{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T19:41:04Z","timestamp":1725565264634},"publisher-location":"Berlin, Heidelberg","reference-count":23,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540220572"},{"type":"electronic","value":"9783540247678"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2004]]},"DOI":"10.1007\/978-3-540-24767-8_90","type":"book-chapter","created":{"date-parts":[[2010,9,10]],"date-time":"2010-09-10T20:45:04Z","timestamp":1284151504000},"page":"857-866","source":"Crossref","is-referenced-by-count":1,"title":["HierGen: A Computer Tool for the Generation of Activity-on-the-Node Hierarchical Project Networks"],"prefix":"10.1007","author":[{"given":"Miguel","family":"Guti\u00e9rrez","sequence":"first","affiliation":[]},{"given":"Alfonso","family":"Dur\u00e1n","sequence":"additional","affiliation":[]},{"given":"David","family":"Alegre","sequence":"additional","affiliation":[]},{"given":"Francisco","family":"Sastr\u00f3n","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"volume-title":"Project Scheduling: Recent Models, Algorithms and Applications","year":"1999","key":"90_CR1","unstructured":"Weglarz, J. (ed.): Project Scheduling: Recent Models, Algorithms and Applications. Kluwer Academic, Amsterdam (1999)"},{"key":"90_CR2","volume-title":"Project Scheduling: a Research Handbook","author":"E. Demeulemeester","year":"2002","unstructured":"Demeulemeester, E., Herroelen, W.S.: Project Scheduling: a Research Handbook. Kluwer Academic, Boston (2002)"},{"key":"90_CR3","doi-asserted-by":"publisher","first-page":"972","DOI":"10.1287\/opre.41.5.972","volume":"41","author":"E. Demeulemeester","year":"1993","unstructured":"Demeulemeester, E., Dodin, B., Herroelen, W.: A Randon Activity Network Generator. Operations Research\u00a041, 972\u2013980 (1993)","journal-title":"Operations Research"},{"key":"90_CR4","doi-asserted-by":"publisher","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., Drexl, A.: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems. Management Sci.\u00a041, 1693\u20131703 (1995)","journal-title":"Management Sci."},{"key":"90_CR5","unstructured":"Schwindt, C.: Generation of Resource-Constrained Project Scheduling Problems Subject to Temporal Constraints, Report WIOR-543. Universit\u00e4t Karlsruhe, Alemania (1998)"},{"key":"90_CR6","doi-asserted-by":"publisher","first-page":"376","DOI":"10.1016\/0377-2217(95)00361-4","volume":"90","author":"M.K. Agrawal","year":"1996","unstructured":"Agrawal, M.K., Elmaghraby, S.E., Herroelen, W.S.: DAGEN: A Generator of Testsets for Project Activity Nets. European Journal of Operational Research\u00a090, 376\u2013382 (1996)","journal-title":"European Journal of Operational Research"},{"key":"90_CR7","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1023\/A:1022283403119","volume":"6","author":"E. Demeulemeester","year":"2003","unstructured":"Demeulemeester, E., Vanhoucke, M., Herroelen, W.: RanGen: a Random Network Generator for Activity-On-the-Node Networks. Journal of Scheduling\u00a06, 17\u201338 (2003)","journal-title":"Journal of Scheduling"},{"key":"90_CR8","volume-title":"A Structural and Design Oriented Approach","author":"J.W.M. Bertrand","year":"1990","unstructured":"Bertrand, J.W.M., Wortmann, J.C., Wijngaard, J.: A Structural and Design Oriented Approach. Elsevier Science, Amsterdam (1990)"},{"key":"90_CR9","doi-asserted-by":"publisher","first-page":"1112","DOI":"10.1137\/0221065","volume":"21","author":"W.W. Bein","year":"1992","unstructured":"Bein, W.W., Kamburowski, J., Stallman, M.F.M.: Optimal Reduction of Two-terminal Directed Acyclic Graphs. SIAM J. Comput.\u00a021, 1112\u20131129 (1992)","journal-title":"SIAM J. Comput."},{"issue":"4","key":"90_CR10","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1016\/S0263-7863(96)00075-0","volume":"15","author":"A.P. Merwe van der","year":"1997","unstructured":"van der Merwe, A.P.: Multi-project Management \u2013 Organizational Structure and Control. Int. J. Project Management\u00a015(4), 223\u2013233 (1997)","journal-title":"Int. J. Project Management"},{"issue":"2","key":"90_CR11","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1080\/09537280110069621","volume":"13","author":"V.S. Gordon","year":"2002","unstructured":"Gordon, V.S., Proth, J.-M., Chu, C.: Due Date Assignment and Scheduling: SLK TWK and Other Due Date Assignment Models. Prod. Planning and Control\u00a013(2), 117\u2013132 (2002)","journal-title":"Prod. Planning and Control"},{"key":"90_CR12","unstructured":"de Boer, R.: Resource-Constrained Multi-Project Management \u2013 A Hierarchical Decision Support System. Ph.D. Thesis, University of Twente (1998)"},{"key":"90_CR13","unstructured":"Motoa, T.-G.: Herramienta Inform\u00e1tica de Planificaci\u00f3n de M\u00faltiples Proyectos con Enfoque Jer\u00e1rquico y An\u00e1lisis de Carga\u2013Capacidad. Ph.D. Thesis, U. Polit\u00e9cnica Madrid (2000)"},{"key":"90_CR14","unstructured":"Tormos, P., Barber, F., Lova, A.: An Integration Model for Planning and Scheduling Problems with Constrained Resources. In: 8th Int. Work. Proj. Manag. and Sched, pp. 354\u2013 358 (2002)"},{"key":"90_CR15","unstructured":"Bart\u00e1k, R., Mecl, R.: Integrating Planning into Production Scheduling: Visopt Shopfloor System. In: Kendall, G., Burke, E., Petrovic, S. (eds.) Proceedings of the 1st Multidisciplinary Int. Conf. on Scheduling: Theory and App (MISTA), Nottingham, pp. 259\u2013278 (2003)"},{"key":"90_CR16","unstructured":"Bart\u00e1k, R.: Modelling Planning and Scheduling Problems with Time and Resources. In: Recent Adv. Computers, Computing Communications. WSEAS, Rethymnon, pp. 104\u2013 109 (2002)"},{"issue":"1","key":"90_CR17","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1017\/S0269888900001089","volume":"15","author":"D.E. Smith","year":"2000","unstructured":"Smith, D.E., Frank, J., J\u00f3nsson, A.K.: Bridging the Gap between Planning and Scheduling. Knowledge Engineering Review\u00a015(1), 61\u201394 (2000)","journal-title":"Knowledge Engineering Review"},{"key":"90_CR18","volume-title":"Studies in the Management Science, Logistics","author":"A.C. Hax","year":"1975","unstructured":"Hax, A.C., Meal, H.C.: Hierarchical Integration of Production Planning and Scheduling. In: Geisler, M.A. (ed.) Studies in the Management Science, Logistics, vol.\u00a01, North-Holland-American Elsevier, New York (1975)"},{"key":"90_CR19","series-title":"Handbooks in OR and Manufacturing Science","doi-asserted-by":"publisher","DOI":"10.1016\/S0927-0507(05)80190-2","volume-title":"Logistics of Production and Inventory","author":"G.R. Bitran","year":"1993","unstructured":"Bitran, G.R., Tirupati, D.: Hierarchical Production Planning. In: Graves, S.C., Rinnooy, A.H.G., Zipkin, P.H. (eds.) Logistics of Production and Inventory. Handbooks in OR and Manufacturing Science, vol.\u00a04, North-Holland, Amsterdam (1993)"},{"key":"90_CR20","doi-asserted-by":"publisher","first-page":"209","DOI":"10.1016\/0965-9978(95)00117-4","volume":"26","author":"M. Mehra","year":"1996","unstructured":"Mehra, M., Minis, I., Proth, J.M.: Hierarchical Production Planning for Complex Manufacturing Systems. Advances in Engineering Software\u00a026, 209\u2013218 (1996)","journal-title":"Advances in Engineering Software"},{"key":"90_CR21","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/S0925-5273(01)00103-7","volume":"74","author":"E. Vicens","year":"2001","unstructured":"Vicens, E., Alemany, M.E., Andr\u00e9s, C., Guarch, J.J.: A Design and Application Methodology for Hierarchical Production Planning Decision Support Systems in an Enterprise Integration Context. Int. J. Production Economics\u00a074, 5\u201320 (2001)","journal-title":"Int. J. Production Economics"},{"key":"90_CR22","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1479-4","volume-title":"Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems","author":"P. Baptiste","year":"2001","unstructured":"Baptiste, P., Le Pape, C., Nuijten, W.: Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems. Kluwer Academic, Boston (2001)"},{"issue":"1","key":"90_CR23","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1023\/A:1013617802515","volume":"8","author":"A. Cesta","year":"2002","unstructured":"Cesta, A., Oddi, A., Smith, S.F.: A Constraint-Based Method for Project Scheduling with Time Windows. Journal of Heuristics\u00a08(1), 109\u2013136 (2002)","journal-title":"Journal of Heuristics"}],"container-title":["Lecture Notes in Computer Science","Computational Science and Its Applications \u2013 ICCSA 2004"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-24767-8_90.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,2]],"date-time":"2021-05-02T23:08:27Z","timestamp":1619996907000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-24767-8_90"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004]]},"ISBN":["9783540220572","9783540247678"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-24767-8_90","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2004]]}}}