{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T13:52:03Z","timestamp":1725889923914},"publisher-location":"Berlin, Heidelberg","reference-count":32,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540695646"},{"type":"electronic","value":"9783540695660"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-69566-0_34","type":"book-chapter","created":{"date-parts":[[2008,7,31]],"date-time":"2008-07-31T06:39:05Z","timestamp":1217486345000},"page":"427-441","source":"Crossref","is-referenced-by-count":5,"title":["An Empirical Study Identifying High Perceived Value Practices of CMMI Level 2"],"prefix":"10.1007","author":[{"given":"Mahmood","family":"Niazi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Muhammad","family":"Ali Babar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Suhaimi","family":"Ibrahim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"34_CR1","volume-title":"CMMI Guidelines for Process Integration and Product Improvement","author":"M. Chrissis","year":"2003","unstructured":"Chrissis, M., Konrad, M., Shrum, S.: CMMI Guidelines for Process Integration and Product Improvement. Addison-Wesley, Reading (2003)"},{"key":"34_CR2","volume-title":"Proceedings of 16th International Conference on Software Engineering (ICSE 1994)","author":"J.G. Brodman","year":"1994","unstructured":"Brodman, J.G., Johnson, D.L.: What Small Businesses and Small Organizations Say About the CMMI. In: Proceedings of 16th International Conference on Software Engineering (ICSE 1994). IEEE Computer Society Press, Los Alamitos (1994)"},{"key":"34_CR3","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1002\/1099-1670(200012)5:4<243::AID-SPIP126>3.0.CO;2-0","volume":"5","author":"J. Batista","year":"2000","unstructured":"Batista, J., Dias, d.F.: Software Process Improvement in a Very Small Team: a Case with CMM. Software Process-Improvement and Practice\u00a0(5), 243\u2013250 (2000)","journal-title":"Software Process-Improvement and Practice"},{"key":"34_CR4","unstructured":"Paulk, M.: Using the Software CMM in small organizations. In: The Joint 1998 Proceedings of the Pacific Northwest Software Quality Conference and the Eighth International Conference on Software Quality, Portland, pp. 350\u2013361 (1998)"},{"key":"34_CR5","doi-asserted-by":"crossref","unstructured":"Conradi, R., Fuggetta, A.: Improving Software Process Improvement, July\/August (2002), pp. 92\u201399. IEEE Software (2002)","DOI":"10.1109\/MS.2002.1020295"},{"key":"34_CR6","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1002\/spip.223","volume":"10","author":"F.G. Wilkie","year":"2005","unstructured":"Wilkie, F.G., McFall, D., McCaffery, F.: An Evaluation of CMMI Process Areas for Small to Medium-sized Software Development Organisations. SOFTWARE PROCESS IMPROVEMENT AND PRACTICE\u00a010, 189\u2013201 (2005)","journal-title":"SOFTWARE PROCESS IMPROVEMENT AND PRACTICE"},{"key":"34_CR7","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"118","DOI":"10.1007\/978-3-540-73460-4_13","volume-title":"Product-Focused Software Process Improvement","author":"M. Niazi","year":"2007","unstructured":"Niazi, M., Babar, M.: Ali: De-motivators for software process improvement: An Analysis of Vietnamese Practitioners\u2019 Views. In: M\u00fcnch, J., Abrahamsson, P. (eds.) PROFES 2007. LNCS, vol.\u00a04589, pp. 118\u2013131. Springer, Heidelberg (2007)"},{"key":"34_CR8","doi-asserted-by":"crossref","unstructured":"Niazi, M., Babar, M.: Ali: Motivators of Software Process Improvement: An Analysis of Vietnamese Practitioners\u2019 Views. In: International Conference on Evaluation and Assessment in Software Engineering (EASE 2007), pp. 79\u201388 (2007)","DOI":"10.14236\/ewic\/EASE2007.11"},{"issue":"2","key":"34_CR9","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1016\/S0164-1212(01)00122-4","volume":"62","author":"A. Rainer","year":"2002","unstructured":"Rainer, A., Hall, T.: Key success factors for implementing software process improvement: a maturity-based analysis. Journal of Systems & Software\u00a062(2), 71\u201384 (2002)","journal-title":"Journal of Systems & Software"},{"issue":"2","key":"34_CR10","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1016\/j.jss.2003.10.017","volume":"74","author":"M. Niazi","year":"2005","unstructured":"Niazi, M., Wilson, D., Zowghi, D.: A Maturity Model for the Implementation of Software Process Improvement: An empirical study. Journal of Systems and Software\u00a074(2), 155\u2013172 (2005)","journal-title":"Journal of Systems and Software"},{"key":"34_CR11","volume-title":"Research Methods and Statistics in Psychology","author":"H. Coolican","year":"1999","unstructured":"Coolican, H.: Research Methods and Statistics in Psychology. Hodder and Stoughton, London (1999)"},{"key":"34_CR12","unstructured":"Trewin and D: Small Business in Australia: 2001. Australian Bureau of Statistics report 1321.0 (2002)"},{"key":"34_CR13","doi-asserted-by":"crossref","unstructured":"El Emam, K., Madhavji, H.N.: A Field Study of Requirements Engineering Practices in Information Systems Development. In: Second International Symposium on Requirements Engineering, pp. 68\u201380 (1995)","DOI":"10.1109\/ISRE.1995.512547"},{"key":"34_CR14","unstructured":"Standish-Group: Chaos: A Recipe for Success. Standish Group International (1999)"},{"key":"34_CR15","doi-asserted-by":"crossref","unstructured":"Hall, T., Beecham, S., Rainer, A.: Requirements Problems in Twelve Software Companies: An Empirical Analysis. In: IEE Proceedings - Software, August 2002, pp. 153\u2013160 (2002)","DOI":"10.1049\/ip-sen:20020694"},{"key":"34_CR16","unstructured":"Jobserve.com: UK Wasting Billions on IT Projects (21\/4\/2004), http:\/\/www.jobserve.com\/news\/NewsStory.asp?e=e&SID=SID2598"},{"key":"34_CR17","volume-title":"Software Engineering","author":"I. Sommerville","year":"1996","unstructured":"Sommerville, I.: Software Engineering, 5th edn. Addison-Wesley, Reading (1996)","edition":"5"},{"key":"34_CR18","unstructured":"Rauterberg, M., Strohm, O.: About the Benefits of User-Oriented Requirements Engineering. In: Proceedings of the First International Workshop on Requirements Engineering: Foundation of Software Quality (REFSQ 1994) (1994)"},{"issue":"1","key":"34_CR19","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1109\/64.391959","volume":"10","author":"M. DeBillis","year":"1995","unstructured":"DeBillis, M., Haapala, C.: User-Centric Software Engineering. IEEE Expert\u00a010(1), 34\u201341 (1995)","journal-title":"IEEE Expert"},{"key":"34_CR20","unstructured":"Niazi, M.: An empirical study for the improvement of requirements engineering process. In: The 17th International Conference on Software Engineering and Knowledge Engineering, Taiwan, Republic of China, July 14-16, 2005, pp. 396\u2013399 (2005)"},{"key":"34_CR21","doi-asserted-by":"crossref","unstructured":"Niazi, M., Shastry, S.: Role of Requirements Engineering in Software development Process: An empirical study. In: IEEE International Multi-Topic Conference (INMIC 2003), pp. 402\u2013407 (2003)","DOI":"10.1109\/INMIC.2003.1416759"},{"key":"34_CR22","unstructured":"Niazi, M., Cox, K., Verner, J.: An empirical study identifying high perceived value requirements engineering practices. In: Fourteenth International Conference on Information Systems Development (ISD 2005), Karlstad University, Sweden, August 15-17 (2005)"},{"issue":"1","key":"34_CR23","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1145\/1044834.1044837","volume":"14","author":"I. Sommerville","year":"2005","unstructured":"Sommerville, I., Ransom, J.: An empirical study of industrial requirements engineering process assessment and improvement. ACM Transactions on Software Engineering and Methodology\u00a014(1), 85\u2013117 (2005)","journal-title":"ACM Transactions on Software Engineering and Methodology"},{"issue":"1-2","key":"34_CR24","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1023\/A:1013168927238","volume":"3","author":"E.J. Barry","year":"2002","unstructured":"Barry, E.J., Mukhopadhyay, T., Slaughter, S.A.: Software Project Duration and Effort: An Empirical Study. Information Technology and Management\u00a03(1-2), 113\u2013136 (2002)","journal-title":"Information Technology and Management"},{"key":"34_CR25","doi-asserted-by":"crossref","unstructured":"Zowghi, D., Nurmuliani, N.: A study of the impact of requirements volatility on software project performance. In: Ninth Asia-Pacific Software Engineering Conference, pp. 3\u201311 (2002)","DOI":"10.1109\/APSEC.2002.1182970"},{"key":"34_CR26","doi-asserted-by":"publisher","first-page":"293","DOI":"10.1002\/(SICI)1096-908X(199909\/10)11:5<293::AID-SMR198>3.0.CO;2-R","volume":"11","author":"G. Stark","year":"1999","unstructured":"Stark, G., Skillicorn, A., Ameele, R.: An Examination of the Effects of Requirements Changes on Software Maintenance Releases. Journal of Software Maintenance: Research and Practice\u00a011, 293\u2013309 (1999)","journal-title":"Journal of Software Maintenance: Research and Practice"},{"key":"34_CR27","doi-asserted-by":"crossref","unstructured":"Zowghi, D., Nurmuliani, N., Powell, S.: The Impact of Requirements Volatility on Software Development Lifecycle. In: Proceedings of Software Engineering Conference, Australian, pp. 28\u201337 (2004)","DOI":"10.1109\/ASWEC.2004.1290455"},{"issue":"1","key":"34_CR28","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1109\/MS.2005.12","volume":"22","author":"J. Verner","year":"2005","unstructured":"Verner, J., Evanco, W.M.: In-house Software Development: What Software Project Management Practices Lead to Success? IEEE Software\u00a022(1), 86\u201393 (2005)","journal-title":"IEEE Software"},{"key":"34_CR29","doi-asserted-by":"crossref","unstructured":"Kobitzsch, W., Rombach, D., Feldmann, R.L.: Outsourcing in India. IEEE Software, 78\u201386 (2001)","DOI":"10.1109\/52.914751"},{"key":"34_CR30","volume-title":"INROADS to software quality","author":"A. Jarvis","year":"1997","unstructured":"Jarvis, A., Crandall, V.: INROADS to software quality. Prentice-Hall, Inc., Englewood Cliffs (1997)"},{"key":"34_CR31","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1023\/A:1021764731148","volume":"8","author":"S. Beecham","year":"2003","unstructured":"Beecham, S., Hall, T., Rainer, A.: Software Process Problems in Twelve Software Companies: An Empirical Analysis. Empirical software engineering\u00a08, 7\u201342 (2003)","journal-title":"Empirical software engineering"},{"issue":"2","key":"34_CR32","doi-asserted-by":"publisher","first-page":"204","DOI":"10.1016\/j.jss.2004.09.001","volume":"78","author":"M. Niazi","year":"2005","unstructured":"Niazi, M., Wilson, D., Zowghi, D.: A Framework for Assisting the Design of Effective Software Process Improvement Implementation Strategies. Journal of Systems and Software\u00a078(2), 204\u2013222 (2005)","journal-title":"Journal of Systems and Software"}],"container-title":["Lecture Notes in Computer Science","Product-Focused Software Process Improvement"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-69566-0_34.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T05:01:24Z","timestamp":1605762084000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-69566-0_34"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540695646","9783540695660"],"references-count":32,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-69566-0_34","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[]}}