{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T12:04:15Z","timestamp":1770984255932,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":34,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540253372","type":"print"},{"value":"9783540319962","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/978-3-540-31996-2_18","type":"book-chapter","created":{"date-parts":[[2010,3,31]],"date-time":"2010-03-31T17:17:28Z","timestamp":1270055848000},"page":"190-201","source":"Crossref","is-referenced-by-count":1,"title":["The Use of Meta-heuristics to Solve Economic Lot Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Syed Asif","family":"Raza","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ali","family":"Akgunduz","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"18_CR1","doi-asserted-by":"publisher","first-page":"809","DOI":"10.1080\/00207540110095222","volume":"20","author":"I. Moon","year":"2002","unstructured":"Moon, I., Silver, E., Choi, S.: Hybrid genetic algorithm for the economic lot-scheduling problem. International Journal of Production Research\u00a020, 809\u2013824 (2002)","journal-title":"International Journal of Production Research"},{"key":"18_CR2","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1057\/jors.1959.22","volume":"10","author":"S. Eilon","year":"1959","unstructured":"Eilon, S.: Economic batch-size determination for multi-product scheduling. Operations Research\u00a010, 217\u2013227 (1959)","journal-title":"Operations Research"},{"key":"18_CR3","doi-asserted-by":"publisher","first-page":"264","DOI":"10.1287\/mnsc.4.3.264","volume":"4","author":"J. Rogers","year":"1958","unstructured":"Rogers, J.: A computational approach to the economic lot scheduling problem. Management Science\u00a04, 264\u2013291 (1958)","journal-title":"Management Science"},{"key":"18_CR4","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1002\/nav.3800110202","volume":"11","author":"W.L. Maxwell","year":"1964","unstructured":"Maxwell, W.L.: The scheduling of economic lot sizes. Naval Research Logisitcs Quarterly\u00a011, 89\u2013124 (1964)","journal-title":"Naval Research Logisitcs Quarterly"},{"key":"18_CR5","volume-title":"Operations Research in Production Planning and Control","author":"F. Hanssmann","year":"1962","unstructured":"Hanssmann, F.: Operations Research in Production Planning and Control. John Wiley, New York (1962)"},{"key":"18_CR6","doi-asserted-by":"publisher","first-page":"778","DOI":"10.1287\/mnsc.12.11.778","volume":"12","author":"E.E. Bomberger","year":"1966","unstructured":"Bomberger, E.E.: A dynamic programming approach to a lot size scheduling problem. Management Science\u00a012, 778\u2013784 (1966)","journal-title":"Management Science"},{"key":"18_CR7","doi-asserted-by":"publisher","first-page":"587","DOI":"10.1287\/mnsc.24.6.587","volume":"24","author":"S. Elmaghraby","year":"1978","unstructured":"Elmaghraby, S.: The economic lot scheduling problem (ELSP): Review and extension. Management Science\u00a024, 587\u2013598 (1978)","journal-title":"Management Science"},{"key":"18_CR8","doi-asserted-by":"publisher","first-page":"1070","DOI":"10.1287\/mnsc.23.10.1070","volume":"23","author":"C. Delporte","year":"1978","unstructured":"Delporte, C., Thomas, L.: Lot sizing and sequencing for N products on one facility. Management Science\u00a023, 1070\u20131079 (1978)","journal-title":"Management Science"},{"key":"18_CR9","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1287\/mnsc.29.1.93","volume":"29","author":"W. Hsu","year":"1983","unstructured":"Hsu, W.: On the general feasibility test for scheduling lot sizes for several products on one machine. Management Science\u00a029, 93\u2013105 (1983)","journal-title":"Management Science"},{"key":"18_CR10","doi-asserted-by":"publisher","first-page":"764","DOI":"10.1287\/opre.35.5.764","volume":"35","author":"G. Dobson","year":"1987","unstructured":"Dobson, G.: The economic lot-scheduling problem: Achieving feasibility using time-varying lot sizes. Operations Research\u00a035, 764\u2013771 (1987)","journal-title":"Operations Research"},{"key":"18_CR11","first-page":"109","volume":"29","author":"G. Gallego","year":"1997","unstructured":"Gallego, G., Shaw, X.: Complexity of the ELSP with general cyclic schedules. IIE Transactions\u00a029, 109\u2013113 (1997)","journal-title":"IIE Transactions"},{"key":"18_CR12","doi-asserted-by":"publisher","first-page":"736","DOI":"10.1287\/opre.40.4.736","volume":"40","author":"G. Dobson","year":"1992","unstructured":"Dobson, G.: The cyclic lot scheduling problem with sequence-dependent setups. Operations Research\u00a040, 736\u2013749 (1992)","journal-title":"Operations Research"},{"key":"18_CR13","first-page":"24","volume":"31","author":"S.J. Allen","year":"1990","unstructured":"Allen, S.J.: Production rate planning for two products sharing a single process facility: A real world case study. Production and Inventory Management\u00a031, 24\u201329 (1990)","journal-title":"Production and Inventory Management"},{"key":"18_CR14","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1080\/00207549008942681","volume":"28","author":"E. Silver","year":"1990","unstructured":"Silver, E.: Deliberately slowing down output in a family production context. International Journal of Production Research\u00a028, 17\u201327 (1990)","journal-title":"International Journal of Production Research"},{"key":"18_CR15","first-page":"2459","volume":"30","author":"I. Moon","year":"1991","unstructured":"Moon, I., Gallego, G., Simchi-Levi, D.: Controllable production rates in a family production context. IIE Transaction\u00a030, 2459\u20132470 (1991)","journal-title":"IIE Transaction"},{"key":"18_CR16","doi-asserted-by":"publisher","first-page":"1035","DOI":"10.1080\/00207549308956774","volume":"31","author":"G. Gallego","year":"1993","unstructured":"Gallego, G.: Reduced production rates in the economic lot scheduling problem. International Journal of Production Research\u00a031, 1035\u20131046 (1993)","journal-title":"International Journal of Production Research"},{"key":"18_CR17","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/S0925-5273(96)00064-3","volume":"48","author":"M. Khouja","year":"1997","unstructured":"Khouja, M.: The economic lot scheduling problem under volume flexibility. International Journal of Production Research\u00a048, 73\u201386 (1997)","journal-title":"International Journal of Production Research"},{"key":"18_CR18","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/S0925-5273(97)00128-X","volume":"54","author":"D. Moon","year":"1998","unstructured":"Moon, D., Christy, D.: Determination of optimal priduction rates on a single facility with dependent mold lifespan. International Journal of Production Economics\u00a054, 29\u201340 (1998)","journal-title":"International Journal of Production Economics"},{"key":"18_CR19","doi-asserted-by":"publisher","first-page":"623","DOI":"10.1080\/00207549508930169","volume":"33","author":"E. Silver","year":"1995","unstructured":"Silver, E.: Dealing with shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate. International Journal of Production Research\u00a033, 623\u2013629 (1995)","journal-title":"International Journal of Production Research"},{"key":"18_CR20","doi-asserted-by":"publisher","first-page":"1703","DOI":"10.1080\/002075497195218","volume":"35","author":"S. Viswanathan","year":"1997","unstructured":"Viswanathan, S., Goyal, S.K.: Optimal cycle time and production rate in a family production context with shelf life considerations. International Journal of Production Research\u00a035, 1703\u20131711 (1997)","journal-title":"International Journal of Production Research"},{"key":"18_CR21","doi-asserted-by":"publisher","first-page":"614","DOI":"10.1287\/opre.40.3.614","volume":"40","author":"G. Gellego","year":"1992","unstructured":"Gellego, G., Moon, I.: The effect of externalizing setups in the economic lot scheduling problem. Operations Research\u00a040, 614\u2013619 (1992)","journal-title":"Operations Research"},{"key":"18_CR22","doi-asserted-by":"publisher","first-page":"691","DOI":"10.1080\/00207549308956751","volume":"31","author":"H. Hwang","year":"1993","unstructured":"Hwang, H., Kim, D., Kim, Y.: Multiproduct economic lot size models with investment costs for set-up reduction and quality improvement. International Journal of Production Research\u00a031, 691\u2013703 (1993)","journal-title":"International Journal of Production Research"},{"key":"18_CR23","doi-asserted-by":"publisher","first-page":"2795","DOI":"10.1080\/00207549408957100","volume":"32","author":"I. Moon","year":"1994","unstructured":"Moon, I.: Multiproduct economic lot size models with investment costs for setup reduction and quality improvements: Reviews and extensions. International Journal of Production Research\u00a032, 2795\u20132801 (1994)","journal-title":"International Journal of Production Research"},{"key":"18_CR24","first-page":"1009","volume":"30","author":"I. Moon","year":"1998","unstructured":"Moon, I., Hahm, J., Lee, C.: The effect of the stabilization period on the economic lot scheduling problem. IIE Transactions\u00a030, 1009\u20131017 (1998)","journal-title":"IIE Transactions"},{"key":"18_CR25","doi-asserted-by":"publisher","first-page":"936","DOI":"10.1057\/palgrave.jors.2601758","volume":"55","author":"E.A. Silver","year":"2004","unstructured":"Silver, E.A.: An overview of heuristic solution methods. Journal of Operational Research Society\u00a055, 936\u2013956 (2004)","journal-title":"Journal of Operational Research Society"},{"key":"18_CR26","doi-asserted-by":"publisher","first-page":"509","DOI":"10.1016\/S0377-2217(97)00270-1","volume":"110","author":"M. Khouja","year":"1998","unstructured":"Khouja, M., Michalewicz, Z., Wilmot, M.: The use of genetic algoritms to solve the economic lot size scheduling problem. European Journal of Operational Research\u00a0110, 509\u2013524 (1998)","journal-title":"European Journal of Operational Research"},{"key":"18_CR27","first-page":"190","volume":"1","author":"F. Glover","year":"1989","unstructured":"Glover, F.: Tabu Search- Part I. OSAR Journal on Computing\u00a01, 190\u2013206 (1989)","journal-title":"OSAR Journal on Computing"},{"key":"18_CR28","volume-title":"Iterative Computer Algorithms with Applications in Engineering","author":"S.M. Sait","year":"1999","unstructured":"Sait, S.M., Youssef, H.: Iterative Computer Algorithms with Applications in Engineering. IEEE Computer Society, Los Alamitos (1999)"},{"key":"18_CR29","doi-asserted-by":"publisher","first-page":"605","DOI":"10.1080\/00207729608929256","volume":"27","author":"J. Lyu","year":"1996","unstructured":"Lyu, J., Gunasekaran, A., Ding, J.H.: Simulated annealing algorithm for solving the single machine early\/tardy problem. International Journal of Systems Science\u00a027, 605\u2013610 (1996)","journal-title":"International Journal of Systems Science"},{"key":"18_CR30","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1016\/0377-2217(90)90090-X","volume":"47","author":"E. Taillard","year":"1990","unstructured":"Taillard, E.: Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research\u00a047, 65\u201374 (1990)","journal-title":"European Journal of Operational Research"},{"key":"18_CR31","first-page":"646","volume-title":"IEEE International Conference of Computer Design","author":"S.R. White","year":"1984","unstructured":"White, S.R.: Concept of scale in simulated annealing. In: IEEE International Conference of Computer Design, pp. 646\u2013651. IEEE, Los Alamitos (1984)"},{"key":"18_CR32","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/0377-2217(90)90001-R","volume":"46","author":"R.W. Eglese","year":"1990","unstructured":"Eglese, R.W.: Simulated annealing: A tool for operational research. European Journal of Operational Research\u00a046, 271\u2013281 (1990)","journal-title":"European Journal of Operational Research"},{"key":"18_CR33","doi-asserted-by":"publisher","first-page":"1433","DOI":"10.1287\/mnsc.35.12.1433","volume":"35","author":"R. Roundy","year":"1989","unstructured":"Roundy, R.: Rounding off to powers of two in continuous relaxation of capcitated lot sizing problems. Management Science\u00a035, 1433\u20131442 (1989)","journal-title":"Management Science"},{"key":"18_CR34","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1016\/0305-0483(92)90027-5","volume":"20","author":"R. Mallya","year":"1992","unstructured":"Mallya, R.: Multi-product scheduling on a single machine: A case study. OMEGA: International Journal of Management Science\u00a020, 529\u2013534 (1992)","journal-title":"OMEGA: International Journal of Management Science"}],"container-title":["Lecture Notes in Computer Science","Evolutionary Computation in Combinatorial Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-31996-2_18.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,2]],"date-time":"2021-05-02T23:45:08Z","timestamp":1619999108000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-31996-2_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540253372","9783540319962"],"references-count":34,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-31996-2_18","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2005]]}}}