{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T04:56:25Z","timestamp":1725512185644},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540728627"},{"type":"electronic","value":"9783540728634"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-72863-4_26","type":"book-chapter","created":{"date-parts":[[2007,8,3]],"date-time":"2007-08-03T21:55:21Z","timestamp":1186178121000},"page":"247-256","source":"Crossref","is-referenced-by-count":1,"title":["Research on Hybrid Distributed Manufacturing Execution System in Multi-location Enterprises Environment"],"prefix":"10.1007","author":[{"given":"Xiaobing","family":"Liu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hongguang","family":"Bo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yue","family":"Ma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qiunan","family":"Meng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"26_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(00)00240-X","volume":"133","author":"L. Tang","year":"2000","unstructured":"Tang, L., et al.: A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research\u00a0133, 1\u201320 (2000)","journal-title":"European Journal of Operational Research"},{"key":"26_CR2","doi-asserted-by":"crossref","unstructured":"Camarinha-Matos, L.M., Afsarmanesh, H.: The virtual enterprise concept. In: Proc. of the PRO-VE\u201999, Porto, Portugal, pp. 3\u201314 (1999)","DOI":"10.1007\/978-0-387-35577-1_1"},{"key":"26_CR3","unstructured":"Hino, R., Moriwaki, T.: Decentralized scheduling in holonic manufacturing systems. In: Proceedings of the 2nd International Workshop on Intelligent Manufacturing Systems, Leuven, Belgium, pp. 41\u201347 (1999)"},{"issue":"1","key":"26_CR4","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1109\/5.21079","volume":"77","author":"B.S. Gershwin","year":"1989","unstructured":"Gershwin, B.S.: Hierarchical flow control, a framework for scheduling and planning Discrete Events in Manufacturing System. Proc. of the IEEWE\u00a077(1), 195\u2013209 (1989)","journal-title":"Proc. of the IEEWE"},{"key":"26_CR5","doi-asserted-by":"crossref","unstructured":"Frankovi\u010d, B., Fogel, J.: Solution of Job Scheduling Problem in Multi Part Production System. In: IFAC Conference MCPL, Grenoble (2000)","DOI":"10.1016\/S1474-6670(17)39479-X"},{"key":"26_CR6","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1016\/S0360-8352(03)00077-9","volume":"45","author":"B.J. Park","year":"2003","unstructured":"Park, B.J., Choi, H.R., Kim, H.S.: A hybrid genetic algorithm for the job shop scheduling problem. Computer & Industrial Engineering\u00a045, 597\u2013613 (2003)","journal-title":"Computer & Industrial Engineering"},{"issue":"12","key":"26_CR7","doi-asserted-by":"publisher","first-page":"2280","DOI":"10.1109\/9.895564","volume":"45","author":"Y. Feng","year":"2000","unstructured":"Feng, Y., Yan, H.: Optimal Production control in a Discrete Manufacturing System with Unreliable Machines and Random Demands. IEEE Transactions on Automatic Control\u00a045(12), 2280\u20132296 (2000)","journal-title":"IEEE Transactions on Automatic Control"},{"key":"26_CR8","first-page":"30","volume-title":"Cost Accounting","author":"Q. OuYang","year":"2003","unstructured":"OuYang, Q., Wan, S.: Cost Accounting, pp. 30\u201333. Dongbei University of Finance & Economics Press, Dalian (2003)"},{"issue":"3","key":"26_CR9","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1016\/S0166-3615(02)00096-9","volume":"49","author":"A.T.M. Aerts","year":"2002","unstructured":"Aerts, A.T.M., Szirbik, N.B., Goossenaerts, J.B.M.: A flexible agent-based ICT architecture for virtual enterprises. Computer in Industries\u00a049(3), 311\u2013327 (2002)","journal-title":"Computer in Industries"},{"issue":"5","key":"26_CR10","doi-asserted-by":"publisher","first-page":"421","DOI":"10.1080\/09537280110042666","volume":"12","author":"K.D. Thoben","year":"2001","unstructured":"Thoben, K.D., Jagdev, H.S.: Typological issues in enterprise networks. Production Planning and Control\u00a012(5), 421\u2013436 (2001)","journal-title":"Production Planning and Control"},{"key":"26_CR11","volume-title":"Mastering Enterprise JavaBeans","author":"E. Roman","year":"2002","unstructured":"Roman, E.: Mastering Enterprise JavaBeans, 2nd edn. John Wiley & Sons, New York (2002)","edition":"2"}],"container-title":["Lecture Notes in Computer Science","Computer Supported Cooperative Work in Design III"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-72863-4_26.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T05:06:56Z","timestamp":1605762416000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-72863-4_26"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540728627","9783540728634"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-72863-4_26","relation":{},"subject":[]}}