{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,10]],"date-time":"2026-11-10T22:02:24Z","timestamp":1794348144387,"version":"4.9.0"},"publisher-location":"Berlin, Heidelberg","reference-count":12,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540728627","type":"print"},{"value":"9783540728634","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-72863-4_42","type":"book-chapter","created":{"date-parts":[[2007,8,3]],"date-time":"2007-08-03T17:55:21Z","timestamp":1186163721000},"page":"409-418","source":"Crossref","is-referenced-by-count":0,"title":["A GA Based Task Grouping for Top-Down Collaborative Assembly Design"],"prefix":"10.1007","author":[{"given":"Youdong","family":"Yang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shuting","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Zhihua","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shuming","family":"Gao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"42_CR1","first-page":"32","volume":"1","author":"D. Ren","year":"2005","unstructured":"Ren, D., Fang, Z.: Research on Task Scheduling in Concurrent Design. Computer Integrated Manufacturing Systems\u00a01, 32\u201338 (2005)","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"42_CR2","first-page":"440","volume":"4","author":"Q. Yuan","year":"2000","unstructured":"Yuan, Q., Zhao, R.: The Study of Theory and Method for Design Task Scheduling in Concurrent Engineering Environment. Chinese Journal of Computers\u00a04, 440\u2013443 (2000)","journal-title":"Chinese Journal of Computers"},{"key":"42_CR3","first-page":"36","volume":"4","author":"J. Zhao","year":"2001","unstructured":"Zhao, J., et al.: New Tearing Method of Task Set Within Concurrent Design Process. Computer Integrated Manufacturing Systems\u00a04, 36\u201340 (2001)","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"42_CR4","first-page":"500","volume":"5","author":"J. Cao","year":"1999","unstructured":"Cao, J., Zhao, H., Zhang, Y.: Research on Task Scheduling Method for Product Cooperative Design. China Mechanical Engineering\u00a05, 500\u2013504 (1999)","journal-title":"China Mechanical Engineering"},{"key":"42_CR5","first-page":"34","volume":"3","author":"Q. Zhong","year":"2000","unstructured":"Zhong, Q., Chen, H.: Genetic Operators in Task Matching and Scheduling. Journal of National University of Defense Technology\u00a03, 34\u201338 (2000)","journal-title":"Journal of National University of Defense Technology"},{"key":"42_CR6","first-page":"207","volume":"2","author":"X. Sun","year":"1999","unstructured":"Sun, X., Xiao, R., Li, L.: Explore on the Workload Model and the Total Consumption Model of the Planning of Concurrent Design. China Mechanical Engineering\u00a02, 207\u2013210 (1999)","journal-title":"China Mechanical Engineering"},{"key":"42_CR7","first-page":"149","volume":"2","author":"S. Gao","year":"2004","unstructured":"Gao, S., He, F.: Survey of Distributed and Collaborative Design. Journal of Computer-Aided Design & Computer Graphics\u00a02, 149\u2013157 (2004)","journal-title":"Journal of Computer-Aided Design & Computer Graphics"},{"key":"42_CR8","doi-asserted-by":"publisher","first-page":"835","DOI":"10.1016\/j.cad.2003.09.010","volume":"36","author":"L. Chen","year":"2004","unstructured":"Chen, L., Song, Z., Feng, L.: Internet-Enabled Real-Time Collaborative Assembly Modeling Via an E-Assembly System: Status and Promise. Computer-Aided Design\u00a036, 835\u2013847 (2004)","journal-title":"Computer-Aided Design"},{"key":"42_CR9","first-page":"39","volume":"27","author":"S.D. Eppinger","year":"1900","unstructured":"Eppinger, S.D., Whitney, D.E., Smith, R.P., et al.: Organizing The Tasks in Complex Design Projects. ASME DE\u00a027, 39\u201346 (1900)","journal-title":"ASME DE"},{"key":"42_CR10","volume-title":"Adaptation in Natural and Artificial Systems","author":"J.H. Holland","year":"1975","unstructured":"Holland, J.H.: Adaptation in Natural and Artificial Systems. MIT Press, Cambridge (1975)"},{"key":"42_CR11","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1023\/A:1010902015091","volume":"102","author":"S. Hartmann","year":"2001","unstructured":"Hartmann, S.: Project Scheduling With Multiple Modes: A Genetic Algorithm. Annals of Operations Research\u00a0102, 111\u2013135 (2001)","journal-title":"Annals of Operations Research"},{"key":"42_CR12","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1287\/opre.38.1.22","volume":"38","author":"K. Baker","year":"1990","unstructured":"Baker, K., Scudder, G.: Sequencing with Earliness and Tardiness Penalties: A Review. Operations Research\u00a038, 22\u201336 (1990)","journal-title":"Operations Research"}],"container-title":["Lecture Notes in Computer Science","Computer Supported Cooperative Work in Design III"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-72863-4_42.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T00:07:02Z","timestamp":1605744422000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-72863-4_42"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540728627","9783540728634"],"references-count":12,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-72863-4_42","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/978-3-540-72863-4","asserted-by":"object"}]},"subject":[]}}