{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,7,5]],"date-time":"2025-07-05T04:11:10Z","timestamp":1751688670392,"version":"3.41.0"},"publisher-location":"Cham","reference-count":69,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319916347"},{"type":"electronic","value":"9783319916354"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-91635-4_22","type":"book-chapter","created":{"date-parts":[[2018,5,18]],"date-time":"2018-05-18T09:04:46Z","timestamp":1526634286000},"page":"431-453","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Quantification of Energy Consumption and Carbon Dioxide Emissions During Excavator Operations"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0465-8304","authenticated-orcid":false,"given":"Hassanean S. H.","family":"Jassim","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4695-5369","authenticated-orcid":false,"given":"Weizhuo","family":"Lu","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5661-5237","authenticated-orcid":false,"given":"Thomas","family":"Olofsson","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,5,19]]},"reference":[{"key":"22_CR1","unstructured":"Anair, D.: Digging up trouble: the health risks of construction pollution in California. Union of Concerned Scientists (2006)"},{"key":"22_CR2","unstructured":"NSW EPA: Reducing emissions from non-road diesel engines: An information report prepared for the NSW EPA. ISBN:9781743597316, EPA 2014\/0 586 (2014)"},{"key":"22_CR3","unstructured":"Des Participants, Liste.: Good practice guidance and uncertainty management in national greenhouse gas inventories. Order (2001)"},{"key":"22_CR4","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/0928-7655(96)00005-X","volume":"18","author":"M Hoel","year":"1996","unstructured":"Hoel, M., Kverndokk, S.: Depletion of fossil fuels and the impacts of global warming. Resour. Energy Econ. 18, 115\u2013136 (1996)","journal-title":"Resour. Energy Econ."},{"key":"22_CR5","doi-asserted-by":"publisher","first-page":"631","DOI":"10.1061\/(ASCE)CO.1943-7862.0000477","volume":"138","author":"HG Avetisyan","year":"2011","unstructured":"Avetisyan, H.G., Miller-Hooks, E., Melanta, S.: Decision models to support greenhouse gas emissions reduction from transportation construction projects. J. Constr. Eng. Manage. 138, 631\u2013641 (2011)","journal-title":"J. Constr. Eng. Manage."},{"key":"22_CR6","unstructured":"Dallmann T., Menon A.: Technology pathways for diesel engines used in non-road vehicles and equipment. Int. Counc. Clean Transp. (ICCT) (2016)"},{"key":"22_CR7","doi-asserted-by":"publisher","first-page":"327","DOI":"10.1007\/978-3-662-46994-1_28","volume-title":"Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate","author":"M Sandanayake","year":"2015","unstructured":"Sandanayake, M., Zhang, G., Setunge, S., Thomas, C.M.: Environmental emissions of construction equipment usage in pile foundation construction process\u2014a case study. In: Shen, L., Ye, K., Mao, C. (eds.) Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, pp. 327\u2013339. Springer, Heidelberg (2015). https:\/\/doi.org\/10.1007\/978-3-662-46994-1_28"},{"key":"22_CR8","doi-asserted-by":"publisher","first-page":"218","DOI":"10.1016\/j.envsci.2015.06.010","volume":"54","author":"E Keijzer","year":"2015","unstructured":"Keijzer, E., Leegwater, G., de Vos-Effting, S., de Wit, M.: Carbon footprint comparison of innovative techniques in the construction and maintenance of road infrastructure in The netherlands. Environ. Sci. Policy 54, 218\u2013225 (2015)","journal-title":"Environ. Sci. Policy"},{"key":"22_CR9","unstructured":"Trafikverket: The swedish transport administration\u2019s efforts for improving energy efficiency and for climate mitigation (2012)"},{"key":"22_CR10","unstructured":"EPA: MOVES2014a: Latest version of MOtor vehicle emission simulator (MOVES), united states environmental protection agency. EPA EPA-420-F-15-046 (2014)"},{"key":"22_CR11","unstructured":"CARB: California air resources board; In-use off-road equipment - 2011 inventory model. California Air Resources Board (2011). http:\/\/www.arb.ca.gov\/msei\/categories.htm . Accessed 05 Mar 2016"},{"key":"22_CR12","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1108\/20466091311325863","volume":"2","author":"AM Hajji","year":"2013","unstructured":"Hajji, A.M., Lewis, P.: Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart Sustain. Built Environ. 2, 84\u2013100 (2013)","journal-title":"Smart Sustain. Built Environ."},{"key":"22_CR13","doi-asserted-by":"crossref","unstructured":"Hajji, A.M., Lewis, M.P.: Development of productivity-based estimating tool for fuel use and emissions from earthwork construction activities (2013)","DOI":"10.1108\/20466091311325863"},{"key":"22_CR14","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1061\/(ASCE)CO.1943-7862.0000598","volume":"139","author":"S Melanta","year":"2012","unstructured":"Melanta, S., Miller-Hooks, E., Avetisyan, H.G.: Carbon footprint estimation tool for transportation construction projects. J. Constr. Eng. Manage. 139, 547\u2013555 (2012)","journal-title":"J. Constr. Eng. Manage."},{"key":"22_CR15","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1080\/10473289.2002.10470755","volume":"52","author":"NN Clark","year":"2002","unstructured":"Clark, N.N., Kern, J.M., Atkinson, C.M., Nine, R.D.: Factors affecting heavy-duty diesel vehicle emissions. J. Air Waste Manage. Assoc. 52, 84\u201394 (2002)","journal-title":"J. Air Waste Manage. Assoc."},{"key":"22_CR16","doi-asserted-by":"crossref","unstructured":"Barati, K., Shen, X.: Emissions modelling of earthmoving equipment. vol. 33, no. 1 (2016)","DOI":"10.22260\/ISARC2016\/0065"},{"key":"22_CR17","doi-asserted-by":"crossref","unstructured":"Hajji A.M., Muladi, Larasati A.: \u2018ENPROD\u2019 MODEL\u2013estimating the energy impact of the use of heavy duty construction equipment by using productivity rate. vol. 1778, p. 030008 (2016)","DOI":"10.1063\/1.4965742"},{"key":"22_CR18","doi-asserted-by":"publisher","first-page":"463","DOI":"10.1080\/014461999371385","volume":"17","author":"JJ Shi","year":"1999","unstructured":"Shi, J.J.: A neural network based system for predicting earthmoving production. Constr. Manag. Econ. 17, 463\u2013471 (1999)","journal-title":"Constr. Manag. Econ."},{"key":"22_CR19","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/S1644-9665(12)60123-X","volume":"8","author":"K Schabowicz","year":"2008","unstructured":"Schabowicz, K., Ho\u0142a, B.: Application of artificial neural networks in predicting earthmoving machinery effectiveness ratios. Arch. Civil Mech. Eng. 8, 73\u201384 (2008)","journal-title":"Arch. Civil Mech. Eng."},{"key":"22_CR20","doi-asserted-by":"publisher","first-page":"570","DOI":"10.1016\/j.autcon.2010.02.004","volume":"19","author":"B Hola","year":"2010","unstructured":"Hola, B., Schabowicz, K.: Estimation of earthworks execution time cost by means of artificial neural networks. Autom. Constr. 19, 570\u2013579 (2010)","journal-title":"Autom. Constr."},{"key":"22_CR21","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1061\/(ASCE)0887-3801(1995)9:3(201)","volume":"9","author":"I Yeh","year":"1995","unstructured":"Yeh, I.: Construction-site layout using annealed neural network. J. Comput. Civ. Eng. 9, 201\u2013208 (1995)","journal-title":"J. Comput. Civ. Eng."},{"key":"22_CR22","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1108\/eb021106","volume":"6","author":"S Bhokha","year":"1999","unstructured":"Bhokha, S., Ogunlana, S.O.: Application of artificial neural network to forecast construction duration of buildings at the predesign stage. Eng. Constr. Archit. Manag. 6, 133\u2013144 (1999)","journal-title":"Eng. Constr. Archit. Manag."},{"key":"22_CR23","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1016\/j.ijproman.2005.08.001","volume":"24","author":"SO Cheung","year":"2006","unstructured":"Cheung, S.O., Wong, P.S.P., Fung, A.S., Coffey, W.: Predicting project performance through neural networks. Int. J. Proj. Manage. 24, 207\u2013215 (2006)","journal-title":"Int. J. Proj. Manage."},{"key":"22_CR24","doi-asserted-by":"crossref","unstructured":"Shi, H.: Application of unascertained method and neural networks to quality assessment of construction project. vol. 1, pp. 52\u201355 (2009)","DOI":"10.1109\/ICICTA.2009.21"},{"key":"22_CR25","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1139\/cjce-2015-0299","volume":"43","author":"MSR Amin","year":"2015","unstructured":"Amin, M.S.R., Amador-Jim\u00e9nez, L.E.: Pavement management with dynamic traffic and artificial neural network: A case study of montreal. Can. J. Civil Eng. 43, 241\u2013251 (2015)","journal-title":"Can. J. Civil Eng."},{"key":"22_CR26","doi-asserted-by":"publisher","first-page":"399","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(399)","volume":"123","author":"J Portas","year":"1997","unstructured":"Portas, J., AbouRizk, S.: Neural network model for estimating construction productivity. J. Constr. Eng. Manage. 123, 399\u2013410 (1997)","journal-title":"J. Constr. Eng. Manage."},{"key":"22_CR27","doi-asserted-by":"publisher","first-page":"04015032","DOI":"10.1061\/(ASCE)CO.1943-7862.0001006","volume":"141","author":"G Heravi","year":"2015","unstructured":"Heravi, G., Eslamdoost, E.: Applying artificial neural networks for measuring and predicting construction-labor productivity. J. Constr. Eng. Manage. 141, 04015032 (2015)","journal-title":"J. Constr. Eng. Manage."},{"key":"22_CR28","doi-asserted-by":"crossref","unstructured":"Muqeem S., Idrus A.B., Khamidi, M.F., Zakaria, M.S.: Prediction modelling of construction labor production rates using artificial neural network, pp. 32\u201336 (2011)","DOI":"10.1109\/NatPC.2011.6136353"},{"key":"22_CR29","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1080\/01446190010008079","volume":"19","author":"A Sawhney","year":"2001","unstructured":"Sawhney, A., Mund, A.: IntelliCranes: an integrated crane type and model selection system. Constr. Manag. Econ. 19, 227\u2013237 (2001)","journal-title":"Constr. Manag. Econ."},{"key":"22_CR30","first-page":"139","volume":"10","author":"VT Luu","year":"2009","unstructured":"Luu, V.T., Kim, S.: Neural network model for construction cost prediction of apartment projects in vietnam. Korean J. Constr. Eng. Manag. 10, 139\u2013147 (2009)","journal-title":"Korean J. Constr. Eng. Manag."},{"key":"22_CR31","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1080\/01446199600000004","volume":"14","author":"GB Hua","year":"1996","unstructured":"Hua, G.B.: Residential construction demand forecasting using economic indicators: a comparative study of artificial neural networks and multiple regression. Constr. Manage. Econ. 14, 25\u201334 (1996)","journal-title":"Constr. Manage. Econ."},{"key":"22_CR32","unstructured":"Roxas C.L.C., Ongpeng J.M.C.: An artificial neural network approach to structural cost estimation of building projects in the Philippines (2014)"},{"key":"22_CR33","doi-asserted-by":"publisher","first-page":"574","DOI":"10.1139\/cjce-2012-0442","volume":"40","author":"U Gulcicek","year":"2013","unstructured":"Gulcicek, U., Ozkan, O., Gunduz, M., Demir, I.H.: Cost assessment of construction projects through neural networks. Canadian J. Civ. Eng. 40, 574\u2013579 (2013)","journal-title":"Canadian J. Civ. Eng."},{"key":"22_CR34","doi-asserted-by":"publisher","first-page":"63","DOI":"10.3923\/jai.2011.63.75","volume":"4","author":"M Arafa","year":"2011","unstructured":"Arafa, M., Alqedra, M.: Early stage cost estimation of buildings construction projects using artificial neural networks. J. Artif. Intell. 4, 63\u201375 (2011)","journal-title":"J. Artif. Intell."},{"key":"22_CR35","doi-asserted-by":"publisher","first-page":"450","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(450)","volume":"123","author":"H Adeli","year":"1997","unstructured":"Adeli, H., Karim, A.: Scheduling\/cost optimization and neural dynamics model for construction. J. Constr. Eng. Manag. 123, 450\u2013458 (1997)","journal-title":"J. Constr. Eng. Manag."},{"key":"22_CR36","doi-asserted-by":"publisher","first-page":"595","DOI":"10.1016\/j.ijproman.2004.04.002","volume":"22","author":"HM G\u00fcnayd\u0131n","year":"2004","unstructured":"G\u00fcnayd\u0131n, H.M., Do\u011fan, S.Z.: A neural network approach for early cost estimation of structural systems of buildings. Int. J. Project Manag. 22, 595\u2013602 (2004)","journal-title":"Int. J. Project Manag."},{"key":"22_CR37","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1061\/(ASCE)0733-9364(1998)124:3(210)","volume":"124","author":"T Hegazy","year":"1998","unstructured":"Hegazy, T., Ayed, A.: Neural network model for parametric cost estimation of highway projects. J. Constr. Eng. Manag. 124, 210\u2013218 (1998)","journal-title":"J. Constr. Eng. Manag."},{"key":"22_CR38","doi-asserted-by":"publisher","first-page":"1333","DOI":"10.1016\/j.buildenv.2004.03.009","volume":"39","author":"G Kim","year":"2004","unstructured":"Kim, G., Yoon, J., An, S., Cho, H., Kang, K.: Neural network model incorporating a genetic algorithm in estimating construction costs. Build. Environ. 39, 1333\u20131340 (2004)","journal-title":"Build. Environ."},{"key":"22_CR39","doi-asserted-by":"crossref","unstructured":"Xiao-chen D.: Application of neural network in the cost estimation of highway engineering. J. Comput. 5(11), 1763 (2010)","DOI":"10.4304\/jcp.5.11.1762-1766"},{"key":"22_CR40","unstructured":"Elhag, T., Boussabaine, A.: An artificial neural system for cost estimation of construction projects (1998)"},{"key":"22_CR41","doi-asserted-by":"publisher","first-page":"465","DOI":"10.1080\/01446190210151050","volume":"20","author":"MW Emsley","year":"2002","unstructured":"Emsley, M.W., Lowe, D.J., Duff, A.R., Harding, A., Hickson, A.: Data modelling and the application of a neural network approach to the prediction of total construction costs. Constr. Manag. Econ. 20, 465\u2013472 (2002)","journal-title":"Constr. Manag. Econ."},{"key":"22_CR42","unstructured":"Iranmanesh, S.H., Zarezadeh, M.: Application of artificial neural network to forecast actual cost of a project to improve earned value management system. pp. 240\u2013243 (2008)"},{"key":"22_CR43","first-page":"1036","volume":"6","author":"J Sodikov","year":"2005","unstructured":"Sodikov, J.: Cost estimation of highway projects in developing countries: Artificial neural network approach. J. East. Asia Soc. Transp. Stud. 6, 1036\u20131047 (2005)","journal-title":"J. East. Asia Soc. Transp. Stud."},{"key":"22_CR44","doi-asserted-by":"publisher","first-page":"306","DOI":"10.1061\/(ASCE)0733-9364(1994)120:2(306)","volume":"120","author":"TP Williams","year":"1994","unstructured":"Williams, T.P.: Predicting changes in construction cost indexes using neural networks. J. Constr. Eng. Manage. 120, 306\u2013320 (1994)","journal-title":"J. Constr. Eng. Manage."},{"key":"22_CR45","doi-asserted-by":"publisher","first-page":"765","DOI":"10.1061\/(ASCE)0733-9364(2005)131:7(765)","volume":"131","author":"CG Wilmot","year":"2005","unstructured":"Wilmot, C.G., Mei, B.: Neural network modeling of highway construction costs. J. Constr. Eng. Manage. 131, 765\u2013771 (2005)","journal-title":"J. Constr. Eng. Manage."},{"key":"22_CR46","unstructured":"Zhao Y., Chua D.K.: Relationship between productivity and non value-adding activities (2003)"},{"key":"22_CR47","doi-asserted-by":"crossref","unstructured":"Boussabaine, A.H.: A neural network system for productivity forecasting. pp. 375\u2013381 (1995)","DOI":"10.22260\/ISARC1995\/0045"},{"key":"22_CR48","doi-asserted-by":"publisher","first-page":"521","DOI":"10.1139\/l92-061","volume":"19","author":"O Moselhi","year":"1992","unstructured":"Moselhi, O., Hegazy, T., Fazio, P.: Potential applications of neural networks in construction. Can. J. Civ. Eng. 19, 521\u2013529 (1992)","journal-title":"Can. J. Civ. Eng."},{"key":"22_CR49","doi-asserted-by":"publisher","first-page":"446","DOI":"10.1046\/j.1365-232X.2002.00277.x","volume":"9","author":"C Tam","year":"2002","unstructured":"Tam, C., Tong, T.K., Tse, S.L.: Artificial neural networks model for predicting excavator productivity. Eng. Constr. Archit. Manag. 9, 446\u2013452 (2002)","journal-title":"Eng. Constr. Archit. Manag."},{"key":"22_CR50","doi-asserted-by":"publisher","first-page":"1029","DOI":"10.1080\/01446190600851033","volume":"24","author":"SC Ok","year":"2006","unstructured":"Ok, S.C., Sinha, S.K.: Construction equipment productivity estimation using artificial neural network model. Constr. Manage. Econ. 24, 1029\u20131044 (2006)","journal-title":"Constr. Manage. Econ."},{"key":"22_CR51","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1016\/S0263-7863(00)00011-9","volume":"19","author":"SA Assaf","year":"2001","unstructured":"Assaf, S.A., Bubshait, A.A., Atiyah, S., Al-Shahri, M.: The management of construction company overhead costs. Int. J. Proj. Manag. 19, 295\u2013303 (2001)","journal-title":"Int. J. Proj. Manag."},{"key":"22_CR52","unstructured":"ElSawy I., Hosny H., Razek M.A.: A neural network model for construction projects site overhead cost estimating in Egypt (2011)"},{"key":"22_CR53","unstructured":"Cat. 44: Caterpillar performance handbook (2015)"},{"key":"22_CR54","unstructured":"Cat. 42: Caterpillar performance handbook (2012)"},{"key":"22_CR55","doi-asserted-by":"crossref","unstructured":"Martinez, J.C.: EZStrobe: general-purpose simulation system based on activity cycle diagrams. pp. 1556\u20131564 (2001)","DOI":"10.1109\/WSC.2001.977485"},{"key":"22_CR56","doi-asserted-by":"publisher","first-page":"1257","DOI":"10.3390\/su9071257","volume":"9","author":"HS Jassim","year":"2017","unstructured":"Jassim, H.S., Lu, W., Olofsson, T.: Predicting energy consumption and CO2 emissions of excavators in earthwork operations: an artificial neural network model. Sustainability 9, 1257 (2017)","journal-title":"Sustainability"},{"key":"22_CR57","first-page":"163","volume":"23","author":"M Klanfar","year":"2016","unstructured":"Klanfar, M., Korman, T., Kujund\u017ei\u0107, T.: Fuel consumption and engine load factors of equipment in quarrying of crushed stone. Teh. vjesn. 23, 163\u2013169 (2016)","journal-title":"Teh. vjesn."},{"key":"22_CR58","unstructured":"ICLEI: Clean fleets guide. procuring clean and efficient road vehicles; international council for local environmental initiatives (ICLEI-europe) local governments for sustainability: Freiburg, Germany, ICLEI-Europe (2014)"},{"key":"22_CR59","doi-asserted-by":"publisher","first-page":"1645","DOI":"10.1016\/j.apenergy.2013.09.017","volume":"113","author":"S Zhang","year":"2014","unstructured":"Zhang, S., Wu, Y., Liu, H., Huang, R., Yang, L., Li, Z., Fu, L., Hao, J.: Real-world fuel consumption and CO2 emissions of urban public buses in beijing. Appl. Energy 113, 1645\u20131655 (2014)","journal-title":"Appl. Energy"},{"key":"22_CR60","unstructured":"DECC Defra: Guidelines to defra\/DECC\u2019s GHG conversion factors for company reporting (2011)"},{"key":"22_CR61","doi-asserted-by":"publisher","first-page":"681","DOI":"10.1016\/j.engstruct.2004.01.009","volume":"26","author":"AWC Oreta","year":"2004","unstructured":"Oreta, A.W.C.: Simulating size effect on shear strength of RC beams without stirrups using neural networks. Eng. Struct. 26, 681\u2013691 (2004)","journal-title":"Eng. Struct."},{"key":"22_CR62","doi-asserted-by":"publisher","first-page":"1075","DOI":"10.1016\/S0140-6736(95)91746-2","volume":"346","author":"SS Cross","year":"1995","unstructured":"Cross, S.S., Harrison, R.F., Kennedy, R.L.: Introduction to neural networks. Lancet 346, 1075\u20131079 (1995)","journal-title":"Lancet"},{"key":"22_CR63","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1007\/BF00547132","volume":"32","author":"D Hamby","year":"1994","unstructured":"Hamby, D.: A review of techniques for parameter sensitivity analysis of environmental models. Environ. Monit. Assess. 32, 135\u2013154 (1994)","journal-title":"Environ. Monit. Assess."},{"key":"22_CR64","doi-asserted-by":"publisher","first-page":"320","DOI":"10.13182\/NT86-A16075","volume":"73","author":"J Helton","year":"1986","unstructured":"Helton, J., Iman, R., Johnson, J., Leigh, C.: Uncertainty and sensitivity analysis of a model for multicomponent aerosol dynamics. Nucl. Technol. 73, 320\u2013342 (1986)","journal-title":"Nucl. Technol."},{"key":"22_CR65","first-page":"47","volume":"6","author":"DG Garson","year":"1991","unstructured":"Garson, D.G.: Interpreting neural network connection weights. Artif. Intell. Expert 6, 47\u201351 (1991)","journal-title":"Artif. Intell. Expert"},{"key":"22_CR66","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1016\/0954-1810(94)00011-S","volume":"9","author":"A Goh","year":"1995","unstructured":"Goh, A.: Back-propagation neural networks for modeling complex systems. Artif. Intell. Eng. 9, 143\u2013151 (1995)","journal-title":"Artif. Intell. Eng."},{"key":"22_CR67","doi-asserted-by":"crossref","unstructured":"Mart\u00ednez, J.C.: EZStrobe\u2014General-purpose simulation system based on activity cycle diagrams. pp. 341\u2013348 (1998)","DOI":"10.1109\/WSC.1998.745006"},{"key":"22_CR68","unstructured":"FUEL ECONOMY: Fuelling savings in tough times - blutip power technologies. pp. 38\u201346 (2015)"},{"key":"22_CR69","unstructured":"Komatsu: Komatsu specification and application handbook (2009)"}],"container-title":["Lecture Notes in Computer Science","Advanced Computing Strategies for Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-91635-4_22","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,4]],"date-time":"2025-07-04T16:27:38Z","timestamp":1751646458000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-91635-4_22"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319916347","9783319916354"],"references-count":69,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-91635-4_22","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2018]]}}}