{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,13]],"date-time":"2026-03-13T13:25:34Z","timestamp":1773408334272,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":13,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540699941","type":"print"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-69995-8_28","type":"book-chapter","created":{"date-parts":[[2007,8,10]],"date-time":"2007-08-10T16:28:21Z","timestamp":1186763301000},"page":"169-174","source":"Crossref","is-referenced-by-count":4,"title":["A New Approach for Mixed-Model Assembly Line Sequencing"],"prefix":"10.1007","author":[{"given":"Masoud","family":"Rabbani","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alireza","family":"Rahimi-Vahed","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Babak","family":"Javadi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Reza","family":"Tavakkoli-Moghaddam","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"28_CR1","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1080\/00207549208942876","volume":"30","author":"J. F. Bard","year":"1992","unstructured":"Bard, J. F., Dar-El, E. M., Shtub, A. An analytic framework for sequencing mixed model. International Journal of Production Research 1992; 30: 35\u201348.","journal-title":"International Journal of Production Research"},{"key":"28_CR2","doi-asserted-by":"publisher","first-page":"2431","DOI":"10.1080\/00207549408957076","volume":"32","author":"J. F. Bard","year":"1994","unstructured":"Bard, J. F., Shtub, A., Joshi, S. B. Sequencing mixed-model assembly lines to level parts usage and minimize the length. International Journal of Production Research 1994; 32: 2431\u20132454.","journal-title":"International Journal of Production Research"},{"issue":"7\u20138","key":"28_CR3","doi-asserted-by":"publisher","first-page":"675","DOI":"10.1016\/S0305-0548(98)00026-4","volume":"25","author":"C.J. Hyun","year":"1998","unstructured":"Hyun, C.J., Kim, Y., Kim, Y.K. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers and Operations Research 1998; 25(7\u20138): 675\u2013690","journal-title":"Computers and Operations Research"},{"issue":"5","key":"28_CR4","doi-asserted-by":"publisher","first-page":"504","DOI":"10.1080\/095372898233984","volume":"9","author":"P.R. McMullen","year":"1998","unstructured":"McMullen, P.R. JIT sequencing for mixed-model assembly lines with setups using tabu search Production Planning and Control 9 1998; (5): 504\u2013510","journal-title":"Production Planning and Control"},{"key":"28_CR5","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/S0360-8352(01)00059-6","volume":"41","author":"P.R. McMullen","year":"2001","unstructured":"McMullen, P.R. An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics. Computers and Industrial Engineering 2001a; 41: 335\u2013353.","journal-title":"Computers and Industrial Engineering"},{"key":"28_CR6","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0925-5273(00)00091-8","volume":"72","author":"P.R. McMullen","year":"2001","unstructured":"McMullen, P.R. A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem. International Journal of Production Economics 2001b; 72: 59\u201371.","journal-title":"International Journal of Production Economics"},{"key":"28_CR7","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1016\/S0954-1810(01)00004-8","volume":"15","author":"P.R. McMullen","year":"2001","unstructured":"McMullen, P.R. An ant colony optimization approach to addressing a JIT sequencing problem with multiple objectives. Artificial Intelligence in Engineering 2001c; 15: 309\u2013317.","journal-title":"Artificial Intelligence in Engineering"},{"issue":"2","key":"28_CR8","doi-asserted-by":"publisher","first-page":"192","DOI":"10.1287\/mnsc.35.2.192","volume":"35","author":"J. Miltenburg","year":"1989","unstructured":"Miltenburg, J. Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science 1989; 35(2): 192\u2013207.","journal-title":"Management Science"},{"key":"28_CR9","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1016\/0895-7177(90)90370-3","volume":"13","author":"J. Miltenburg","year":"1990","unstructured":"Miltenburg, J., Steiner, G., Yeomans, S. A dynamic programming algorithm for scheduling mixed-model just-in-time production systems. Mathematical Computation Modeling 1990; 13: 57\u201366.","journal-title":"Mathematical Computation Modeling"},{"key":"28_CR10","volume-title":"Toyota production system","author":"Y. Monden","year":"1983","unstructured":"Monden, Y. Toyota production system. Institute if industrial engineers Press. Atlanta, GA: 1983."},{"key":"28_CR11","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1287\/mnsc.17.4.B141","volume":"17","author":"R.E. Bellman","year":"1970","unstructured":"Bellman, R.E., Zadeh, L.A. Decision making in a fuzzy environment, Management Sciences 1970; 17: 141\u2013164.","journal-title":"Management Sciences"},{"key":"28_CR12","doi-asserted-by":"crossref","unstructured":"Collette, Y., Siarry, P. Multiobjective Optimization: Principles and Case Studies. Springer, 2003.","DOI":"10.1007\/978-3-662-08883-8"},{"key":"28_CR13","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1016\/0165-0114(81)90002-6","volume":"6","author":"E.L. Hannan","year":"1981","unstructured":"Hannan, E.L. Linear programming with multiple goals, Fuzzy Sets and Systems 1981; 6: 235\u2013164","journal-title":"Fuzzy Sets and Systems"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2006"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-69995-8_28.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T05:06:10Z","timestamp":1605762370000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-69995-8_28"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540699941"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-69995-8_28","relation":{},"subject":[]}}