{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T06:08:18Z","timestamp":1725516498453},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540691334"},{"type":"electronic","value":"9783540691341"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-69134-1_51","type":"book-chapter","created":{"date-parts":[[2008,8,12]],"date-time":"2008-08-12T16:07:43Z","timestamp":1218557263000},"page":"519-528","source":"Crossref","is-referenced-by-count":3,"title":["Self-adaptive Agent-Based Dynamic Scheduling for a Semiconductor Manufacturing Factory"],"prefix":"10.1007","author":[{"given":"Horng-Ren","family":"Tsai","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Toly","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"3","key":"51_CR1","doi-asserted-by":"publisher","first-page":"374","DOI":"10.1109\/66.311341","volume":"7","author":"S.C.H. Lu","year":"1994","unstructured":"Lu, S.C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant. IEEE Transactions on Semiconductor Manufacturing\u00a07(3), 374\u2013388 (1994)","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"51_CR2","first-page":"276","volume":"6","author":"D.B. Albert","year":"1996","unstructured":"Albert, D.B.: A survey of factory control algorithms which can be implemented in a multi-agent hierarchy: dispatching, scheduling and pull. Journal of Manufacturing System\u00a06, 276\u2013289 (1996)","journal-title":"Journal of Manufacturing System"},{"key":"51_CR3","doi-asserted-by":"crossref","unstructured":"Li, L., Qiao, F., Wu, Q.: Agent-based dynamic scheduling for semiconductor wafer fab. In: Proceedings of IEEE Semiconductor Symposium, pp. 163\u2013168 (2005)","DOI":"10.1109\/ICNSC.2005.1461180"},{"key":"51_CR4","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1016\/S0165-0114(98)00336-4","volume":"115","author":"M.A.S. Monfared","year":"2000","unstructured":"Monfared, M.A.S., Steiner, S.J.: Fuzzy adaptive scheduling and control systems. Fuzzy Sets and Systems\u00a0115, 231\u2013246 (2000)","journal-title":"Fuzzy Sets and Systems"},{"issue":"1","key":"51_CR5","first-page":"55","volume":"10","author":"P.-C. Chang","year":"2003","unstructured":"Chang, P.-C., Hsieh, J.-C.: A Neural Networks Approach for Due-date Assignment in a Wafer Fabrication Factory. International Journal of Industrial Engineering\u00a010(1), 55\u201361 (2003)","journal-title":"International Journal of Industrial Engineering"},{"key":"51_CR6","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1016\/S1568-4946(02)00066-2","volume":"2\/3F","author":"T. Chen","year":"2003","unstructured":"Chen, T.: A Fuzzy Back Propagation Network for Output Time Prediction in a Wafer Fab. Journal of Applied Soft Computing\u00a02\/3F, 211\u2013222 (2003)","journal-title":"Journal of Applied Soft Computing"},{"key":"51_CR7","series-title":"Lecture Notes in Artificial Intelligence","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-44593-5_46","volume-title":"Case-Based Reasoning Research and Development","author":"P.-C. Chang","year":"2001","unstructured":"Chang, P.-C., Hsieh, J.-C., Liao, T.W.: A Case-based Reasoning Approach for Due Date Assignment in a Wafer Fabrication Factory. In: Aha, D.W., Watson, I. (eds.) ICCBR 2001. LNCS (LNAI), vol.\u00a02080. Springer, Heidelberg (2001)"},{"key":"51_CR8","doi-asserted-by":"publisher","first-page":"549","DOI":"10.1007\/s10845-005-1663-4","volume":"16","author":"P.-C. Chang","year":"2005","unstructured":"Chang, P.-C., Hsieh, J.-C., Liao, T.W.: Evolving Fuzzy Rules for Due-date Assignment Problem in Semiconductor Manufacturing Factory. Journal of Intelligent Manufacturing\u00a016, 549\u2013557 (2005)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"51_CR9","doi-asserted-by":"publisher","first-page":"198","DOI":"10.1016\/j.asoc.2004.12.004","volume":"6","author":"P.-C. Chang","year":"2006","unstructured":"Chang, P.-C., Liao, T.W.: Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Applied Soft Computing\u00a06, 198\u2013206 (2006)","journal-title":"Applied Soft Computing"},{"issue":"5","key":"51_CR10","first-page":"910","volume":"5","author":"T. Chen","year":"2006","unstructured":"Chen, T.: A Look-ahead Back Propagation Network to Predict Wafer Lot Output Time. WSEAS Transactions on Computers\u00a05(5), 910\u2013915 (2006)","journal-title":"WSEAS Transactions on Computers"},{"issue":"5","key":"51_CR11","first-page":"817","volume":"5","author":"T. Chen","year":"2006","unstructured":"Chen, T., Tsai, H.R., Wu, H.C.: Wafer Lot Output Time Prediction with a Hybrid Artificial Neural Network. WSEAS Transactions on Computers\u00a05(5), 817\u2013823 (2006)","journal-title":"WSEAS Transactions on Computers"}],"container-title":["Lecture Notes in Computer Science","From Animals to Animats 10"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-69134-1_51.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,3]],"date-time":"2021-05-03T04:26:27Z","timestamp":1620015987000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-69134-1_51"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540691334","9783540691341"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-69134-1_51","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[]}}