{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T14:21:07Z","timestamp":1761488467545},"publisher-location":"Berlin, Heidelberg","reference-count":23,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540407515"},{"type":"electronic","value":"9783540451853"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1007\/978-3-540-45185-3_11","type":"book-chapter","created":{"date-parts":[[2010,6,22]],"date-time":"2010-06-22T22:12:24Z","timestamp":1277244744000},"page":"110-123","source":"Crossref","is-referenced-by-count":9,"title":["Improving Multi-agent Based Scheduling by Neurodynamic Programming"],"prefix":"10.1007","author":[{"given":"Bal\u00e1zs Csan\u00e1d","family":"Cs\u00e1ji","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Botond","family":"K\u00e1d\u00e1r","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"L\u00e1szl\u00f3","family":"Monostori","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"4","key":"11_CR1","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1016\/S0278-6125(98)80077-0","volume":"17","author":"A.D. Baker","year":"1998","unstructured":"Baker, A.D.: A Survey of Factory Control Algorithms That Can Be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling, and Pull. Journal of Manufacturing Systems\u00a017(4), 297\u2013320 (1998)","journal-title":"Journal of Manufacturing Systems"},{"issue":"5","key":"11_CR2","first-page":"498","volume":"31","author":"J.R. Baker","year":"1985","unstructured":"Baker, J.R., McMahon, G.B.: Scheduling the General Job-Shop. Management Science\u00a031(5), 498\u2013594 (1985)","journal-title":"Management Science"},{"key":"11_CR3","unstructured":"Davis, L.: Job Shop Scheduling with Genetic Algorithms. Int\u2019l Conf. on Genetic Algorithms and Their Application, Pittsburgh, PA, 136\u2013140 (1985)"},{"key":"11_CR4","first-page":"489","volume":"69","author":"F. Croce Della","year":"1993","unstructured":"Della Croce, F., Menga, G., Tadei, R., Cavalotto, M., Petri, L.: Cellular Control of Manufacturing Systems. Eurapean Journal of Operational Research\u00a069, 489\u2013509 (1993)","journal-title":"Eurapean Journal of Operational Research"},{"key":"11_CR5","unstructured":"Duffie, N.A., Piper, R.S., Humphrey, B.J., Hartwick, J.P.: Hierarchical and Non-Hierarchical Manufacturing Cell Control with Dynamic Part-Oriented Scheduling. Proc. of the 14th North American Mfg. ResearchConf., Minneapolis, 504\u2013507 (1986)"},{"key":"11_CR6","doi-asserted-by":"crossref","unstructured":"Falkenauer, E., Bouffouix, S.: A Genetic Algorithm for Job Shop. IEEE Int\u2019l Conf. on Robotics and Automation, Sacramento, CA, April 9-11, 824\u2013829 (1991)","DOI":"10.1109\/ROBOT.1991.131689"},{"issue":"2","key":"11_CR7","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/0736-5845(85)90065-1","volume":"2","author":"J. Hatvany","year":"1985","unstructured":"Hatvany, J.: Intelligence and Cooperation in Heterarchic Manufacturing Systems. Robotics & Computer-Integrated Manufacturing\u00a02(2), 101\u2013104 (1985)","journal-title":"Robotics & Computer-Integrated Manufacturing"},{"key":"11_CR8","volume-title":"Neural Networks, A Comprehensive Foundation","author":"S. Haykin","year":"1999","unstructured":"Haykin, S.: Neural Networks, A Comprehensive Foundation, 2nd edn. Prentice Hall, Englewood Cliffs (1999)","edition":"2"},{"issue":"5","key":"11_CR9","doi-asserted-by":"publisher","first-page":"1249","DOI":"10.1080\/002075498193309","volume":"36","author":"A.S. Jain","year":"1998","unstructured":"Jain, A.S., Meeran, S.: Job-Shop Scheduling Using Neural Networks. International Journal of Production Research\u00a036(5), 1249\u20131272 (1998)","journal-title":"International Journal of Production Research"},{"key":"11_CR10","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1287\/opre.39.3.378","volume":"39","author":"D.S. Johnson","year":"1991","unstructured":"Johnson, D.S., Aragon, C.R., McGeoch, L.A., Schevon, C.: Optimisation by Simulation Annealing: An Experimental Evaluation. Part II (Graph Coloring and Number Partitioning). Operations Research\u00a039, 378\u2013406 (1991)","journal-title":"Operations Research"},{"key":"11_CR11","series-title":"Lecture Notes in Artificial Intelligence","doi-asserted-by":"publisher","first-page":"612","DOI":"10.1007\/3-540-45517-5_68","volume-title":"Engineering of Intelligent Systems","author":"B. K\u00e1d\u00e1r","year":"2001","unstructured":"K\u00e1d\u00e1r, B., Monostori, L.: Approaches to Increase the Performance of Agent-Based Production Systems. In: Monostori, L., V\u00e1ncza, J., Ali, M. (eds.) IEA\/AIE 2001. LNCS (LNAI), vol.\u00a02070, pp. 612\u2013621. Springer, Heidelberg (2001)"},{"key":"11_CR12","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"4598","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimisation by Simulated Annealing. Science\u00a04598, 671\u2013681 (1983)","journal-title":"Science"},{"issue":"4","key":"11_CR13","doi-asserted-by":"publisher","first-page":"441","DOI":"10.1287\/mnsc.24.4.441","volume":"24","author":"B.J. Lageweg","year":"1977","unstructured":"Lageweg, B.J., Lenstra, J.K., Rinnooy Kan, A.H.G.: Job-Shop Scheduling by Implicit Enumeration. Management Science\u00a024(4), 441\u2013450 (1977)","journal-title":"Management Science"},{"key":"11_CR14","series-title":"Logistics of Production and Inventory","first-page":"445","volume-title":"Handbooks in Operations Research and Management Science","author":"E.L. Lawler","year":"1993","unstructured":"Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G., Shmoys, D.B.: Sequencing and Scheduling: Algorithms and Complexity. In: Graves, S.C., et al. (eds.) Handbooks in Operations Research and Management Science, Logistics of Production and Inventory, vol.\u00a04, pp. 445\u2013522. Elsevier, Amsterdam (1993)"},{"key":"11_CR15","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1287\/opre.8.2.219","volume":"8","author":"A.S. Manne","year":"1960","unstructured":"Manne, A.S.: On Job-Shop Scheduling Problem. Operations Research\u00a08, 219\u2013223 (1960)","journal-title":"Operations Research"},{"issue":"2","key":"11_CR16","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1016\/S0007-8506(18)30216-6","volume":"45","author":"L. Monostori","year":"1996","unstructured":"Monostori, L., M\u00e1rkus, A., Van Brussel, H., Westk\u00e4mper, E.: Machine Learning Approaches to Manufacturing. CIRP Annals\u00a045(2), 675\u2013712 (1996)","journal-title":"CIRP Annals"},{"key":"11_CR17","volume-title":"Reinforcement Learning","author":"R.S. Sutton","year":"1998","unstructured":"Sutton, R.S., Barto, A.G.: Reinforcement Learning. The MIT Press, Cambridge (1998)"},{"issue":"2","key":"11_CR18","doi-asserted-by":"publisher","first-page":"535","DOI":"10.1016\/S0007-8506(07)62994-1","volume":"50","author":"K. Ueda","year":"2001","unstructured":"Ueda, K., Markus, A., Monostori, L., Kals, H.J.J., Arai, T.: Emergent synthesis methodologies for manufacturing. Annals of the CIRP\u00a050(2), 535\u2013551 (2001)","journal-title":"Annals of the CIRP"},{"key":"11_CR19","doi-asserted-by":"crossref","unstructured":"Valckenaers, P., Van Brussel, H., Kollingbaum, M., Bochmann, O.: Multi-Agent Coordination and Control Using Stigmergy Applied to Manufacturing Control. European Agent Systems Summer School, Prague, 317-334 (2001)","DOI":"10.1007\/3-540-47745-4_15"},{"issue":"2","key":"11_CR20","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1109\/MCS.1983.1104762","volume":"3","author":"T. Vamos","year":"1983","unstructured":"V\u00e1mos, T.: Co-operative Systems - An Evolutionary Perspective. IEEE Continuous Systems Magazine\u00a03(2), 9\u201314 (1983)","journal-title":"IEEE Continuous Systems Magazine"},{"key":"11_CR21","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/S0166-3615(98)00102-X","volume":"37","author":"H. Brussel Van","year":"1998","unstructured":"Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., Peeters, P.: Reference Architecture for Holonic Manufacturing Systems: PROSA. Computers in Industry\u00a037, 255\u2013274 (1998)","journal-title":"Computers in Industry"},{"issue":"2","key":"11_CR22","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1287\/opre.45.2.288","volume":"45","author":"D.P. Williamson","year":"1997","unstructured":"Williamson, D.P., Hall, L.A., Hoogeveen, J.A., Hurkens, C.A.J., Lenstra, J.K., Sevastjanov, S.V., Shmoys, D.B.: Short Shop Schedules. Operations Research\u00a045(2), 288\u2013294 (1997)","journal-title":"Operations Research"},{"key":"11_CR23","unstructured":"Zhang, W., Dietterich, T.G.: A Reinforcement Learning Approach to Job-Shop Scheduling. In: Proceedings of Fourteens International Joint Conference on Artificial Intelligence, 1114\u20131120 (1995)"}],"container-title":["Lecture Notes in Computer Science","Holonic and Multi-Agent Systems for Manufacturing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-45185-3_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,3,15]],"date-time":"2019-03-15T01:19:15Z","timestamp":1552612755000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-45185-3_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"ISBN":["9783540407515","9783540451853"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-45185-3_11","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2003]]}}}