{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T22:29:30Z","timestamp":1725488970477},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540699941"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-69995-8_84","type":"book-chapter","created":{"date-parts":[[2007,8,10]],"date-time":"2007-08-10T12:28:21Z","timestamp":1186748901000},"page":"529-534","source":"Crossref","is-referenced-by-count":0,"title":["Priority-Rule Methods for Project Scheduling with Work Content Constraints"],"prefix":"10.1007","author":[{"given":"Cord-Ulrich","family":"F\u00fcndeling","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"84_CR1","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P. Brucker","year":"1999","unstructured":"Brucker P, Drexl A, M\u00f6hring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112:3\u201341","journal-title":"European Journal of Operational Research"},{"key":"84_CR2","first-page":"1059","volume":"32","author":"E. Demeulemeester","year":"2000","unstructured":"Demeulemeester E, De Reyck B, Herroelen W (2000) The discrete time\/resource trade-off problem in project networks: A branch-and-bound approach. IIE Transactions 32:1059\u20131069","journal-title":"IIE Transactions"},{"key":"84_CR3","doi-asserted-by":"publisher","first-page":"553","DOI":"10.1002\/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO;2-1","volume":"45","author":"B. Reyck De","year":"1998","unstructured":"De Reyck B, Demeulemeester E, Herroelen W (1998) Local search methods for the discrete time\/resource trade-off problem in project networks. Naval Research Logistics 45:553\u2013578","journal-title":"Naval Research Logistics"},{"key":"84_CR4","volume-title":"Ressourcenbeschr\u00e4nkte Projektplanung bei vorgegebenen Arbeitsvolumina","author":"C.U. F\u00fcndeling","year":"2006","unstructured":"F\u00fcndeling CU (2006) Ressourcenbeschr\u00e4nkte Projektplanung bei vorgegebenen Arbeitsvolumina. Deutscher Universit\u00e4ts-Verlag, Wiesbaden"},{"key":"84_CR5","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W. Herroelen","year":"1998","unstructured":"Herroelen W, De Reyck B, Demeulemeester E (1998) Resource-constrained project scheduling: a survey of recent developments. Computers and Operations Research 25:279\u2013302","journal-title":"Computers and Operations Research"},{"key":"84_CR6","first-page":"825","volume":"73","author":"R. Kolisch","year":"2003","unstructured":"Kolisch R, Meyer K, Mohr R, Schwindt C, Urmann M (2003) Ablaufplanung f\u00fcr die Leitstrukturoptimierung in der Pharmaforschung. Zeitschrift f\u00fcr Betriebswirtschaft 73:825\u2013848","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"},{"key":"84_CR7","volume-title":"Entwicklung eines praxisnahen Project Scheduling Ansatzes auf der Basis von Genetischen Algorithmen","author":"A. Kuhlmann","year":"2003","unstructured":"Kuhlmann A (2003) Entwicklung eines praxisnahen Project Scheduling Ansatzes auf der Basis von Genetischen Algorithmen. Logos, Berlin"},{"key":"84_CR8","volume-title":"Wertorientiertes Projektmanagement in der Pharmaforschung","author":"K. Meyer","year":"2003","unstructured":"Meyer K (2003) Wertorientiertes Projektmanagement in der Pharmaforschung. Shaker, Aachen"},{"key":"84_CR9","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project Scheduling with Time Windows and Scarce Resources","author":"K. Neumann","year":"2003","unstructured":"Neumann K, Schwindt C, Zimmermann J (2003) Project Scheduling with Time Windows and Scarce Resources. Springer, Berlin"},{"key":"84_CR10","volume-title":"Topics in modern project scheduling","author":"K. Neumann","year":"2006","unstructured":"Neumann K, Schwindt C, Zimmermann J (2006) Resource-constrained project scheduling with time windows: Recent developments and new applications. In: Weglarz J, Jozefowska J (eds) Topics in modern project scheduling. Kluwer, Boston"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2006"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-69995-8_84.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,3]],"date-time":"2021-05-03T00:18:38Z","timestamp":1620001118000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-69995-8_84"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540699941"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-69995-8_84","relation":{},"subject":[]}}