{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T21:10:09Z","timestamp":1725657009664},"publisher-location":"Wiesbaden","reference-count":13,"publisher":"Vieweg+Teubner Verlag","isbn-type":[{"type":"print","value":"9783519003267"},{"type":"electronic","value":"9783322847980"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2001]]},"DOI":"10.1007\/978-3-322-84798-0_9","type":"book-chapter","created":{"date-parts":[[2012,2,6]],"date-time":"2012-02-06T08:20:28Z","timestamp":1328516428000},"page":"109-125","source":"Crossref","is-referenced-by-count":0,"title":["Optimizing Business Processes with Generalised Process Networks"],"prefix":"10.1007","author":[{"given":"G\u00fcnter","family":"Schmidt","sequence":"first","affiliation":[]}],"member":"297","reference":[{"key":"9_CR1","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03217-6","volume-title":"Scheduling Computer and Manufacturing Processes","author":"J Blazewicz","year":"1996","unstructured":"Blazewicz, J., Ecker, K., Pesch, E., Schmidt, G., Weglarz, J., Scheduling Computer and Manufacturing Processes, Springer, Berlin, 1996"},{"key":"9_CR2","doi-asserted-by":"crossref","DOI":"10.1007\/978-0-387-34983-1","volume-title":"Modelling and Methodologies for Deterprise Integration","author":"P Bernus","year":"1996","unstructured":"Bernus, P., Nemes, L., Modelling and Methodologies for Deterprise Integration, Chapman and Hall, London, 1996"},{"issue":"9","key":"9_CR3","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1145\/130994.130998","volume":"35","author":"B Curtis","year":"1992","unstructured":"Curtis, B., Kellner, M. I., Over, J., Process modeling, Communications of the ACM 35(9), 1992, 75\u201390","journal-title":"Communications of the ACM"},{"key":"9_CR4","doi-asserted-by":"publisher","first-page":"452","DOI":"10.1016\/S0377-2217(96)00186-5","volume":"101","author":"K Ecker","year":"1997","unstructured":"Ecker, K., Gupta, J., Schmidt, G., A framework for decision support systems for scheduling problems, European Journal of Operational Research, 101, 1997, 452\u2013462","journal-title":"European Journal of Operational Research"},{"key":"9_CR5","unstructured":"Ecker, K., Schmidt, G., Conflict resolution algorithms for scheduling problems, in: K. Ecker, R. Hirschberg (eds.), Lessach Workshop on Parallel Processing, Report No. 93\/5, TU Clausthal, 1993, 81\u201390"},{"volume-title":"Recent Advances in Project Scheduling","year":"1989","key":"9_CR6","unstructured":"Slowinski, R., Weglarz, J., (eds.), Recent Advances in Project Scheduling, Elsevier, Amsterdam, 1989"},{"issue":"1","key":"9_CR7","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1145\/174666.174668","volume":"26","author":"TW Malone","year":"1994","unstructured":"Malone, T. W., Crowston, K., The interdisciplinary study of coordination, ACM Computing surveys 26(1), 1994, 87\u2013119","journal-title":"ACM Computing surveys"},{"key":"9_CR8","volume-title":"Scheduling: Theory, Algorithms, and Systems","author":"M Pinedo","year":"1995","unstructured":"Pinedo, M., Scheduling: Theory, Algorithms, and Systems, Prentice Hall, Deglewood Cliffs, 1995"},{"key":"9_CR9","doi-asserted-by":"crossref","unstructured":"Schmidt, G., Constraint-satisfaction problems in project scheduling, in: [SW89], 135\u2013150","DOI":"10.1016\/B978-0-444-87358-3.50010-9"},{"key":"9_CR10","doi-asserted-by":"crossref","unstructured":"Schmidt, G., Scheduling models for workflow management, in: B. Scholz-Reiter, E. Stickel (eds.), Business Process Modelling, Springer, 1996, 67\u201380","DOI":"10.1007\/978-3-642-80317-8_4"},{"key":"9_CR11","volume-title":"Informationsmanagement\u2014Modelle, Methoden, Techniken","author":"G Schmidt","year":"1996","unstructured":"Schmidt, G., Informationsmanagement\u2014Modelle, Methoden, Techniken, Springer, Berlin, 1996"},{"key":"9_CR12","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/0925-5273(95)00019-4","volume":"46-47","author":"G Schmidt","year":"1996","unstructured":"Schmidt, G., Modelling production scheduling systems, Int. J. Production Economics 46-47, 1996, 109\u2013118","journal-title":"Int. J. Production Economics"},{"key":"9_CR13","volume-title":"Prozess management\u2014Modelle und Methoden","author":"G Schmidt","year":"1997","unstructured":"Schmidt, G., Prozess management\u2014Modelle und Methoden, Springer, Berlin, 1997"}],"container-title":["Informationsmanagement \u2014 Herausforderungen und Perspektiven"],"original-title":[],"language":"de","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-322-84798-0_9.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,2]],"date-time":"2021-05-02T13:39:21Z","timestamp":1619962761000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-322-84798-0_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001]]},"ISBN":["9783519003267","9783322847980"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-322-84798-0_9","relation":{},"subject":[],"published":{"date-parts":[[2001]]}}}