24(1), 107\u2013118 (2010)","journal-title":"Adv. Eng. Inform."},{"issue":"2","key":"18_CR27","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1016\/S0262-8856(02)00152-X","volume":"21","author":"EN Malamas","year":"2003","unstructured":"Malamas, E.N., Petrakis, E.G., Zervakis, M., Petit, L., Legat, J.D.: A survey on industrial vision systems, applications and tools. Image Vis. Comput. 21(2), 171\u2013188 (2003)","journal-title":"Image Vis. Comput."},{"issue":"4","key":"18_CR28","doi-asserted-by":"publisher","first-page":"05014004","DOI":"10.1061\/(ASCE)CP.1943-5487.0000343","volume":"28","author":"Fr\u00e9d\u00e9ric Bosch\u00e9","year":"2014","unstructured":"Bosch\u00e9, F., Guillemet, A., Turkan, Y., Haas, C.T., Haas, R.: Tracking the built status of MEP works: assessing the value of a scan-vs-BIM system.\u00a0J. Comput. Civ. Eng.\u00a028(4) (2013). 05014004","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"6","key":"18_CR29","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(311)","volume":"23","author":"F Bosch\u00e9","year":"2009","unstructured":"Bosch\u00e9, F., Haas, C.T., Akinci, B.: Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control. J. Comput. Civ. Eng. 23(6), 311\u2013318 (2009)","journal-title":"J. Comput. Civ. Eng."},{"issue":"12","key":"18_CR30","doi-asserted-by":"publisher","first-page":"1099","DOI":"10.1061\/(ASCE)CO.1943-7862.0000371","volume":"137","author":"M Golparvar-Fard","year":"2011","unstructured":"Golparvar-Fard, M., Pe\u00f1a-Mora, F., Savarese, S.: Integrated sequential as-built and as-planned representation with D 4 AR tools in support of decision-making tasks in the AEC\/FM industry. J. Constr. Eng. Manag. 137(12), 1099\u20131116 (2011)","journal-title":"J. Constr. Eng. Manag."},{"key":"18_CR31","first-page":"486","volume":"2011","author":"P Tang","year":"2011","unstructured":"Tang, P., Anil, E.B., Akinci, B., Huber, D.: Efficient and effective quality assessment of as-is building information models and 3D laser-scanned data. Comput. Civ. Eng. 2011, 486\u2013493 (2011)","journal-title":"Comput. Civ. Eng."},{"key":"18_CR32","doi-asserted-by":"publisher","first-page":"414","DOI":"10.1016\/j.autcon.2011.10.003","volume":"22","author":"Y Turkan","year":"2012","unstructured":"Turkan, Y., Bosch\u00e9, F., Haas, C.T., Haas, R.: Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22, 414\u2013421 (2012)","journal-title":"Autom. Constr."},{"key":"18_CR33","doi-asserted-by":"publisher","first-page":"507","DOI":"10.1016\/j.autcon.2013.06.003","volume":"35","author":"EB Anil","year":"2013","unstructured":"Anil, E.B., Tang, P., Akinci, B., Huber, D.: Deviation analysis method for the assessment of the quality of the as-is building information models generated from point cloud data. Autom. Constr. 35, 507\u2013516 (2013)","journal-title":"Autom. Constr."},{"issue":"4","key":"18_CR34","doi-asserted-by":"publisher","first-page":"456","DOI":"10.1016\/j.aei.2010.06.006","volume":"24","author":"I Brilakis","year":"2010","unstructured":"Brilakis, I., Lourakis, M., Sacks, R., Savarese, S., Christodoulou, S., Teizer, J., Makhmalbaf, A.: Toward automated generation of parametric BIMs based on hybrid video and laser scanning data. Adv. Eng. Inform. 24(4), 456\u2013465 (2010)","journal-title":"Adv. Eng. Inform."},{"issue":"7","key":"18_CR35","doi-asserted-by":"publisher","first-page":"829","DOI":"10.1016\/j.autcon.2010.06.007","volume":"19","author":"P Tang","year":"2010","unstructured":"Tang, P., Huber, D., Akinci, B., Lipman, R., Lytle, A.: Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques. Autom. Constr. 19(7), 829\u2013843 (2010)","journal-title":"Autom. Constr."},{"key":"18_CR36","doi-asserted-by":"publisher","first-page":"116","DOI":"10.1016\/j.autcon.2012.06.003","volume":"28","author":"A Bhatla","year":"2012","unstructured":"Bhatla, A., Choe, S.Y., Fierro, O., Leite, F.: Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras. Autom. Constr. 28, 116\u2013127 (2012)","journal-title":"Autom. Constr."},{"key":"18_CR37","doi-asserted-by":"publisher","first-page":"96","DOI":"10.1016\/j.autcon.2013.12.003","volume":"40","author":"X Wang","year":"2014","unstructured":"Wang, X., Truijens, M., Hou, L., Wang, Y., Zhou, Y.: Integrating augmented reality with building information modeling: onsite construction process controlling for liquefied natural gas industry. Autom. Constr. 40, 96\u2013105 (2014)","journal-title":"Autom. Constr."},{"key":"18_CR38","doi-asserted-by":"crossref","unstructured":"Hou, L., Wang, X.: Experimental framework for evaluating cognitive workload of using AR system for general assembly task. In:\u00a0Proceedings of the 28th International Symposium on Automation and Robotics in Construction (2011)","DOI":"10.22260\/ISARC2011\/0117"},{"issue":"1","key":"18_CR39","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1016\/j.cirp.2013.03.095","volume":"62","author":"S Makris","year":"2013","unstructured":"Makris, S., Pintzos, G., Rentzos, L., Chryssolouris, G.: Assembly support using AR technology based on automatic sequence generation. CIRP Ann. Manuf. Technol. 62(1), 9\u201312 (2013)","journal-title":"CIRP Ann. Manuf. Technol."},{"issue":"3","key":"18_CR40","doi-asserted-by":"publisher","first-page":"406","DOI":"10.1016\/j.aei.2016.05.004","volume":"30","author":"X Wang","year":"2016","unstructured":"Wang, X., Ong, S.K., Nee, A.Y.C.: Multi-modal augmented-reality assembly guidance based on bare-hand interface. Adv. Eng. Inform. 30(3), 406\u2013421 (2016)","journal-title":"Adv. Eng. Inform."},{"key":"18_CR41","doi-asserted-by":"crossref","unstructured":"Aiteanu, D., Hillers, B., Graser, A.: A step forward in manual welding: demonstration of augmented reality helmet. In: Proceedings of the Second IEEE and ACM International Symposium on Mixed and Augmented Reality, pp. 309\u2013310. IEEE (2003)","DOI":"10.1109\/ISMAR.2003.1240734"},{"key":"18_CR42","doi-asserted-by":"crossref","unstructured":"Schwerdtfeger, B., Pustka, D., Hofhauser, A., Klinker, G.: Using laser projectors for augmented reality. In:\u00a0Proceedings of the ACM Symposium on Virtual Reality Software and Technology, pp. 134\u2013137. ACM (2008)","DOI":"10.1145\/1450579.1450608"},{"issue":"9","key":"18_CR43","doi-asserted-by":"publisher","first-page":"1186","DOI":"10.1016\/j.compind.2013.05.002","volume":"64","author":"J Molleda","year":"2013","unstructured":"Molleda, J., Usamentiaga, R., Garc\u00eda, D.F., Bulnes, F.G., Espina, A., Dieye, B., Smith, L.N.: An improved 3D imaging system for dimensional quality inspection of rolled products in the metal industry. Comput. Ind. 64(9), 1186\u20131200 (2013)","journal-title":"Comput. Ind."},{"key":"18_CR44","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.autcon.2014.01.004","volume":"41","author":"S Siebert","year":"2014","unstructured":"Siebert, S., Teizer, J.: Mobile 3D mapping for surveying earthwork projects using an Unmanned Aerial Vehicle (UAV) system. Autom. Constr. 41, 1\u201314 (2014)","journal-title":"Autom. Constr."},{"issue":"3","key":"18_CR45","doi-asserted-by":"publisher","first-page":"05016001","DOI":"10.1061\/(ASCE)ME.1943-5479.0000422","volume":"32","author":"Javier Irizarry","year":"2016","unstructured":"Irizarry, J., Costa, D.B.: Exploratory study of potential applications of unmanned aerial systems for construction management tasks.\u00a0J. Manag. Eng.\u00a032(3) (2016). 05016001","journal-title":"Journal of Management in Engineering"},{"issue":"2","key":"18_CR46","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/j.aei.2015.01.012","volume":"29","author":"H Fathi","year":"2015","unstructured":"Fathi, H., Dai, F., Lourakis, M.: Automated as-built 3D reconstruction of civil infrastructure using computer vision: achievements, opportunities, and challenges. Adv. Eng. Inform. 29(2), 149\u2013161 (2015)","journal-title":"Adv. Eng. Inform."},{"issue":"8","key":"18_CR47","doi-asserted-by":"publisher","first-page":"1143","DOI":"10.1016\/j.autcon.2011.04.016","volume":"20","author":"M Golparvar-Fard","year":"2011","unstructured":"Golparvar-Fard, M., Bohn, J., Teizer, J., Savarese, S., Pe\u00f1a-Mora, F.: Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques. Autom. Constr. 20(8), 1143\u20131155 (2011)","journal-title":"Autom. Constr."},{"issue":"11","key":"18_CR48","doi-asserted-by":"publisher","first-page":"1331","DOI":"10.1139\/L08-082","volume":"35","author":"C Kim","year":"2008","unstructured":"Kim, C., Son, H., Kim, H., Han, S.H.: Applicability of flash laser distance and ranging to three-dimensional spatial information acquisition and modeling on a construction site. Can. J. Civ. Eng. 35(11), 1331\u20131341 (2008)","journal-title":"Can. J. Civ. Eng."},{"key":"18_CR49","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.autcon.2014.04.012","volume":"45","author":"KF Chien","year":"2014","unstructured":"Chien, K.F., Wu, Z.H., Huang, S.C.: Identifying and assessing critical risk factors for BIM projects: empirical study. Automation in Construction 45, 1\u201315 (2014)","journal-title":"Automation in Construction"},{"issue":"1","key":"18_CR50","doi-asserted-by":"publisher","first-page":"327","DOI":"10.1112\/plms\/s2_14.1.327","volume":"2","author":"GB Jeffery","year":"1915","unstructured":"Jeffery, G.B.: On the steady rotation of a solid of revolution in a viscous fluid. Proc. Lond. Math. Soc. 2(1), 327\u2013338 (1915)","journal-title":"Proc. Lond. Math. Soc."}],"container-title":["Lecture Notes in Computer Science","Advanced Computing Strategies for Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-91635-4_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,18]],"date-time":"2019-10-18T05:49:47Z","timestamp":1571377787000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-91635-4_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319916347","9783319916354"],"references-count":50,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-91635-4_18","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018]]}}}