{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T19:37:53Z","timestamp":1725565073360},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540220077"},{"type":"electronic","value":"9783540246770"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2004]]},"DOI":"10.1007\/978-3-540-24677-0_27","type":"book-chapter","created":{"date-parts":[[2010,9,8]],"date-time":"2010-09-08T21:37:46Z","timestamp":1283981866000},"page":"249-263","source":"Crossref","is-referenced-by-count":3,"title":["Multi-agent Based Integration Scheduling System under Supply Chain Management Environment"],"prefix":"10.1007","author":[{"given":"Hyung Rim","family":"Choi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hyun Soo","family":"Kim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Byung Joo","family":"Park","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yong Sung","family":"Park","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"27_CR1","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1080\/00207549508930142","volume":"33","author":"P. Brandimarte","year":"1995","unstructured":"Brandimarte, P., Calderini, M.: A heuristic bicriterion approach to integrated process plan selection and job shop scheduling. International Journal of Production Research\u00a033, 161\u2013181 (1995)","journal-title":"International Journal of Production Research"},{"key":"27_CR2","unstructured":"Choi, H.R., Park, B.J., Park, Y.S., Kang, M.H.: Integrated Job Shop Scheduling considering Alternative Machines and Operation Sequence. In: Proceedings of Fall Conference of the Korean OR\/MS society, pp. 85\u201388 (2003)"},{"key":"27_CR3","doi-asserted-by":"publisher","first-page":"351","DOI":"10.1016\/S0360-8352(02)00079-7","volume":"43","author":"Y.H. Lee","year":"2002","unstructured":"Lee, Y.H., Jeong, C.S., Moon, C.U.: Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers & Industrial Engineering\u00a043, 351\u2013374 (2002)","journal-title":"Computers & Industrial Engineering"},{"key":"27_CR4","unstructured":"Maturana, F., Balasubramanian, S., Norrie, D.H.: A Multi-Agent Approach to Integrated Planning and Scheduling for Concurrent Engineering. In: Proceedings of the International Conference on Concurrent Engineering \u2013 Research and Applications, Toronto (1996)"},{"key":"27_CR5","unstructured":"Moon, C.U., Jeong, C.S., Lee, Y.H., Kim, J.S.: GA based Heuristic for Integrated Process Planning and Scheduling in Supply Chain. In: Proceedings of International Conference on Production Research, Bangkok (2000)"},{"key":"27_CR6","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1007\/BF00118077","volume":"7","author":"G.J. Palmer","year":"1996","unstructured":"Palmer, G.J.: A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing\u00a07, 163\u2013176 (1996)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"27_CR7","first-page":"317","volume-title":"Genetic and Evolutionary Computation Conference Late-Breaking Papers","author":"B.J. Park","year":"2001","unstructured":"Park, B.J., Choi, H.R., Kim, H.S.: A Hybrid Genetic Algorithms for Job Shop Scheduling Problems. In: Goodman, E. (ed.) Genetic and Evolutionary Computation Conference Late-Breaking Papers, July 7-11, pp. 317\u2013324. ISGEC Press, San Francisco (2001)"},{"key":"27_CR8","unstructured":"Park, B.J.: A Development of Hybrid Genetic Algorithms for Scheduling of Static and Dynamic Job Shop, Ph.D. thesis, Department of Industrial Engineering, Dong-A University (1999)"},{"key":"27_CR9","unstructured":"Shu, S., Norrie, D.H.: Patterns for Adaptive Multi-Agent Systems in Intelligent Manufacturing. In: Proc. of the 2nd International Workshop on Intelligent Manufacturing Systems, Leuven, Belgium, pp. 67\u201374 (1999)"},{"key":"27_CR10","unstructured":"Shen, W., Norrie, D.H.: An Agent-Based Approach for Dynamic Manufacturing Scheduling. In: Working Notes of the Agent-Based Manufacturing Workshop, Minneapolis, MN"},{"issue":"2","key":"27_CR11","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1007\/BF03325096","volume":"1","author":"W. Shen","year":"1999","unstructured":"Shen, W., Norrie, D.H.: Agent-Based Systems for Intelligent Manufacturing: A State-of the-Art Survey. Knowledge and Information Systems\u00a01(2), 129\u2013156 (1999)","journal-title":"Knowledge and Information Systems"}],"container-title":["Lecture Notes in Computer Science","Innovations in Applied Artificial Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-24677-0_27.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,3]],"date-time":"2021-05-03T03:00:58Z","timestamp":1620010858000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-24677-0_27"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004]]},"ISBN":["9783540220077","9783540246770"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-24677-0_27","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2004]]}}}