{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T05:04:17Z","timestamp":1725512657865},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540681540"},{"type":"electronic","value":"9783540681557"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-68155-7_24","type":"book-chapter","created":{"date-parts":[[2008,5,19]],"date-time":"2008-05-19T09:41:20Z","timestamp":1211190080000},"page":"288-292","source":"Crossref","is-referenced-by-count":1,"title":["A Hybrid Approach for Solving Shift-Selection and Task-Sequencing Problems"],"prefix":"10.1007","author":[{"given":"Ada","family":"Barlatt","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Amy M.","family":"Cohn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Oleg","family":"Gusikhin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"24_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/trsc.36.1.1.571","volume":"36","author":"A. Armacost","year":"2002","unstructured":"Armacost, A., Barnhart, C., Ware, K.: Composite Variable Formulations for Express Shipment Service Network Design. Transportation Science\u00a036, 1\u201320 (2002)","journal-title":"Transportation Science"},{"key":"24_CR2","unstructured":"Barlatt, A., Cohn, A., Guisikin, O., Fradin, Y., Morford, C.: Using Composite Variable Modeling to Achieve Realism and Tractability in Production Planning: An Example from Automotive Stamping. Technical Report TR07-01 (2007), \n                    \n                      http:\/\/ioe.engin.umich.edu\/techrprt\/pdf\/TR07-01.pdf"},{"key":"24_CR3","doi-asserted-by":"publisher","first-page":"1308","DOI":"10.1109\/12.29469","volume":"39","author":"D. Bernstein","year":"1989","unstructured":"Bernstein, D., Rodeh, M., Gertner, I.: On the Complexity of Scheduling Problems for Parallel\/Pipelined Machines. IEEE Transactions on Computers\u00a039, 1308\u20131313 (1989)","journal-title":"IEEE Transactions on Computers"},{"key":"24_CR4","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J. Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J., Rinnooy Kan, A.: Scheduling Subject to Resource Constraints: Classification and Complexity. Discrete Applied Mathematics\u00a05, 11\u201324 (1983)","journal-title":"Discrete Applied Mathematics"},{"key":"24_CR5","doi-asserted-by":"publisher","first-page":"1138","DOI":"10.1287\/mnsc.25.11.1138","volume":"25","author":"H. Gabbay","year":"1979","unstructured":"Gabbay, H.: Multi-Stage Production Planning. Management Science\u00a025, 1138\u20131148 (1979)","journal-title":"Management Science"},{"key":"24_CR6","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"M. Garey","year":"1976","unstructured":"Garey, M., Johnson, D., Sethi, R.: The Complexity of Flowshop and Jobshop Scheduling. Mathematics of Operations Research\u00a01, 117\u2013129 (1976)","journal-title":"Mathematics of Operations Research"},{"key":"24_CR7","doi-asserted-by":"publisher","first-page":"157","DOI":"10.2307\/3010564","volume":"50","author":"A. Klose","year":"1999","unstructured":"Klose, A.: An LP-Based Heuristic for Two-Stage Capacitated Facility Location Problems. The Journal of the Operational Research Society\u00a050, 157\u2013166 (1999)","journal-title":"The Journal of the Operational Research Society"},{"key":"24_CR8","doi-asserted-by":"crossref","first-page":"798","DOI":"10.1287\/opre.37.5.798","volume":"37","author":"C. Monma","year":"1989","unstructured":"Monma, C., Potts, C.: On the Complexity of Scheduling with Batch Setup Times. Operations Research\u00a037, 798\u2013804 (1989)","journal-title":"Operations Research"},{"key":"24_CR9","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C. Potts","year":"2000","unstructured":"Potts, C., Kovalyov, M.: Scheduling with Batching: A Review. European Journal of Operational Research\u00a0120, 228\u2013249 (2000)","journal-title":"European Journal of Operational Research"},{"key":"24_CR10","doi-asserted-by":"publisher","first-page":"3023","DOI":"10.1080\/002075497194273","volume":"35","author":"M.M. Qiu","year":"1997","unstructured":"Qiu, M.M., Burch, E.E.: Hierarchical Production Planning and Scheduling in a Multi-Product, Multi-Machine Environment. International Journal of Production Research\u00a035, 3023\u20133042 (1997)","journal-title":"International Journal of Production Research"}],"container-title":["Lecture Notes in Computer Science","Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-68155-7_24.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,3]],"date-time":"2021-05-03T04:38:28Z","timestamp":1620016708000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-68155-7_24"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540681540","9783540681557"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-68155-7_24","relation":{},"subject":[]}}