{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T22:29:30Z","timestamp":1725488970826},"publisher-location":"Berlin, Heidelberg","reference-count":38,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540699941"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-69995-8_80","type":"book-chapter","created":{"date-parts":[[2007,8,10]],"date-time":"2007-08-10T16:28:21Z","timestamp":1186763301000},"page":"503-508","source":"Crossref","is-referenced-by-count":2,"title":["Supply Chain Management and Advanced Planning in the Process Industries"],"prefix":"10.1007","author":[{"given":"Norbert","family":"Trautmann","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Cord-Ulrich","family":"F\u00fcndeling","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"80_CR1","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/S0019-0578(97)00018-9","volume":"36","author":"G. Applequist","year":"1997","unstructured":"Applequist G, Samikoglu O, Pekny K, Reklaitis GV (1997) Issues in the use, design and evolution of process scheduling and planning systems. ISA Transactions 36:81\u2013121","journal-title":"ISA Transactions"},{"key":"80_CR2","doi-asserted-by":"publisher","first-page":"913","DOI":"10.1016\/j.compchemeng.2003.09.004","volume":"28","author":"G. Berning","year":"2004","unstructured":"Berning G, Brandenburg M, G\u00fcrsoy K, Kussi JS, Mehta V, T\u00f6lle FJ (2004) Integrating collaborative planning and supply chain optimization for the chemical process industry (I)\u2014methodology. Computers and Chemical Engineering 28:913\u2013927","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR3","unstructured":"Blackstone JH, Cox JF (2002) APICS dictionary. APICS"},{"key":"80_CR4","doi-asserted-by":"publisher","first-page":"659","DOI":"10.1016\/S0098-1354(00)00388-4","volume":"24","author":"G. Blau","year":"2000","unstructured":"Blau G, Mehta B, Bose S, Pekny J, Sinclair G, Keunker K, Bunch P (2000) Risk management in the development of new products in highly regulated industries. Computers and Chemical Engineering 24:659\u2013664","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR5","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1111\/j.0737-6782.2004.00075.x","volume":"21","author":"G.E. Blau","year":"2004","unstructured":"Blau GE, Pekny JF, Varma VA, Bunch PR (2004) Managing a portfolio of interdependent new product candidates in the pharmaceutical industry. Journal of Product Innovation Management 21:227\u2013245","journal-title":"Journal of Product Innovation Management"},{"key":"80_CR6","doi-asserted-by":"publisher","first-page":"1029","DOI":"10.1080\/002075400189004","volume":"38","author":"F. Bl\u00f6mer","year":"2000","unstructured":"Bl\u00f6mer F, G\u00fcnther HO (2000) LP-based heuristics for scheduling chemical batch processes. International Journal of Production Research 38:1029\u20131051","journal-title":"International Journal of Production Research"},{"key":"80_CR7","doi-asserted-by":"publisher","first-page":"1279","DOI":"10.1021\/ie990526w","volume":"39","author":"J.K. Bok","year":"2000","unstructured":"Bok JK, Grossmann IE, Park S (2000) Supply chain optimization in continuous flexible process networks. Industrial Engineering and Chemistry Research 39:1279\u20131290","journal-title":"Industrial Engineering and Chemistry Research"},{"key":"80_CR8","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1023\/A:1018959704264","volume":"96","author":"P. Brucker","year":"2000","unstructured":"Brucker P, Hurink J (2000) Solving a chemical batch scheduling problem by local search. Annals of Operations Research 96:17\u201338","journal-title":"Annals of Operations Research"},{"key":"80_CR9","doi-asserted-by":"publisher","first-page":"1752","DOI":"10.1016\/j.compchemeng.2005.02.037","volume":"29","author":"R.E. Burkhard","year":"2005","unstructured":"Burkhard RE, Hatzl J (2005) Review, extensions and computational comparison of MILP formulations for scheduling batch processes. Computers and Chemical Engineering 29:1752\u20131769","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR10","doi-asserted-by":"publisher","first-page":"1131","DOI":"10.1016\/j.compchemeng.2003.09.014","volume":"28","author":"C.L. Chen","year":"2004","unstructured":"Chen CL, Lee WC (2004) Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices. Computers and Chemical Engineering 28:1131\u20131144","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR11","unstructured":"Chopra S, Meindl P (2007) Supply Chain Management. Prentice Hall"},{"key":"80_CR12","doi-asserted-by":"publisher","first-page":"599","DOI":"10.1016\/j.compchemeng.2005.10.017","volume":"30","author":"A. Dietz","year":"2006","unstructured":"Dietz A, Azzaro-Pantel C, Pibouleau L, Domenech S (2006) Multiobjective optimization for multiproduct batch plant design under economic and environmental considerations. Computers and Chemical Engineering 30:599\u2013613","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR13","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1080\/09537280110061548","volume":"13","author":"S.D.P. Flapper","year":"2002","unstructured":"Flapper SDP, Fransoo JC, Broekmeulen RACM, Inderfurth K (2002) Planning and control of rework in the process industries: a review. Production Planning & Control 13:26\u201334","journal-title":"Production Planning & Control"},{"key":"80_CR14","doi-asserted-by":"crossref","unstructured":"Fleischmann B, Meyr H, Wagner M (2005) Advanced planning. In: Stadtler H, Kilger C (eds) Supply Chain Management and Advanced Planning. Springer","DOI":"10.1007\/3-540-24814-5_5"},{"key":"80_CR15","doi-asserted-by":"publisher","first-page":"2109","DOI":"10.1016\/j.compchemeng.2004.05.002","volume":"28","author":"C.F. Floudas","year":"2004","unstructured":"Floudas CF, Lin X (2004) Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Computers and Chemical Engineering 28:2109\u20132129","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR16","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1108\/01443579410072382","volume":"14","author":"J.C. Fransoo","year":"1993","unstructured":"Fransoo JC, Rutten W (1993) A typology of production control situations in process industries. International Journal of Operations & Production Management 14:47\u201357","journal-title":"International Journal of Operations & Production Management"},{"key":"80_CR17","unstructured":"F\u00fcndeling CU, Trautmann N (2007) Belegungsplanung einer Make&Pack-Anlage mit kontinuierlicher Prozessf\u00fchrung: eine Fallstudie. In: G\u00fcnther HO, Mattfeld DC, Suhl L (eds) Supply Network and Logistics Management. Physica"},{"key":"80_CR18","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1007\/s00291-002-0098-y","volume":"24","author":"M. Grunow","year":"2002","unstructured":"Grunow M, G\u00fcnther HO, Lehmann M (2002) Campaign planning for multistage batch processes in the chemical industry. OR Spectrum 24:281\u2013314","journal-title":"OR Spectrum"},{"key":"80_CR19","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1007\/s00291-002-0117-z","volume":"25","author":"M. Grunow","year":"2003","unstructured":"Grunow M, G\u00fcnther HO, Yang G (2003) Plant co-ordination in pharmaceutics supply networks. OR Spectrum 25:109\u2013141","journal-title":"OR Spectrum"},{"key":"80_CR20","doi-asserted-by":"publisher","first-page":"3711","DOI":"10.1080\/00207540600589127","volume":"44","author":"H.O. G\u00fcnther","year":"2006","unstructured":"G\u00fcnther HO, Grunow M, Neuhaus U (2006) Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO. International Journal of Production Research 44:3711\u20133726","journal-title":"International Journal of Production Research"},{"key":"80_CR21","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.compchemeng.2005.08.009","volume":"30","author":"R. Guirardello","year":"2005","unstructured":"Guirardello R, Swaney RE (2005) Optimization of process plant layout with pipe routing. Computers and Chemical Engineering 30:99\u2013114","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR22","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1007\/s00291-005-0015-2","volume":"28","author":"V.C. Iv\u0102nescu","year":"2006","unstructured":"Iv\u0102nescu VC, Fransoo JC, Bertrand JWM (2006) A hybrid policy for order acceptance in batch process industries. OR Spectrum 28:199\u2013222","journal-title":"OR Spectrum"},{"key":"80_CR23","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J. Kallrath","year":"2002","unstructured":"Kallrath J (2002a) Planning and scheduling in the process industry. OR Spectrum 24:219\u2013250","journal-title":"OR Spectrum"},{"key":"80_CR24","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1007\/s00291-002-0102-6","volume":"24","author":"J. Kallrath","year":"2002","unstructured":"Kallrath J (2002b) Combined strategic and operational planning \u2014 an MILP success story in chemical industry. OR Spectrum 24:315\u2013341","journal-title":"OR Spectrum"},{"key":"80_CR25","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1007\/s10479-005-3976-2","volume":"140","author":"J. Kallrath","year":"2005","unstructured":"Kallrath J (2005) Solving planning and design problems in the process industry using mixed integer and global optimization. Annals of Operations Research 140:339\u2013373","journal-title":"Annals of Operations Research"},{"key":"80_CR26","doi-asserted-by":"publisher","first-page":"5071","DOI":"10.1080\/00207540500161068","volume":"43","author":"M. L\u00fctke Entrup","year":"2005","unstructured":"L\u00fctke Entrup M, G\u00fcnther HO, van Beek P, Grunow M, Seiler T (2005) Mixed-integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production. International Journal of Production Research 43:5071\u20135100","journal-title":"International Journal of Production Research"},{"key":"80_CR27","doi-asserted-by":"publisher","first-page":"1021","DOI":"10.1016\/j.compchemeng.2003.09.019","volume":"28","author":"C.T. Maravelias","year":"2004","unstructured":"Maravelias CT, Grossmann IE (2004a) Optimal resource investment and scheduling of tests for new product development. Computers and Chemical Engineering 28:1021\u20131038","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR28","doi-asserted-by":"publisher","first-page":"1921","DOI":"10.1016\/j.compchemeng.2004.03.016","volume":"28","author":"C.T. Maravelias","year":"2004","unstructured":"Maravelias CT, Grossmann IE (2004b) A hybrid MILP\/CP decomposition approach for the continuous time scheduling of multipurpose batch plants. Computers and Chemical Engineering 28:1921\u20131949","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR29","doi-asserted-by":"publisher","first-page":"913","DOI":"10.1016\/j.compchemeng.2006.02.008","volume":"30","author":"C.A. M\u00e9ndez","year":"2006","unstructured":"M\u00e9ndez CA, Cerd\u00e1 J, Grossmann IE, Harjunkoski I, Fahl M (2006) State-of-the-art review of optimization methods for short-term scheduling of batch processes. Computers and Chemical Engineering 30:913\u2013946","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR30","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1007\/s00291-002-0100-8","volume":"24","author":"K. Neumann","year":"2002","unstructured":"Neumann K, Schwindt C, Trautmann N (2002) Advanced production scheduling for batch plants in process industries. OR Spectrum 24:251\u2013279","journal-title":"OR Spectrum"},{"key":"80_CR31","doi-asserted-by":"publisher","first-page":"S1027","DOI":"10.1016\/S0098-1354(98)00206-3","volume":"22","author":"C.W. Schmidt","year":"1998","unstructured":"Schmidt CW, Grossmann IE, Blau GE (1998) Optimization of industrial scale scheduling problems in new product development. Computers and Chemical Engineering 22:S1027\u2013S1030","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR32","doi-asserted-by":"publisher","first-page":"929","DOI":"10.1016\/j.compchemeng.2003.09.022","volume":"28","author":"N. Shah","year":"2004","unstructured":"Shah N (2004) Pharmaceutical supply chains: key issues and strategies for optimisation. Computers and Chemical Engineering 28:929\u2013941","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR33","doi-asserted-by":"publisher","first-page":"1225","DOI":"10.1016\/j.compchemeng.2005.02.023","volume":"29","author":"N. Shah","year":"2005","unstructured":"Shah N (2005) Process industry supply chains: advances and challenges. Computers and Chemical Engineering 29:1225\u20131235","journal-title":"Computers and Chemical Engineering"},{"key":"80_CR34","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1080\/00207540412331285823","volume":"43","author":"C. Suerie","year":"2005","unstructured":"Suerie C (2005) Campaign planning in time-indexed model formulations. International Journal of Production Research 43:49\u201366","journal-title":"International Journal of Production Research"},{"key":"80_CR35","first-page":"9","volume":"22","author":"S.G. Taylor","year":"1981","unstructured":"Taylor SG, Seward SM, Bolander SF (1981) Why the process industries are different. Production and Inventory Management Journal 22:9\u201324","journal-title":"Production and Inventory Management Journal"},{"key":"80_CR36","doi-asserted-by":"publisher","first-page":"422","DOI":"10.1016\/S0377-2217(99)00301-X","volume":"126","author":"C.H. Timpe","year":"2000","unstructured":"Timpe CH, Kallrath J (2000) Optimal planning in large multi-site production networks. European Journal of Operational Research 126:422\u2013435","journal-title":"European Journal of Operational Research"},{"key":"80_CR37","doi-asserted-by":"publisher","first-page":"3585","DOI":"10.1021\/ie0100030","volume":"40","author":"P. Tsiakis","year":"2001","unstructured":"Tsiakis P, Shah N, Pantelides CC (2001) Design of multi-echelon supply chain networks under demand uncertainty. Industrial and Engineering Chemistry Research 40:3585\u20133604","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"80_CR38","doi-asserted-by":"publisher","first-page":"449","DOI":"10.1007\/s002910200112","volume":"24","author":"F.H.E. Wouda","year":"2002","unstructured":"Wouda FHE, van Beek P, van der Vorst JGAJ, Tacke H (2002) An application of mixed-integer linear programming models on the redesign of the supply network of Nutricia Dairy & Drinks Group in Hungary. OR Spectrum 24:449\u2013465","journal-title":"OR Spectrum"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2006"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-69995-8_80.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T05:06:36Z","timestamp":1605762396000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-69995-8_80"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540699941"],"references-count":38,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-69995-8_80","relation":{},"subject":[]}}